STC Clear View User manual

Y
e
a
r
s
W
a
r
r
a
n
t
y
P
C
S
H
E
L
L
7
10
Y
e
a
r
s
W
a
r
r
a
n
t
y
S
T
R
U
C
T
U
R
E
Clear ViewTM
Systems Trading Corporation
450 7th Avenue Suite 2809, New York, NY 10123
8’ x 12’ Greenhouse
Assembly Instructions


Introduction
Before Starting Assembly:
5. Make sure you have the proper tools:
After choosing a location, proper preparation of the site is essential. The site must be level. If the site is
not level, create a base slightly larger than the outside dimensions of the greenhouse using a perimeter
diagonals from both sides and making sure they are equal. The greenhouse is secured from the inside
with pegs into holes cast with concrete. See step15 for details.
level. Make sure you have checked with your local authorities regarding any required building permits.
water drainage and easy access to power and water necessary for greenhouse gardening.
Choose a sunny, level position away from overhanging trees and power lines and protected from the
wind as much as possible. The location should be away from structures that could cause snow to drift
on or around the greenhouse.
Locate underground pipes or cables before preparing the site or anchoring the greenhouse.
The List of Parts has the corresponding step number referenced to each part. We recommend that
while you go through the list, make staging areas for each step and place the parts necessary for
2. Lay the parts out in separate staging areas:
3. Select a Location:
4. Prepare a Foundation:
1. Make sure you have all the necessary parts:
Compare the contents of the two cartons to the List of Parts. If any parts are missing or damaged or
you have any questions, please contact Customer Service by phone at (877) 407-9100 ext. 1 or by email
CAREFULLY READ ALL INSTRUCTIONS BEFORE YOU BEGIN AND FOLLOW THE STEPS IN
THE ORDER THEY ARE PRESENTED.
NOTE: A cordless drill with Phillips head bit is highly recommended but not essential.
Tape Measure
Work Gloves
Safety Goggles
Phillips Screwdriver
Spirit Level
Small Step Ladder
Wooden Mallet
Liquid Soap or WD40 Lubricant
Scissors
Hex Key (included)
•
•
•
•
•
•
•
•
•
•
1 of 56
www.stcny.com
Thank you for purchasing the 8x12 Clear ViewTM Greenhouse. This greenhouse combines clear window
shaped panels for the sides with the functionality of twin panel polycarbonate panels to help maintain
consistent temperature. This model features two roof vents and a circular air vent to ensure proper
ventilation. We have also included an automatic vent opener to help you maintain optimal temperature
eortlessly. Properly assembled and maintained, this greenhouse will provide many years of enjoyment.
Our patented greenhouse has been designed to be easily assembled. All but one step can be completed
by one person. You will need assistance from another person to attach the roof. Although the greenhouse
can be assembled in six to eight hours, we recommend you take your time and make it a weekend project.
These instructions include helpful hints and important information needed to safely assemble and properly
maintain the greenhouse. Please read these instructions completely before you begin.

General Order of Assembly
Step 1: Assemble Back
Step 2: Assemble Doors
Step 3: Assemble Front
Step 4: Assemble Sides
Step 5: Prepare Shelves
Step 6: Connect Sides to Back
Step 7: Connect Sides to Front
Step 8: Assemble Roof Vents
Step 9: Connect Gables and Roof Vents
Step 10: Brace Sides
Step 11: Install Circular Vent
Step 12: Install Side and Roof Panels
Step 13: Install Trim Plates
Step 14: Hang Doors
Step 15: Secure to Ground
Step 16: Install Trays and Bin Holder
1
3
4
9
5
8
13
12
11
14
16
6
7
2
2
10
2 of 56
www.stcny.com
Introduction .....................................
Safety Advice .................................
General Order of Assembly ......
List of Parts ......................................
Assemble Back ...............................
Assemble Door ..............................
Assemble Front .............................
Assemble Sides .............................
Prepare Shelves ............................
Connect Sides to Back ...............
Connect Sides to Front .............
Assemble Roof Vent ...................
Connect Gables ...........................
Install Roof Vent .........................
Brace Sides ...................................
Install Circular Vent ..................
Install Side and Roof Panels ...
Install Trim Plates .......................
Hang Doors ..................................
Secure to Ground .........................
Install Trays and Bin Holder .......
Safety Advice
The greenhouse must be positioned and xed on a at
level surface.
Dispose of all plastic bags safely. Keep them out of the
reach of small children.
Keep children and pets away from the assembly area until
the work is completed.
Always wear shoes, gloves and safety goggles when working.
In manufacturing all sharp edges and burs have been removed
but caution should still be taken when handling metal parts.
Do not lean against or push the greenhouse during assembly.
Take special care not to touch overhead power lines with the
aluminium proles.
Do not attempt to assemble the greenhouse in windy or wet
conditions.
Do not position your greenhouse in an area exposed to
excessive wind.
If using power tools or a step ladder always follow the
manufacturers safety instructions.
Hot items such as recently used grills, blow torches etc.,
must not be stored in the greenhouse.
Store the polycarbonate panels in a cool dark place like a
garage until you are ready to use them.
Make sure the greenhouse complies with local building codes.
Table of Contents
1
2
2
3
6
15
21
29
35
36
38
41
42
45
48
50
51
52
54
55
56

List of Parts
!
The greenhouse is shipped in three cartons. These cartons are heavy. Be careful when lifting them.
Wear proper safety gear including work shoes, gloves and goggles.
Place all the parts for each step in staging areas, checking that you have all parts as you go.
If any parts are missing or damaged, contact STC customer service before beginning assembly:
G14A
G14C
G14D
2
2
2
Step 5
G14B 2 Step 5
Step 5
Step 5
G14I 2 Step 5
G14J 2 Step 5
G06A
G06K 1
1 Step 3
G10A 2 Step 8
G11A 2 Step 8
G12B 4 Step 8
G06J 1 Step 3
G07C 2 Step 4
G07D 2 Step 4
Step 3
QTY
G13B
2
1
1
1
1
1
1
Step 2
Step 2
Step 2
Step 2
Step 2
Step 2
Step 2
G13C
G13D
G13E
G13G
G13H
G18A
1 Step 3G17A
1 Step 3G17B
1 Step 1G17C
1 Step 1G17D
G05D
L05D
1
1
4
2
Step 1
Step 9
Step 9
Step 2
G05G
G05H
G05I
QTY
G01D
G02A
G02H
G02I
G02J
G02K
G02L
1
1
1
1
2
1
1
1
1
1
4 Step 4
Step 1
Step 3
Steps 1,3
G02B 2 Steps 1,3
Step 1
Step 1
Step 9
G02N 1 Step 9
Step 1
Step 3
G03B
G03D
G03K
G03M
G03L
G03N
1
4
1
Step 4
G03C 1
1
1
4
1
1
1
Step 1
Step 1
Step 1
Step 1
G03W 1 Step 3
G03T 2 Step 4
G03V 4 Step 4
Step 9
Step 9
Step 9
Step 9
Step 9
G04C
G04D
4
4
G04G 2 Step 16
G04B 4 Step 4
Step 4
Step 4
G03R
G03Q
G03S
2 Step 9
G03U
Step 3
Step 3
G01I
G01J
G01K
G01L
3 of 56
www.stcny.com

Clear Panel QTY
1 Step 3
1 Step 1
GY1
2 Step 2GY11
GY8
1 Step 1GY9
2 Step 1GY2
1 Step 3GY5
2 Step 2GY10
1 Step 3GY6
1 Step 1GY7
Twin Panel QTY
4 Step 12Y21
6 Step 12Y22
2 Step 12Y23
2 Step 8Y28
Clear Panel QTY
4 Step 12
1 Step 3
GY21
GY18
2 Step 1
GY19
8 Step 12
GY12
1 Step 1
GY13
2 Step 1
GY20
1 Step 1
GY16
1 Step 3
GY17
4 of 56
www.stcny.com
Door Handle QTY
S29
S30
S31
S33
S44
2
1 Step 2
Step 2
Step 2
Step 2
Step 2
1
1
1
1
S25 Step 8
Roof Vent Handle QTY
2
4
S40
S40A
Step 2
Step 2
Door Lock QTY
1S41 Step 9
2
S41A Step 9
Auto Vent Opener QTY
S06
S07
S16
hex key
G15D
S23
4
1
2
24 Steps 1,3,10
Steps 1,3,10
Steps 1,3
8
9 Step 9
Step 910
Step 2
Bracing Parts QTY
circular vent
vent frame
plastic nut 4
4
1 Step 11
1 Step 11
Step 11
Step 11
Circular Vent QTY
#S42 screw

30
J05 Step 16
Shelf Trays QTY
5 of 56
www.stcny.com
Connector QTY
22
12
4
Steps 2,3,4
Steps 1,3
Step 1,3
1
1
Step 3
Step 3
Step 3
1
Steps 1,3,4
S11
S17L
S17R
S08
S08C
S01
12
3
Steps 5,15S37
G16A
4 Step 9
8 Step 4
S22
S20
Connector QTY
239
18
18
Steps 1,2,9
Steps 1,2,9
Step 8
4 Step 16
Steps 1,2,3,4,9
S13
2
S14
S24
Step 92S42
Step 88S26
S36
S02
Connector QTY
6
2
2
Steps 1,3
Steps 1,3
2 Steps 1,3
2 Steps 1,3
Step 4
S05
S09
S10
S04
S03
2 Step 4
S19
4 Step 4S39
1 Step 9
S21
1
10 Steps 2,3
Step 3
1 Step 1
S28
S18
S12
10
10
S34
S35
Step 15
Step 15
Anchor Clip and Peg QTY
G09C 2 Step 13
G09D 2 Step 13
J02L 2 Step 13
J02R 2 Step 13
J03 2 Step 13
J06 1 Step 13
Trim Plate QTY

1.1A
Assemble Back
1.2A
Secure with S02 screws.
1.1B
Secure with S02 screws.
1.2B
26”
(600 mm)
G02B
G02A
S01
QTY
4
6
#S01
#S02
QTY
1
1
1
1#G03C
#G03D
Prole Connector
QTY
Prole
#G02A
#G02B
Line up bottom hole on short side of
connectors S01 with hole on side of
proles G03C and G03D.
Slide short side of connector S01 into channels of proles G02A and G02B.
Line up last hole on connector S01 with hole in each prole.
S01
S02
S02
Place all the parts for the back face on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
IMPORTANT: The holes are not at the midpoint of the prole.
Arrange prole so the 26” portion will be the bottom when standing.
6 of 56
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
!
26”
(600 mm)
G03C G03D

1.3A
1.3B
Secure with four S02 screws.
Attach proles G02B and G03C to prole G17C by sliding the long sides of
connector S01 into channels lining up last hole in S01 with holes in prole
G17C. Attach proles G03D and G02A to prole G17D by sliding the long
side of connector S01 into prole channels lining up last hole of
S01 with holes in G17D.
7 of 56
www.stcny.com
G02B
G03D
G03C
G03C G03D
G02A
G17D
G17C
G02B
NOTE: ALL VIEWS ARE FROM INSIDE.
G17D
G17C
QTY
QTY
1#G17D
1#G17C
Prole Screw
4#S02
G02A

Slide connector G16A inside proles G03L and G03K. The two end holes on each
side of connector G16A line up with the two holes on each prole.
Slide connectors S08 into channels
of proles G03C, G03D and G03K.
1.4A
1.5A
Secure with four S02 screws.
1.4B
Secure each connector with
two S02 screws.
1.5B
QTY
6
3
#S02
#S08
Connector
G03L
S08
S02
NOTE: ALL VIEWS ARE FROM INSIDE
G02B G03C
S08
S08
G03D
G02A
G03L
G03K
S08
G03K
G03L
S02
S02
G03K
#S02
QTY
1
4
QTY
1
1
#G16A
#G03L
#G03K
Prole Connector
8 of 56
www.stcny.com
G16A

1.6A
1.6C
1#S05#S04
QTY
QTY
1
Connector Connector
S04
S05
G01I
S04
G01I
S05
G01J
G01J
Slide connectors S04 into prole G01I and connector S05 into prole G01J until they securely
click into place.
Connectors S04 and S05 CLICK into place.
There is only one way to properly fasten connectors into proles. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
prole. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
G16A
G01I
G01J
Slide connector G16 inside proles G01I and G01J.
#S02
QTY
1
2
QTY
1
1
#G16A
#G01J
#G01I
Prole Connector
Line up the outside holes on G16A with second
hole on proles G01I and G01J. Secure with two
S02 screws.
1.6B
NOTE: ALL VIEWS ARE FROM INSIDE
9 of 56
www.stcny.com
G01I
G01J

1.7
1.8A
Carefully line up connector S04 with prole G02B and
connector S05 with prole G02A. Slide proles G01I and G01J half way into place. Continue
sliding until connectors S04 and S05 click securely into proles.
QTY
6#S02
Screw
Line up holes on connectors S08 with holes in
proles G01I and G01J. Secure each connector
with two S02 screws.
1.7B
NOTE: ALL VIEWS ARE FROM INSIDE.
G01I
S02
S08
10 of 56
www.stcny.com
S04
S05
G01I
G01J
G02B
G03C
G03K
G03L
G03D
G02A
G02B
G03C
G03K
G03L
G03D
G02A
Remove protective plastic from EACH side of clear
panels before installing. Dispose of plastic properly.
Install with outward curved side FACING DOWN.
!
G17D
QTY
2
Clear Panel
#GY2
GY2
GY2
Remove protective plastic from both sides of panels
GY2 . The clear panels are designed with
window shapes that curve outward.
Place the outward curved side
facing down. The rst row of
ribbed edges t securely into
V-channels of proles G02A,
G02B, G03C, G03D, G17C
and G17D.
Connectors S04 and S05 CLICK into place.
There is only one way to properly fasten connectors into proles. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
prole. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
GY2

G02B
G03C
G03D
G03L
G02A
1.9A
Slide hex bolt S13 into channels of four G05H proles as shown.
11 of 56
www.stcny.com
Screw hex nut S14 onto bolt. Do not
completely tighten.
1.9B
QTY
QTY
4#L05H
Prole Bolt/Nut
6
6
#S13
#S14
S13
S14
G05H
G05H
G05H
G05H
G05H
1.10A
1.10B
Line up GY20 and GY21 panels between proles
G05H as shown. The rst row of ribbed edges t
securely into the V-channels.
Slide panels with proles G05H into V-channels of
proles G02A, G02B, G03C,
G03D, G03L and G03K.
NOTE: ALL VIEWS ARE FROM INSIDE.
Remove protective plastic from both sides of panels GY20 and GY21. The clear panels are
designed with window shapes that curve outward. Place the outward curved side facing down.
Remove protective plastic from EACH side of clear
panels before installing. Dispose of plastic properly.
Install with outward curved side FACING DOWN.
!
G05H
GY20
GY21
G05H
G05H
G05H
GY20
GY20
GY21
GY21
GY20
GY21
G05H
QTY
2
QTY Clear PanelClear Panel
#GY21
2
#GY20
NOTE: Insert two sets of nuts and bolts into two G05H proles.
The other two G05H proles have one set of nuts and bolts.
G05H
G05H
G05H G05H

1.10C
1.11A
Slide hex nut S14 and hex bolts S13
into U-cutout in sides of proles
G03C, G03D, G03L and G03K.
Tighten securely to hold in place.
QTY
1#S12
Connector
QTY
1#S09
QTY QTY
1#S10
ConnectorConnectorProle
1
1
#G02I
#G02J
There is only one way to properly fasten connectors into proles. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
prole. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
NOTE: ALL VIEWS ARE FROM INSIDE.
Slide proles G02I and G02J into connectors
S09, S10 and S12 until they click into place.
G02I
S09
S10
G02J
S12
G02J
G02I
Connectors S09, S10 and S12 CLICK into place.
IMPORTANT: The ho
les are not at t
he
midpoint
of the proles. Arrange prole so the 24.5”
portion will be the bottom when standing.
NOTE: The top set of G05H proles have
nuts and bolts only next to prole G03L.
G02J
G02I
S12
S09
S10
24.5”
(623 mm)
24.5”
(623 mm)
12 of 56
www.stcny.com
Slide panels into V-channels on proles G02A, G02B, G03C, G03D and G03L. Fit
inside V-channels on proles G05H. The rst row of ribbed edges t securely into
the V-channels.
QTY
1
QTY Clear PanelClear Panel
1
#GY7
1
#GY8
#GY16
1
#GY17
1.10D
Remove protective plastic from both sides of panels GY7, GY8, GY16 and
GY17. The clear panels are designed with window shapes that curve
outward. Place the outward curved side facing down.
Remove protective plastic from EACH side of clear
panels before installing. Dispose of plastic properly.
Install with outward curved side FACING DOWN.
!
GY8
GY7
GY16
GY17
G03C
G03D
G03L
G03L
G05H
G05H
G05H
G05H

1.12A
Place connectors S11 onto proles G02I
and G03C, G02J and G03L and G02J and
G03D matching up all holes.
Screw S02 screws partially into
bottom two holes. Do not tighten.
Screw S02 screws into top two holes.
Tighten all screws. Repeat for both sides.
1.12C
1.12B
There is only one way to properly fasten connectors into proles. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
prole. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
Slide connectors S09 and S10 half way into proles G02A and G02B.
Continue sliding together making sure rst
row of ribbed edges on panels GY7,
GY8, GY16 and GY17 t securely
into V-channels of proles G02I
and G02J. Connectors click
securely into proles.
S11
S02
S02
S10
G02A
S09
G02B
Connectors S09 and S10 CLICK into place.
1.11B
S02
S02
S09
S10
QTY
12
3
#S02
#S11
Connector
13 of 56
www.stcny.com
GY8
GY7
GY16
GY17
G02I
G02J
NOTE: ALL VIEWS ARE FROM INSIDE.
G03C
G03L
G03D
G02I G02J
Other manuals for Clear View
3
Other STC Greenhouse Kit manuals
Popular Greenhouse Kit manuals by other brands

VOLYA
VOLYA DACHNAYA DVUSHKA Assembly manual

VOLYA
VOLYA DACHNAYA-STRELKA 2011 Assembly manual

Woodpecker Joinery
Woodpecker Joinery BRAMSHALL installation instructions

Mercia Garden Products
Mercia Garden Products 04MINIG-V1 General instructions

Vitavia
Vitavia Calypso 3000 Assembly instructions

Exaco
Exaco Junior Victorian Assembly instructions

Dancover
Dancover ASTRA GH120150 manual

Palram
Palram CANOPIA HARMONY How to assemble

Grandio
Grandio GRA-88BR-GR user manual

CASTLE GREENHOUSES
CASTLE GREENHOUSES Lean-To Tutbury Series manual

Gainsborough
Gainsborough K164 Assembly instructions/Instructions for use

Gazebo penguin
Gazebo penguin W1608-32 Assembly instructions