Sunman eArc User manual

eArc™PV System
Installation Manual

Contents
Purpose of this guide
Features & Benefits
Notices
General safety
Handling safety
Installation safety
Fire safety
Production Identification
Mechanical Installation
Grounding
Electrical installation
Maintenance and care
Disclaimer of liability
Products Data

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 1 / 29
TM
Purpose of this guide
•This guide contains information regarding the installation and safe handling of Sunman (Zhenjiang)
Company Limited eArc PV system. Sunman (Zhenjiang) Company Limited referred to as “SUNMAN”.
•Installers must read and understand this guide prior to installation. For any questions, please contact
SUNMAN’s Customer Service Department “or our local representatives” for more detailed information.
Installers should follow all safety precautions described in this guide as well as local codes when
installing a eArc.
•Before installing a solar photovoltaic system, installers should familiarize themselves with its
mechanical and electrical requirements. Keep this guide in a safe place for future reference (care and
maintenance) and in case of sale or disposal of eArc.
•SUNMAN’s eArc are tested and certified for installations worldwide. Different regions may have
different regulations for solar PV installations.

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 2 / 29
TM
Features & Benefits
•Flexible layouts
•eArcTM PV system can be installed at any shape roofs, which has integrated appearance with buildings.
Providing aesthetic seamless look.
•Maximization installation coverage of panels over any kind of roof.
•Quick installation
•Ultra-thin and light design to save installation labour

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 3 / 29
TM
Notices
This manual contains important installation instructions for the core hardware components required
for eArcTM PV System PV arrays.
Copyright and Trademark Information
Copyright © 2019 by Sunman (Zhenjiang) Company Limited. All rights reserved.
eArc and the SUNMAN logo are trademarks of Sunman (Zhenjiang) Company Limited.
Warranty Warnings
“WARRANTY VOID IF NON-SUNMAN-CERTIFIED HARDWARE IS ATTACHED TO eArcTM PV System.”
For Further Information
For additional technical support documentation, please visit the Support page of the SUNMAN web
site at www.sunman-energy.com

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 4 / 29
TM
General safety
•eArc that fall under this application class may be used in system operation at more than 50V DC or
240W, where general contact access is anticipated. eArc are qualified for safety under IEC 61730-2 and
within this application class are considered to meet the requirements for Safety Class II.
•eArc are qualified for Application Class A(IEC 61730-1).
•Installing solar photovoltaic systems requires specialized skills and knowledge. Installation should only
be performed by qualified personnel.
•Installers should assume all risks of injury that might occur during installation, including, but not limited
to, the risk of electric shock.
•One single eArc may generate more than 30V DC when exposed to direct sunlight. Contact with a DC
voltage of 30V or more is potentially hazardous.
•Do not disconnect during load connection.
•Photovoltaic solar eArc convert light energy to direct current electrical energy. They are designed for
outdoor use. eArc can be ground mounted, mounted on rooftops, vehicles or boats. The proper design
of support structures lies within the responsibility of the system designers and installers.
•Do not use mirrors or other magnifiers to concentrate sunlight onto eArc.
•When installing the system, abide to all local, regional and national statutory regulations. Obtain a
building permit if necessary.
•eArc electrical characteristics are within ±10% of the indicated values of Isc, Voc and Pmax under
standard test conditions (Irradiance of 1000W/m², AM 1.5 spectrum, a cell temperature of 25℃).
•Only use equipment, connectors, wiring and support frames suitable for solar electrical systems.
•“Always use fall protection equipment when working from heights of 6 feet (183cm)or above”.
Follow Occupational Safety and Health Act (OSHA) or local governing safety regulations regarding fall
protection. (UL only)

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 5 / 29
TM
Handling safety
•Do not lift eArc by grasping eArc’junction box or electrical leads.
•Do not stand, step or walk on any side of eArc.
•Do not drop eArc or allow objects to fall on eArc.
•Do not place any heavy objects on eArc.
•Be cautious when placing eArc down onto a surface, particularly when placing it in a corner.
•Inappropriate transport and installation may damage eArc panel and void the warranty.
•Do not attempt to disassemble eArc, and do not remove any attached nameplates or components from
eArc.
•Do not apply paint or adhesive to eArc’top surface.
•To avoid damage to the front cover and backsheet: do not scratch, dent or hit the front cover and
backsheet.
•Do not drill holes in the ribs. This may compromise the frame strength, cause corrosion of the ribs and
void the warranty.
•Do not scratch the anodized coating of the ribs (except for grounding connection). It may cause
corrosion of the ribs or compromise the ribs strength.
•A panel with broken front plate or torn back sheet cannot be repaired and must not be used since
contact with any panel surface or the ribs can cause an electric shock.
•Work only under dry conditions, and use only dry tools. Do not handle panels under wet conditions
unless wearing appropriate protective equipment.
•When storing uninstalled panels outdoors for any period of time, always cover the panels and ensure
that the front cover faces down “on a soft flat surface” to prevent water from collecting inside the panel
and causing damage to exposed connectors.

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 6 / 29
TM
Installation safety
•Never open electrical connections or unplug connectors while the circuit is under load.
•Contact with electrically charged parts of the panels, such as terminals, can result in burns, sparks and
lethal shock whether or not the panel is connected.
•Do not touch eArc unnecessarily during installation. The front surface and the ribs may be hot; there is
a risk of burns and electric shock.
•Do not work in the rain, snow or in windy conditions.
•Avoid exposing cables to direct sunlight in order to prevent insulation degradation.
•Keep children well away from the system while transporting and installing mechanical and electrical
components.
•Completely cover eArc with an opaque material during installation to prevent electricity from being
generated.
•Do not wear metallic rings, watchbands, earrings, nose rings, lip rings or other metallic objects while
installing or troubleshooting photovoltaic systems.
•Use only insulated tools that are approved for working on electrical installation.
•Follow the safety regulations for all other system components, including wires and cables, connectors,
charging regulators, inverters, storage batteries, rechargeable batteries, etc.
•Under normal conditions, a photovoltaic eArc is likely to experience conditions that produce more
current and/or voltage than reported at standard test conditions. Accordingly, the values of Isc and Voc
marked on this eArc should be multiplied by a factor of 1.25 when determining component voltage
ratings, conductor current ratings, fuse sizes, and size of controls connected to the PV output.
•Only use same or connectable connectors to connect eArc to form a string, or connect to another device.
Removing the connectors will void the warranty.

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 7 / 29
TM
Fire safety
•Consult your local authority for guidelines and requirements for building or structural fire safety.
•Roof constructions and installations may affect the fire safety of a building; improper installation may
create hazards in the event of a fire.
•Use components such as ground fault circuit breakers and fuses as required by local authority.
•Do not use panels near equipment or in places where flammable gases may be generated.
•eArc have been rated Fire Class C, and are suitable for mounting on to a Class A roof.

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 8 / 29
TM
Production Identification
Each eArc has two labels providing the following information:
•Nameplate: describes the product type; rated power, rated current, rated voltage, open circuit voltage,
short circuit current, all as measured under standard test conditions; weight, dimensions etc.; the
maximum system voltage is 1000 volts.
•Barcode: each individual eArc has a unique serial number. The serial number has 18 digits. The 1th to
4th digits are the module type for internal use, and the 5th and the 6th digits are the year code, and
the 7th and 8th digits are the month and the 9th and the 10th digits are the week code, and the 11th
and the 15th digits are order number, and the 16th and the 18th digits are the sequence codes. For
example, XXXX160417XXXXXXXX means the module was made in the 17th week of 2016. Each module
has only one bar code. It is permanently attached to the interior of eArc and is visible from the top front
of eArc. This bar code is inserted prior to lamination.

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 9 / 29
TM
Mechanical Installation
Selecting the location
•Select a suitable location for installing eArc.
•eArc should face south in northern latitudes and north in southern latitudes to maximise generation.
•For detailed information on the best installation angle, refer to standard solar photovoltaic installation
guides or consult a reputable solar installer or systems integrator.
•eArc should not be shaded at any time. If an eArc is shaded or even partially shaded, it will fail to
perform at ideal conditions and result in lower power output.
•Do not use eArc near equipment or in locations where flammable gases may be generated or collected.
General installation
•eArc mounting structure must be made of durable, corrosion-resistant and UV-resistant material.
•Always observe the instructions and safety precautions included with eArc support frames.
•Do not drill additional mounting holes in the PV panel’s ribs as this will void the warranty.
•Before installing eArc on a roof, always ensure the roof construction is suitable. In addition, any roof
penetration required to mount eArc must be properly sealed to prevent leaks.
•Dust building up on the surface of eArc can impair with eArc performance. SUNMAN recommends
installing eArc with a tilt angle of at least 10 degrees, making it easier for dust to be washed off by rain.
•Always keep the back sheet of the panel free from foreign objects, “plants and vegetation”, or structural
elements, which could come into contact with the panel, especially when the panel is under mechanical
load.
•Ensure panels are not subject to wind or snow loads exceeding the maximum permissible loads, and
are not subject to excessive forces due to the thermal expansion of the support structures: Refer to the
following installation methods for more detailed information.
eArc product design loads
•All eArcTM product have been evaluated for test loads of 2400 Pa with the following solutions.
Mechanical Installation
Quick-bonding Installation
▶For SMD and SMF Series
SMDxxxM-6X12DW; SMDxxxM-6X10DW; SMDxxxM-4X12DW; SMDxxxM-4X09DW;
SMDxxxM-6X12UW; SMDxxxM-6X10UW; SMDxxxM-4X12UW; SMDxxxM-4X09UW;
SMDxxxF-6X24DW; SMDxxxF-6X20DW; SMDxxxF-4X24DW; SMDxxxF-4X18DW;
SMDxxxF-6X24UW; SMDxxxF-6X20UW; SMDxxxF-4X24UW; SMDxxxF-4X18UW;
SMDxxxF-6X24DB; SMDxxxF-6X20DB; SMDxxxF-4X24DB; SMDxxxF-4X18DB;

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 10 / 29
TM
SMDxxxF-6X24UB; SMDxxxF-6X20UB; SMDxxxF-4X24UB; SMDxxxF-4X18UB;
SMFxxxM-6X12DW; SMFxxxM-6X10DW; SMFxxxM-4X12DW; SMFxxxM-4X09DW;
SMFxxxM-6X12UW; SMFxxxM-6X10UW; SMFxxxM-4X12UW; SMFxxxM-4X09UW; SMFxxxM-5X12UW;
SMFxxxF-6X24DW; SMFxxxF-6X20DW; SMFxxxF-4X24DW; SMFxxxF-4X18DW;
SMFxxxF-6X24UW; SMFxxxF-6X20UW; SMFxxxF-4X24UW; SMFxxxF-4X18UW;
SMFxxxF-6X24DB; SMFxxxF-6X20DB; SMFxxxF-4X24DB; SMFxxxF-4X18DB;
SMFxxxF-6X24UB; SMFxxxF-6X20UB; SMFxxxF-4X24UB; SMFxxxF-4X18UB;
▶List Of Tools Required For Installation
•Sunman SMD / SMF panel
•Automatic Silicone caulking gun + nozzle
•EITHER Tonsan 1527 and Isopropyl alcohol OR Sika Sikasil SG-20 and Sika Aktivator-205
•Rags / flat cloth mop
•String line
•Portable water pump / pest control pump
•Optional: Sika Double sided tape
▶Overview
The Sunman SMD Series use quick and easy installation method which is called “Quick-bonding”. Quick
bonding allows you to install a Sunman SMD module directly to an approved metal surface using an
approved structural grade silicone. Quick bonding can be direct to the roof or on Aluminium 6065-T5
raining, such as the product from Unistrut. Please ensure the surface is clean, free of dust and debris,
before application as this may inhibit adhesion.
Please note: Please contact Sunman to complete Installation training before
attempting your first installation.
a. Confirmation of roofing material
•Please clearly identify the roof material before installation as the type of the roof material directly
affects the strength of the adhesion.
A) Confirmation of
roofing material
B) Site planning
C) Preparation of
bonding material
D) Clean the color
steel roofing
F) Installation
E) Install chemical
bonding material

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 11 / 29
TM
•Sika Sikasil SG-20 is suitable to be used on: BlueScope Colorbond steel (excluding matte finishes),
Zincalume and Aluminium 6065-T5
•Tonsan 1527 is suitable to be used on: BlueScope Colorbond steel (Surfmist, Shale Grey, Windspray,
Woodland Grey, Monument, Pale Eucalypt, Ironstone, Dune. Excluding matte finishes), Zincalume and
Aluminium 6065-T5
•Please consult Sunman engineering certificates for more information. Any other roof sheeting requires
consolation with Sunman or its local importer.
b. Site planning
•Do not install using quick bonding method when rain is present
•Do not install using quick bonding method when wind speeds are greater than 10m/s are present at
the site within 24 hours
•Roof temperature and ambient temperature during installation shall be between -15℃and 45℃during
application of silicone, as per the installation manuals of the silicone.
•If the roof profile is Kliplok-406 or Kliplok-700, adhesion points are to be placed as specified in the
appendix, otherwise a generic case installation is to be used.
•For generic install, the roof profile to meet the below requirements.
•Do not install the SMD panel directly over screw lines
c. Preparation of bonding material
•Prepare silicone nozzle by cutting a circular opening 5-8mm wide, then cutting a V shape to one side 5-
8mm long. This will ensure proper wet-out onto the substrate and a uniform adhesive thickness is
achieved. Fix the nozzle onto the silicone gun.
Max Span=380mm
Max Span=380mm
Min Span=10mm
Min Span=10mm
Min Span=20mm

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 12 / 29
TM
d. Clean the color steel roofing
•To ensure silicone achieves sufficient bond, the roof must be thoroughly cleaned, free of dirt, debris
and metal powder. If you are unsure of the state of the roof, please contact Sunman for assistance.
•Clean off excess dirt and debris off the roof sheet with rags and water. Leave to dry. If it is extremely
dirty, pressure cleaning with water is recommended.
•If using Tonsan 1527, clean the roof with isopropyl alcohol and wait to dry.
•If using Sika SG-20, apply the Sika Aktivator-205 on to clean cloth. Wiping down the roof, apply to the
adhesion area. Reapply until clean. Leave to dry.
e. Install chemical bonding material
•Consult and strictly adhere to installation requirements specified in the Sunman engineering
certificates
•Do not install apply silicone to roof while moisture is present
•Apply the silicon with the nozzle perpendicular to the roof. The length of the chemical bonding material
shall span the full length of the contact interface, i.e. if the panel is installed in landscape, the silicone
bead shall span the full width of panel and if the panel is installed in portrait, the silicone bead shall
span the full length of panel
•Do not let a “skin” form over the silicone. This will directly impede the final curing strength. To manage
this, only apply enough silicone to the roof for one module at a time. See note from Sika installation
manual below on how to check for the presence of a “skin” over the silicone:

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 13 / 29
TM
•Please see below for proper bead application
f. Layout of SMD Series
•Layout (For SMD Series: SMDxxxM-6X12DW, SMDxxxM-6X12UW, SMDxxxM-6X10DW, SMDxxxM-
6X10UW)

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 14 / 29
TM
•Layout (For SMD Series: SMDxxxM-4X12DW, SMDxxxM-4X12UW, SMDxxxM-4X09DW, SMDxxxM-
4X09UW)
•Layout for landscape installation with generic roof profile

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 15 / 29
TM
•Layout for portrait installation with generic roof profile

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 16 / 29
TM
•Layout for rail mounting
▶Note:
•Please refer to appendix regarding Kliplok 406-like and Kliplok 700-like roof sheeting mounting.
•Please contact the local distributors if you are not sure whether your color steel roofing is suit for SMD
Series or you have any question about this installation method.
•Please contact the local distributors if you want to remove SMD Series from your color steel roofing.
•If installation method is strictly adhered to, Sunman will provide a 10 year warranty for the Tonsan 1527
Framed Installation
▶For SMB Series
SMBxxxM-6X10DW, SMBxxxM-4X12DW, SMBxxxM-4X09DW, SMBxxxM-6X12UW,
SMBxxxM-6X10UW, SMBxxxM-4X12UW, SMBxxxM-4X09UW, SMBxxxF-6X24DW,

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 17 / 29
TM
SMBxxxF-6X20DW, SMBxxxF-4X24DW, SMBxxxF-4X18DW, SMBxxxF-6X24DB,
SMBxxxF-6X20DB, SMBxxxF-4X24DB, SMBxxxF-4X18DB
•Clamps can be used for the connection of SMB series components and support system. The
installation must be completed according to the following example, otherwise the warranty will be
invalid.
•Horizontal installation of SMB series components.
•SMB series components must be properly secured to their supports so that they can withstand the
pressure of the load, including the rise and pressure of the wind. It is the responsibility of the installer
to ensure that the mounting fixture used ensures that the assembly is strong enough.
•Layout(For SMB Series: SMBxxxM-6X12DW, SMBxxxM-6X10DW, SMBxxxM-4X12DW, SMBxxxM-
4X09DW, SMBxxxM-6X12UW, SMBxxxM-6X10UW, SMBxxxM-4X12UW, SMBxxxM-4X09UW, SMBxxxF-
6X24DW; SMBxxxF-6X20DW; SMBxxxF-4X24DW; SMBxxxF-4X18DW; SMBxxxF-6X24DB; SMBxxxF-
6X20DB; SMBxxxF-4X24DB; SMBxxxF-4X18DB )

© 2021 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice.
www.sunman-energy.com
version 2021A page 18 / 29
TM
Specifications
AMAX(mm)
AMIN(mm)
SMBxxxM-6X12DW;
SMBxxxM-6X12UW;
SMBxxxF-6X24DW;
SMBxxxF-6X24DB
450
250
SMBxxxM-6X10DW;
SMBxxxM-6X10UW;
SMBxxxF-6X20DW;
SMBxxxF-6X20DB
400
210
SMBxxxM-4X12DW;
SMBxxxM-4X12UW;
SMBxxxF-4X24DW;
SMBxxxF-4X24DB
450
250
SMBxxxM-4X09DW;
SMBxxxM-4X09UW;
SMBxxxF-4X18DW;
SMBxxxF-4X18DB
350
200
Other manuals for eArc
1
Table of contents
Other Sunman Solar Panel manuals
Popular Solar Panel manuals by other brands

Projecta
Projecta SPP40K, quick start guide

Viessmann
Viessmann VITOSOL 200 installation instructions

GYS
GYS 079410 Original instructions

Ariston
Ariston THERMO HF-2 Instruction manual for authorized service personnel

Panasonic
Panasonic HIT VBHN SJ53 Series General installation manual

Solon
Solon Blue 230/07 Assembly instructions

ACOPOWER
ACOPOWER KIT-HYS60MB user guide

Solar Frontier
Solar Frontier SolarSet 2.0 Installation and operating manual

Nibe
Nibe PV 3031 3 kW Installer manual

SUNRI SOLAR
SUNRI SOLAR SR220-250P SERIES Mounting manual

Meyer Burger
Meyer Burger WHITE Installation and operating manual

Lake Lite
Lake Lite LL-SP-10W quick start guide