
14. Install the o-ring into the check valve and insert the check valve into the
discharge head making sure check valve assembly is flush with discharge head.
Turn the discharge head over and insert the four washers and the stainless head
bolts in the 4 countersunk holes.
15. With the motor assembly still held in a vertical position install the discharge
head on the motor adapter while carefully guiding the rings on the diaphragm into
the mating holes in the check valve assembly.
16. While holding the discharge head in position tighten the four screws a little at
a time, jumping to opposite sides, to 40 inch lbs. of torque.
17. Set the pump with the discharge end facing down on a flat table.
18. Install the two o-rings onto the motor adapter and lightly lubricate with a food
grade grease or petroleum jelly.
19. Lightly grease the inside of both ends of the stainless housing about one inch
deep and slip it over the pump assembly until it rests on the o-rings. With a small
block of wood or other soft flat object push the housing down over the o-rings
until it touches the brass lip on the motor adapter.
20. Screw a 10-32 X 3" stud into one of the coupling nuts on the back side of the
motor. This is used as a guide when installing the end cap assembly.
21. Install the two o-rings on the end cap assembly and lightly lubricate the o-
rings.
22. Connect the motor leads onto the electrical studs on the inside of the end
cap. (The positive red wire lead connects to the red wire side). Before seating
end cap in housing, be sure that the terminals on the wires are tight on the end
cap electrical studs. Slide the end cap over the guide stud, making sure that the
motor lead wires are not pinched between the end cap coupling nuts. Align the
cable guard screw holes on the same side as the screw holes in the discharge
head.
23. Push the end cap down inside the housing until it butts up against the brass
cap lip and then remove the guide stud.
24. Slip a #10 stainless steel washer and the small o-ring on each of the end cap
screws. Apply a small amount of non-outgasing silicone sealant around the o-
rings of the two screws. Insert the two screws into the end cap and tighten to 35
inch lbs. of torque. (DOW CORNING 3145 RTV ADHESIVE/SEALANT IS
RECOMMENDED).
25. Install the end cap plug and tighten with a 3/16" hex wrench. An anti-seize
should be used on the threads.
26. Install the cable guard over the motor lead using the four screws.