
-6-
5. Installation Instruction
1. Unpacking
R emove nails from lower part of wooden crate.
L ift up the upper portion of wooden crate.
Chair will be left on the skid.
2. R emove the pump cover
1. R emove the screws and take out the maintenance cover,
base cover left and right from the main body.
2. R emove the oil plug with red tag from oil reservoir.
3. Plug the unit power cable into the
suitable power supply outlet.
4. Turn on the main switch located on the left side
of the base.
5. K eep depressing UP button of foot switch
until the seat is raised to the end.
6. Turn off the main switch
7. Unplug the unit power cable from the power supply outlet.
5-1. Preparations for Installations
Nails
Nails
Oil P lug with R ed T ag
Maintena nce C over
B as e C over(R )
B as e C over(R )
Oil R es ervoir
Main S witch
F oot S witch
Note : Do not remove the unit from the pallet
until the unit fixing position is ready.
Holding the Carriage Jig and place it at
planned location. Do not carry by holding
the body or basin.
5-2. Installation of the Carriage Jig
1. Fix the Jig A to the base.(M10 x 30)
2. Fix the Jig B bracket to the base.(M10 x 50)
3. A ttach the Jig B support bar to the
Jig B bracket.
4. A ttach the Jig B to the Jig B support bar
and tighten the nuts.(M16)
CAUT ION
Do not turn on power during installation.
B as e
1 J ig A
2 J ig B B racket
4 J ig B
3 J ig B S upport B ar
S crews
M10 x 30
S crews
M10 x 50