TECO ECO 3kW Grid-Tie HAWT User manual

0
Table of Contents
User
M
User Manual

1
Table of Contents
Safety of life.............................................................................................................. 2
Safety of installation................................................................................................ 3
Safety of machinery................................................................................................. 3
Chapter 1 Wind Power System ............................................................................ 5
1-1 Wind Turbine Specifications ............................................................................................ 5
1-2 Wind Turbine Description ................................................................................................ 7
1-3 Grid-tied Wind Power Inverter Specifications ................................................................. 8
1-4 Grid-tied Wind Power Inverter Description ..................................................................... 9
1-5 Wind Power System Operation ........................................................................................ 9
Chapter 2 Installation of Wind Power System........................................................... 11
2-1 Installation of Wind Turbine ............................................................................................ 11
2-2 Installation of Grid-tied Wind Power Inverter.................................................................. 15
Chapter 3 Wind Power System Operation................................................................... 25
3-1 Start Test........................................................................................................................... 25
3-2 Instruction of Grid-tied Wind Power Inverter .................................................................. 25
Chapter 4 Protection............................................................................................................ 27
4-1 Electromagnetic Brake Protection .................................................................................... 27
4-2 High Wind Protection (Furl Protection) ........................................................................... 27
Chapter 5 Troubleshooting................................................................................................ 28

2
Please read this manual carefully and follow its instructions and recommendations,
this manual will assist you to operate a renewable energy system safely and
pleasantly.
Safety of life
01. Never touch any switch with wet hands.
02. Always check and make sure there are no obstacles or people near the machine’s movable parts
before operating the machine.
03. Cover your hair and do not wear loose clothing or jewelry to avoid becoming tangled or caught in
the machine.
04. Never touch or stand near the moving parts of the machine while the machine is operating.
Serious injury may occur by being caught between the moving parts.
05. Please avoid approaching the wind turbine. The high voltage of the turbine or inverter may cause
casualty or electrical shock if touch, or you may get burnt due to electrical short circuit.
06. Always turn off the power before performing maintenance and inspection. Maintenance and
inspection inside the cover is especially dangerous.
07. Do not climb on the machine unless absolutely necessary.
08. Machine and electricity of a renewable energy system contains certain danger, it may cause death
or injury while misuse the machine.
09. Improper construction work may weaken the strength of tower or support frame structure, and
result in casualty, death or losses of property.
10. Lack of maintenance in any part of the system, improper operation of the wind energy power
system and loose of components or parts may cause casualty, death or losses of property.
11. Please avoiding approaching the blade due to high speed rotary blade due to the high possibility
causing casualty or death, please shut off the system before performing maintenance.
12. Do not lean on the machine while the machine is operating. Leaning on the covers can be very
dangerous.
13. If the turbine becomes loose or a loose sound is heard in tower, the system must be shut off
immediately. A loose turbine or part will damage the turbine body soon enough, and it is possible
to cause the tower to lean or to collapse and results in casualty or death.
14. An untrained personnel or a person without adequate safety equipment is highly restricted to
climb the tower. It is highly restricted to climb the tower before the blade of wind turbine stop as
well.
15. High voltage system (any contact point of the primary side of the system) indicates danger of
shock and fatal harm. All the construction work and maintenance of high voltage system line must
be performed and executed by professional personnel.
16. To avoid danger, construction work and wiring must be done by professional personnel.

3
Safety of installation
01. Leave space for maintenance. Install the machine so that the covers of the machine can be opened
without interference.
02. Make sure that the ground strong enough to support the machine.
03. Only an authorized electrical technician should perform work with the power cable connections.
04. Make sure that all bolts are tightened securely.
05. Make sure that all related hoses is connected secure.
06. The machine should be operated by one, well-trained person only. Injury can occur if more than
one person operates the machine. If more than one operator is absolutely necessary, all involved
operators must cooperate and be able to communicate.
07. Never start machine operation without the safety devices in place.
08. Construction work of tower or supporting frame must be done by professional installation
personnel, electrical wire must be qualified product and wiring work be done by professional and
qualified personnel. Construction work, wiring products and electrical installation personnel must
be in accordance with construction regulation standard.
09. Related permission certificates and engineering certificates are required for safe installation.
Location of tower, tower and tower foundation must be professionally designed. Soil and wind
field status must be put into consideration when selecting a location. Tower must keep far away
from buildings, neighboring properties or electrical power lines. Do not attempt to climb the tower,
only experienced personnel with adequate safety equipment is allowed to climb the tower. It is
recommended that when installing tower, keep it away from buildings and electrical power lines
for at least 100 meters (300 feet).
10. The construction and wiring process must be in accordance with electrical engineering
regulations.
11. Never remove the covers unless absolutely necessary.
12. These equipments must have proper heat elimination function; air current jam may bring fire
disaster.
Safety of machinery
01. Never remove the covers unless absolutely necessary.
02. Never put any tools or instruments on the machine operation panel or on any machine part.
03. Be careful not to operate the wrong switch. Visually check the switches on the operation panel
before operating them.
04. Never change the parameter setting without consulting your local representative. If changed
inadvertently, some parameters will cancel interlock setting.
05. Wiring work for 200 VAC or higher voltage circuits must be performed only by an authorized
electrical technician.

4
06. Do not open the door of the electrical cabinet or the operation panel unless absolutely necessary.
Opening the door allows dust, foreign matter, and moisture to enter the enclosure and can cause
machine malfunctions.
07. Carry out daily, monthly, and semi-annual inspection as specified in this operation manual.
08. Clean the machine so that any abnormalities can be found easily.
09. The output wiring of wind power system may cause a low voltage shock whenever the rotor is
turning. Caution must be implemented at all times to avoid electrical shock.
10. Please do not install wind power system near cliffs or precipices or on sharp hills such that the
wind does not travel horizontally through the rotor.
11. The weight distribution of the system is specially balanced. Any change of the system weight and
balance, especially the tail, may cause malfunction of the Furl Protection Function.
12. Additional Electromagnetic Brake Protection is provided by the electronic system controller;
please refer to the electronic system controller manual for more details.

5
Chapter 1 Wind Power System
This system is the latest small wind power system designed to provide electricity which can be used on
several different type applications, such as batteries charging, or stand alone remote electrical power
supply system. Furthermore, with the additional Grid-tied Wind Power Inverter, the wind power
system can also be connected to the power grid.
1-1 Wind Turbine Specifications
The wind turbine consists of a 2.4 meter rotor system and a generator which is 35cm in diameter. The
58 kilogram wind turbine is rated at 3000 watts @ 13.5 m/s wind speed.
The wind turbine features superior low start-up wind speed blade design which provides great
performance, very high system efficiency, and low noise. The wind turbine also provides the optional
mono-tower kit and guyed tubular tilt tower kit. For tower installation procedures, please refer to the
Chapter 2-1.
Wind Turbine Specifications
Rotor diameter 2.5 m Total weight 58 kg
Start-up wind Speed 2.5 m/s Furl Protection Start @ 13.5 m/s
Cut-in wind Speed 2.8 m/s Cut-out wind Speed 13.5 m/s
Rated wind Speed 13.5 m/s Rated output 3000W @ 13.5 m/s
Survival Wind Speed 50 m/s Rotor RPM 145 - 780rpm
Maximum Power 3kW
Generator Output
(three types) 3Phase AC 30V-240V
Generator 3-phase permanent magnet generator of an 18 poles structure
Each wind turbine has a MSN (Manufacture Serial Number) printed on the tower mount. In addition,
all three blades also have their own BSN (Blade Serial Number) printed at the blade root. The
MSN/BSN are also written on the delivery box. We recommend writing it here as well
The wind turbine system MSN:____________________
Blade BSNs :1. ___________________2.____________________3. ___________________
Date of Installation : __________________

6
Figure 1 Wind turbine assembly
Blades
Generator
Nacelle and Tail Assembly
Complete Assembly
Figure 2 Wind turbine major Components
Tail Fin
Generator Casing
Tower Mount Adapter
Spinner
Tail Boom
Nacelle
Blade
Central Body Assembly

7
1-2 Wind Turbine Description
The major components of the wind turbine are shown as Figure 2.
A. Blades / Rotor System
The rotor system consists of three glass/carbon fiber blades. The glass/carbon fiber blades are
structurally strong because there are extra glass/carbon reinforcing fibers layers that hold the full
length of the blade. The blades absorb the energy of the wind and convert them into rotational forces
that drive the generator. The rotor system includes three blades because three blades will provide
excellent balance between the cost and efficiency and can run much smoother than two blades rotor.
※Warning:
The composites blades are very strong in tension, but they are susceptible to impact damage. They
should be handled carefully to avoid any impact during installation.
B. Generator
The generator converts the rotational energy of the blade/rotor system into electricity. It is a 3-phase
permanent magnet generator of an 18 pole structure. The generator is a completely new design for the
wind power system and could produce power at low rotating speeds. The output of the generator is
three-phase variable-frequency alternating current (AC), but it can be rectified to direct current or
connected to power grid through a grid-tied device.
C. Central Body Assembly
The central body assembly consists of the blade hub, generator casing, and the nacelle. It is the main
structural “backbone” of the rotor system, the generator, the yaw bearings, slip-ring assembly, the tail,
and the tower mount. The yaw bearings allow the wind turbine to turn around the top of the tower in
order to head the wind. The slip-ring assembly is the electrical connecter to connect the movable part
of the wind turbine and the fixed tower wiring. The slip-rings and yaw bearings are located inside the
tower mount. The tower mount attaches wind power system to the top of the tower through the tower
mount adapter.
D. Tail Assembly and High-Wind Protect (Furl Protect) Function
The tail assembly, which includes the tail boom and tail fin, will keep the generator Assembly and
rotor facing to wind at wind speeds less than about 13.5 m/s. At wind speeds reaching approximately
13.5 m/s, the High-Wind Protect function actives and turns the rotor partially away from the wind to
prevent the rotor over-speed. That allows the turbine to continue to generate electrical power before it
reaching the safety shutdown control point in high winds. When the wind speed slower, the
High-Wind Protect function will inactive and turn the turbine back to the heading wind position.

8
1-3 Grid-tied Wind Power Inverter Specifications
•DSP based fully digital control
•Converter ability:3.0kW/220VAC,50/60Hz
•High efficiency: 95% above.
•Maximum Power Point Tracking function
•Anti-Islanding
•LCD displays generation data & status
•High power conversion efficiency
•Easy installation
DSP Fully Digital-Controlled Grid-tied Wind Power Inverter
Output power 3000W
Input
Nominal voltage 180VAC
Working range 30~300 VAC
MPPT range 50~250 VAC
Max. input current 18A
Output
Operational voltage 220VAC /230VAC / 240VAC
Maximum Output current 14A
Operational frequency 50/60Hz auto select
Power factor >0.99 @ Full-Load
Current distortion <4%
Maximum Efficiency >95%
Anti-Islanding VDE-0126
CE EN50178, IEC62103
Environment
Protection degree IP43
Operation temperature -20 to 40°C
Humidity 0 to 95%, non-condensing
Heat Dissipation Convection
Mechanical
L×W×H 520*360*175mm
Weight 18kg

9
1-4 Grid-tied Wind Power Inverter Description
This product is a wind energy utility grid-tied system. Single-phase grid-tied wind power inverter is
different from traditional stand- alone type wind energy inverter; it does not need additional expensive
and large space required energy storage battery, hence free from considerable battery maintenance
expense. It efficiently converts power generated from wind turbine, high efficiently converts to AC
power and feed into grid, having the direct benefit of power generation and energy saving.
1-5 Wind Power System Operation
A. Normal Operation
The generator of wind power system should begin to generate electricity when the wind speed reaches
approximately 3 m/s. The rotor rotational speed will increase with higher wind speed. The generator
output is proportional to the third power of wind speed. Please refer to Figure 3 for the relationship
between power output and wind speed.
Figure 3 Power Curve: Wind Speed vs. Power
※Note
The operational wind speeds and performance in the manual assume the condition of sea-level altitude,
steady winds, and moderate temperatures. High altitude, hot temperatures, turbulence and gusting
winds will usually bring the system performance lower than expectation.

10
B. High-Wind Protection (Furl Protection)
In case of high wind speeds, the High-Wind Protection Function system will protect the wind turbine
automatically. When furled, the rotor will turn away from the wind direction, the rotor speed will
reduce, and the power output of the turbine will be significantly reduced.
High-Wind Protection Function is an easy method to provide high wind speed protection. The
High-Wind Protection Function is based on basic physical relationship between the aerodynamics,
rotor, gravity, and the specially designed tail shape and weight balance of the wind power system.
The High-Wind Protection Function is completely passive, so it is very reliable. But there is one
situation in the field that we have found can disrupt the operation of High-Wind Protection Function.
If the wind turbine is installed on a sharp hill or next to a cliff so that the wind can come up through
the rotor on an incline (e.g., from below; as opposed to horizontally) this will affect furling and can
produce higher peak outputs. We strongly recommend avoiding this situation.
※Caution
The weight distribution of the system is specially balanced. Any change of the system weight and
balance, especially the tail, may cause malfunction of the High-Wind Protection Function.
※Note
Additional Electromagnetic Brake Protection Function is provided by the electronic system controller,
please refer to Chapter 4 Protection.

11
Chapter 2 Installation of Wind Power System
※Caution
¾To avoid danger, construction work and wiring must be done by professional personnel.
¾The construction and wiring process must be in accordance with electrical engineering regulations.
¾Please read this manual carefully and follow its instructions and recommendations.
2-1 Installation of Wind Turbine
※Parts andAccessories List:
There are three shipping boxes for a complete set of wind turbine. Details are as follows,
Box1 Central body and Accessories 68 cm x 48.5 cm x 35 cm (L x W x H) weight 40kg
Box2 Blades 121 cm x 30 cm x 37 cm (L x W x H) weight 13.7 kg
Box3 Tail assembly 152 cm x 48 cm x 4.5 cm (L x W x H) weight 6.2kg
Before Installation, please check the packing for the following items:
NO Description Specification Unit Qty.
1 Blade 1.2 m
material:Glass + Carbon fiber
pcs 3
2 Body Permanent magnet synchronous
generator
pcs 1
3 Spinner material:Nylon + Glass fiber pcs 1
4 Tail Fin Plug pcs 1
5 Tail Fin material:Zinc-coated steel pcs 1
6 Stainless Steel Screw 12 m/m * 63 m/m pcs 6
7 Stainless Steel Nut 12 m/m pcs 10
8 Stainless Steel Flat Washer 12m/m pcs 10
9 Stainless Steel Spring Washer 12m/m pcs 12
10 Stainless Steel Screw 8m/m * 75m/m pcs 2
11 Stainless Steel Nut 8m/m pcs 2
12 Stainless Steel Washer 8m/m pcs 4
13 Stainless Steel Screw 12m/m * 130m/m pcs 2
14 Stainless Steel Plate pcs 1

12
Wind※Turbine Assemble Procedure:
(1) Fasten the three blades into the circular hub using two 12mm-diameter, 63mm-long bolts(6) for
each blade. To refer Figure 4, firstly put one spring washer(9) through the bolt, follow by one flat
washer(8), insert them through the blade, stainless steel plate(14) and hub, put another spring
washer(9) through the protruding part of the bolt, apply Loctite to the thread, and fasten with a
nut(7). Press the spinner into the hub.
Figure 4 Assembly of blades and spinner
(2) Attach the tail assembly to the central body assembly using two 8mm-diameter bolts(10). To refer
Figure 5, firstly put one flat washer(8) through the bolt(10), insert them through the tail and
nacelle, put another flat washer(8) to the bolt, apply Loctite to the thread, and fasten with a
nut(11).
(3) Attach the wind turbine power output wires to the power cable with insulated heat shrunk tube
and straighten the cable. Put the supporting pole into the tower mount adapter using two
12mm-diameter, 130mm-long bolts(13). To refer Figure 6, firstly put one flat washer(8) through
the bolt(13), insert them through the adapter and pole, put another flat washer(8) to the bolt(13),
apply Loctite to the thread, and fasten with two nuts(7).(Notice! Don’t PRESS or DISTORY
wires when assemble supporting pole)
6
3
8 9 7
914

13
Figure 5 Assembly of tail and tail plug
Figure 6 Assembly of wind turbine and supporting pole
(4) Hoist the wind turbine and supporting pole into position, fasten the pre-installed foundation bolts
with nuts and apply Loctite to the thread to complete the installation.
810
811
8
7
8
13

14
※Support Tower Suggestion:
3
~4
.8
m
3” Steel
Pipe
1.2
m
4.8 m
Steel Cable: Min. Dia.: 6mm
3 inch Steel Tube:
ÆOuter Dia.: 89.5mm
ÆWall Thickness: 4.5mm
3.5 inch Steel Tube:
ÆOuter Dia.:102.1mm
ÆWall Thickness: 4.5mm
Cylindrical Foundation: 90 cm in diameter,
100 cm in depth, steel reinforced concrete
0.8 m
1.0 m Concrete Block
Dimension:
0.8x0.8x0.3m
45o~60o
0.3
m
6-meter guyed tower
34m
m
12.8m
m
Wind turbine
Steel
p
i
p
e
73mm
9-meter guyed tower
6 m
1.2
m
1.8 m
4.5~7.8m
3.5” Steel Pipe
3” Steel Pipe
12 mm Bolt
Anti-vibration
rubber insert
10cm
Hot Dip Galvanizing steel
Diameter: 12mm
120cm
25cm
>30mm

15
2-2 Installation of Grid-tied Wind Power Inverter
※Installation Procedure of Inverter:
Conditions
Do not operate the Inverter in an environment where the ambient temperature is outside the limits given in
the specifications of this manual. These inverter units are in-tended for use in a temperature-controlled,
indoor area free of conductive contaminants. Select a location that will provide good air circulation for
inverter at all times.
◇ Placement
Mounting the Grid-tied Inverter on the wall
(1) The mounting background must be firm.
(2) The ambient temperature must be between -20°C and +40°C.
(3) Install at a shading roof, do not expose the inverter to direct sunlight.
(4) Keep it in good ventilated situation; a minimum distance of 10 inch (254 mm) must be clear
around the inverter.
(5) The heat sink can reach a temperature of more than +80°C. The air circulation must be sufficient
for heat dissipation.
(6) Provide a correct position of the inverter for mounting.
(7) The inverter is mounted on the back side with the metal strap.(as Figure 7)
(8) Check mounting is firm.
(9) Please ensure to install the grid-tied wind power inverter in a ventilated location. There should be no any
stack around one meter of its surrounding.

16
STEP 1:Heat dissipation
Keep a minimum distance of 8-12 inch clear
around the inverter
STEP 2:Fix the metal strap
Fixed six screws
STEP 3:Hang up
Wall
STEP 4:Check it firm
Wall

17
[mm]
Figure 7 Metal strap of Inverter
※AWG to Metric Wire Size Conversion Chart
AWG gauge Diameter (mm) AWG gauge Diameter (mm)
0000
(
4/0
)
11.68 mm 4 5.19 mm
000
(
3/0
)
10.40 mm 6 4.11 mm
00
(
2/0
)
9.27 mm 8 3.26 mm
(
1/0
)
8.25 mm 10 2.59 mm
1 7.34 mm 12 2.05 mm
2 6.54 mm 14 1.63 mm
3 5.83 mm 16 1.29 mm
Fixed position
Fixed position
Fixed position

18
※Wind Power System Wiring Description
Power Wire Size Selection
Please connect electrical wire according to each contact marked with description. Regulated wire size
as follows:(Detailed wiring diagram as Figure 8,Figure 9)
AC output wire use a size at least 12AWG(or 3.5 mm2) black copper wire.
Wind turbine wires use at least 12AWG(or 3.5 mm2) and above copper wire, these wires to be of
different color in order to distinguish R, S, T 3-phase power.
It is recommended to use 12 AWG(or 3.5 mm2) and above yellow/green copper wire on machine
housing earthing(grounding) wire.
Notice of Wiring
¾Before wiring, please finish installation of the wind power inverter, meanwhile, check and ensure
that there is no fuse breaker of main distribution board is in close status.
¾In order to ensure quality of electrical wiring. Please use a wire size recommended in this manual
and in accordance with wiring standard of electrical regulations.
¾The GREEN wire of wind turbine is neutral wiring output from generator, it’s for special
application. Please leave GREEN wire isolated, don’t wire it to any conductive goods.

19
Figure 8 wiring diagram of brake control cabinet
Table of contents