
Requirements
Electrical Requirements –240v A.C. / 60 Cycle
Power Consumption –1.5 Amps
Installation
1. Set machine on a stable working bench or table.
2. Use the two mounting holes located on the base of the machine to bolt machine down.
(Optional)
3. Plug in electrical cord to properly fused and grounded receptacle.
Operation
1. Flip power switch located on lower right side of machine to “ON”. Green light on
control panel indicates power is “ON”.
2. Set top and bottom platen temperature controls located on the center and right side of
control panel to desired setting. Allow 10 minutes for platens to heat up. While platens
are heating their corresponding red light on the control panel will remain on. When
platens reach desired temperature the red light will turn off momentarily. As the
temperature controllers phase on and off to maintain desired platen temperature, the
red lights will phase on and off also. Platen heat can be turned off individually by
turning knob counterclockwise until it clicks.
3. Set Timer Control located on the left of control panel to desired cycle dwell time. This
time setting will repeat each press cycle until changed.
4. To actuate press, pull handle down until platen locks in the down position. When press
cycle is complete, the top head will automatically pop up to the up position.
5. To immediately stop a cycle, lift the handle back to the open position during the cycle
time.
Maintenance
Check teflon and sponge to ensure good working order.
Check spring tension and adjust as needed.