
IMPORTANT NOTICE
Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and
other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per
JESD48, latest issue. Buyers should obtain the latest relevant information before placing orders and should verify that such
information is current and complete. All semiconductor products (also referred to herein as “components”) are sold subject to TI’s
terms and conditions of sale supplied at the time of order acknowledgment.
TI warrantsperformanceof its components tothe specifications applicable at the timeof sale, in accordance with thewarrantyin TI’s
terms and conditions of sale of semiconductorproducts.Testingand otherqualitycontroltechniquesare used totheextentTIdeems
necessary to support this warranty. Except where mandated by applicable law, testing of all parameters of each component is not
necessarily performed.
TI assumes no liability for applications assistance or the design of Buyers’ products. Buyers are responsible for their
products and applications using TI components. To minimize the risks associated with Buyers’ products and applications,
Buyers should provide adequate design and operating safeguards.
TI does not warrant or represent that any license, either express or implied, is granted under any patent right, copyright, mask work
right, or otherintellectual propertyright relatingto any combination,machine,or process in whichTI componentsorservicesareused.
Informationpublished by TI regarding third-partyproductsor services does not constitutealicenseto usesuchproductsorservicesor
a warranty or endorsement thereof. Use of such information may require a license from a third party under the patents or other
intellectual property of the third party, or a license from TI under the patents or other intellectual property of TI.
Reproduction of significant portions of TI information in TI data books or data sheets is permissible only if reproduction is without
alteration and is accompanied by all associatedwarranties,conditions,limitations,andnotices.TI is notresponsibleorliableforsuch
altered documentation. Information of third parties may be subject to additional restrictions.
Resale of TI components or services with statements different from or beyond the parameters stated by TI for that component or
service voids all express and any implied warranties for the associated TI component or service and is an unfair and deceptive
business practice. TI is not responsible or liable for any such statements.
Buyeracknowledges and agrees that it is solely responsible for compliance with all legal, regulatoryand safety-relatedrequirements
concerning its products, and any use of TI components in its applications, notwithstanding any applications-related information or
support that
may be provided by TI. Buyer represents and agrees that it has all the necessary expertise to create and implement
safeguards which anticipate dangerous consequences of failures, monitor failures and their consequences, lessen the likelihood of
failuresthatmightcauseharm andtake appropriateremedial actions.Buyerwill fullyindemnify TI and itsrepresentativesagainstany
damages arising out of the use of any TI components in safety-critical applications.
Insome cases,TI componentsmay be promotedspecificallytofacilitatesafety-relatedapplications.Withsuchcomponents,TI’s goal
is to help enable customers to design and create their own end-product solutions that meet applicable functional safety standards
and requirements. Nonetheless, such components are subject to these terms.
No TI componentsare authorizedfor use in FDA Class III (or similar life-critical medical equipment)unless authorized officers of the
parties have executed a special agreement specifically governing such use.
Only thoseTI components which TI has specificallydesignatedas militarygrade or “enhanced plastic” are designed and intendedfor
use in military/aerospace applications or environments. Buyer acknowledges and agrees that any military or aerospace use of TI
components
which have not been so designatedis solely at the Buyer's risk, and that Buyeris solely responsible for compliance with
all legal and regulatory requirements in connection with such use.
TI has specificallydesignatedcertaincomponentsas meeting ISO/TS16949requirements,mainly for automotiveuse. In any caseof
use of non-designated products, TI will not be responsible for any failure to meet ISO/TS16949.
Products Applications
Audio www.ti.com/audio Automotive and Transportation www.ti.com/automotiveAmplifiers
amplifier.ti.com Communications and Telecom www.ti.com/communicationsData
Converters dataconverter.ti.com Computers and Peripherals www.ti.com/computers
DLP® Products www.dlp.com Consumer Electronics www.ti.com/consumer-apps
DSP dsp.ti.com Energy and Lighting www.ti.com/energyClocks
and Timers www.ti.com/clocks Industrial www.ti.com/industrial
Interface interface.ti.com Medical www.ti.com/medicalLogic
logic.ti.com Security www.ti.com/security
Power Mgmt power.ti.com Space, Avionics and Defense www.ti.com/space-avionics-defense
Microcontrollers microcontroller.ti.com Video and Imaging www.ti.com/video
RFID www.ti-rfid.com
OMAP Applications Processors www.ti.com/omap TI E2E Community e2e.ti.com
Wireless Connectivity www.ti.com/wirelessconnectivity
Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265
Copyright © 2014, Texas Instruments
Incorporated