
www.ti.com
EVM Configuration and Description
External Microcontroller Control
The user can provide external microcontroller I2C and GPIO connections to the EVM by routing them to
test points TP1 to TP4.
Before connecting the microcontroller, check the following:
• Make sure the I/O voltage of the external microcontroller is the same as the I/O voltage of the
TCA8418. The power supply voltage of the TCA8418_VCC can be adjusted through JMP5 or
externally supplied through TP5 with U5 disabled by JMP4 (see Section 2.5).
• Make sure the external microcontroller is isolated from the TUSB3210 by disabling the TXS0104E level
translator. Shorting jumper JMP2 can disable the level translator (see Section 2.5).
External I2C Slave Devices
The user can connect external I2C slave devices to test points TP3 and TP4. The devices can be
controlled through the TCA8418 graphical user interface (GUI) software. Under the GUI software control,
the I2C bus operates at 400 kHz. Therefore, the external slave devices must support 400-kHz I2C bus.
2.5 Jumper Configuration (JMP1 through JMP6)
To use the full TCA8418 (GUI) software functionality, all jumpers except JMP5 must be at their default
settings. Table 2 describes all of the jumpers in the EVM and their respective functionality (all default
settings are in bold).
Table 2. Jumper Descriptions
Jumper Functionality Configuration
TCA8418 Keypad Scanner IC Open JMP1 to allow GUI control
JMP1 Disable Shunt JMP1 to disable TCA8418 manually
TXS0104E Level Translator Open JMP2 to enable level translation
JMP2 Disable Shunt JMP2 to disable level translation
LP2985-33 5V to 3.3V LDO Shunt JMP3 in 1-2 position to enable the 3.3V LDO
JMP3 Disable Shunt JMP3 in 2-3 position to disable the 3.3V LDO
TPS73101 5V to Variable Shunt JMP4 in 1-2 position to enable the Variable Output LDO
JMP4 Output LDO Disable Shunt JMP4 in 2-3 position to disable the Variable Output LDO
TPS73101 5V to Variable Shunt 1-2 for TCA8418_VCC = 1.8V
JMP5 Output LDO Adjust Shunt 2-3 for TCA8418_Vcc = 3.3VOpen all for TCA8418_Vcc = 2.4V
TCA8418 ROW6 Function Shunt 1-2 for GPI functionality
JMP6(1) Selection Shunt 2-3 for Keypad functionality
TCA8418 ROW7 Function Shunt 1-2 for GPI functionality
JMP7(1) Selection Shunt 2-3 for Keypad functionality
TCA8418 COL8 Function Shunt 1-2 for GPO functionality
JMP8(1) Selection Shunt 2-3 for Keypad functionality
TCA8418 COL9 Function Shunt 1-2 for GPO functionality
JMP9(1) Selection Shunt 2-3 for Keypad functionality
Open JMP6 to open EEPROM SCL line for firmware programming
JMP10 EEPROM SCL Line Short Shunt JMP4 to short EEPROM SCL line
(1) JMP6, JMP7, JMP8, and JMP9 must all have the same configuration for correct GUI operation.
9
SCPU033–May 2010 TCA8418 I2C Controlled Keypad Scan IC Evaluation Module
Copyright © 2010, Texas Instruments Incorporated