EnglishDeutsch
 logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Texas Instruments
  6. •
  7. Motherboard
  8. •
  9. Texas Instruments TMS320C6472 User manual

Texas Instruments TMS320C6472 User manual

Other manuals for TMS320C6472

2

This manual suits for next models

1

Other Texas Instruments Motherboard manuals

Texas Instruments THS4500EVM User manual

Texas Instruments

Texas Instruments THS4500EVM User manual

Texas Instruments bq2589EVM User manual

Texas Instruments

Texas Instruments bq2589EVM User manual

Texas Instruments ADS8920BEVM-PDK User manual

Texas Instruments

Texas Instruments ADS8920BEVM-PDK User manual

Texas Instruments INAEVM-ALT-SO8 User manual

Texas Instruments

Texas Instruments INAEVM-ALT-SO8 User manual

Texas Instruments AFE7070 User manual

Texas Instruments

Texas Instruments AFE7070 User manual

Texas Instruments TLC5924EVM User manual

Texas Instruments

Texas Instruments TLC5924EVM User manual

Texas Instruments TPS7A54EVM-031 User manual

Texas Instruments

Texas Instruments TPS7A54EVM-031 User manual

Texas Instruments TLIN1431EVM User manual

Texas Instruments

Texas Instruments TLIN1431EVM User manual

Texas Instruments TUSB1044 User manual

Texas Instruments

Texas Instruments TUSB1044 User manual

Texas Instruments BQ25180 User manual

Texas Instruments

Texas Instruments BQ25180 User manual

Texas Instruments DAC8775EVM User manual

Texas Instruments

Texas Instruments DAC8775EVM User manual

Texas Instruments DRV201 User manual

Texas Instruments

Texas Instruments DRV201 User manual

Texas Instruments LM74670-SQEVM User manual

Texas Instruments

Texas Instruments LM74670-SQEVM User manual

Texas Instruments TSW14J50 User manual

Texas Instruments

Texas Instruments TSW14J50 User manual

Texas Instruments ADS1610EVM User manual

Texas Instruments

Texas Instruments ADS1610EVM User manual

Texas Instruments ADS1x20EVM User manual

Texas Instruments

Texas Instruments ADS1x20EVM User manual

Texas Instruments TPS8802EVM User manual

Texas Instruments

Texas Instruments TPS8802EVM User manual

Texas Instruments DRV8873 EVM Series User manual

Texas Instruments

Texas Instruments DRV8873 EVM Series User manual

Texas Instruments LM5157EVM-SEPIC User manual

Texas Instruments

Texas Instruments LM5157EVM-SEPIC User manual

Texas Instruments ADC 120EVM-PDK Series User manual

Texas Instruments

Texas Instruments ADC 120EVM-PDK Series User manual

Texas Instruments TPS61050EVM-215 User manual

Texas Instruments

Texas Instruments TPS61050EVM-215 User manual

Texas Instruments ADS1158EVM User manual

Texas Instruments

Texas Instruments ADS1158EVM User manual

Texas Instruments TPS54386EVM User manual

Texas Instruments

Texas Instruments TPS54386EVM User manual

Texas Instruments TPS92520-Q1 User manual

Texas Instruments

Texas Instruments TPS92520-Q1 User manual

Popular Motherboard manuals by other brands

DFI SD170 user manual

DFI

DFI SD170 user manual

ASROCK ROMED8-2T user manual

ASROCK

ASROCK ROMED8-2T user manual

Asus P2L97A user manual

Asus

Asus P2L97A user manual

Winmate IC70 user manual

Winmate

Winmate IC70 user manual

Asus MES-B user manual

Asus

Asus MES-B user manual

Grantech SYS8F377VGGA-3OMN user manual

Grantech

Grantech SYS8F377VGGA-3OMN user manual

Telit Wireless Solutions SL869-3DR user guide

Telit Wireless Solutions

Telit Wireless Solutions SL869-3DR user guide

Commell MS-C73 user manual

Commell

Commell MS-C73 user manual

Gigabyte GA-9IVDT user manual

Gigabyte

Gigabyte GA-9IVDT user manual

IBT Technologies MB860 user manual

IBT Technologies

IBT Technologies MB860 user manual

Nvidia TEGRA DG-04927-001_V01 user guide

Nvidia

Nvidia TEGRA DG-04927-001_V01 user guide

Intel D33217CK specification

Intel

Intel D33217CK specification

Asus F1A55-M LX PLUS R2.0 user manual

Asus

Asus F1A55-M LX PLUS R2.0 user manual

EPC EPC9147C quick start guide

EPC

EPC EPC9147C quick start guide

Asus EX-B760M-V5 D4 quick start guide

Asus

Asus EX-B760M-V5 D4 quick start guide

EPOX MU-8KHA0010 user manual

EPOX

EPOX MU-8KHA0010 user manual

Ski-Doo Bombardier MPEM 219 700 090 user guide

Ski-Doo

Ski-Doo Bombardier MPEM 219 700 090 user guide

Epson S5U13700P00C000 user manual

Epson

Epson S5U13700P00C000 user manual

https://manuals.online logo
https://manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2026 Manuals.Online. All Rights Reserved.

TMS320C6472 Evaluation Module
Quick Setup Guide
TMDXEVM6472
Getting Started:
The EVMC6472 ships with a Power On self Test (POST) flashed
in to I2C EEPROM. The POST will be automatically executed
when the board is powered ON. POST will perform memory
test and internal EMAC loopback test. At 'power on' the user
LEDs will be OFF by default. The LEDs will blink and turn OFF to
indicate successful DSP booting.
Then after, User LED-1 will turn ON to indicate successful RAM
test and User LED-2 will turn ON to indicate successful internal
EMAC loop-back test. These LEDs will remain ON to indicate
success of both the tests.
Please refer EVM User Guide for software installation and
other details.
Helpful Hints:
• Plug in all the cables before turning the EVM ON to
ensure proper grounding.
• Do not unnecessarily flex the boards, while inserting
cables. Excessive flexing can break the PCB traces.
Online Documentation
Most of the information on EVM6472 is available online. Some
of the most commonly used resources are mentioned below:
EVM6472 Information:
http://www.einfochips.com/TI-TMS320C6472-EVM.php
This link contains:
• Hardware & software details
• User Guide
• Technical Reference Manual
• TMS320C6472 Datasheet
• Frequently Asked Questions (FAQ)
C6472 DSP Information:
http://focus.ti.com/docs/prod/folders/print/tms320c6472.html
EVM6472 Support:
Please write to for
technical queries related to this EVM.
eInfochips Address:
eInfochips Limited
303 Parishram Building, 5/B Rashmi Society,
Mithakhali Six Road, Navarangpura,
Ahmedabad - 380009
Gujarat, INDIA.
Tel: +91-79-2656 3705
Fax: +91-79-2656 0722
[email protected]
TI Worldwide Technical Support
Internet
TI Semiconductor Product Information Center Home Page
support.ti.com
TI Semiconductor KnowledgeBase Home page
support.ti.com/sc/knowledgebase
Product Information Centers
Americas
Phone +1(972) 644-5580 Fax +1(972)927-6377
Internet/Email support.ti.com/sc/pic/americas.htm
Europe, Middle East and Africa
Phone
European Free Call 00800-ASK-TEXAS
(00800 275 83927)
International +49 (0) 8161 80 2121
Russian Support +7 495 981 0701
Note: The European Free Call (Toll Free) number is not active in all
countries. If you have technical difficulty calling the free call
number, please use the international number above.
Fax +(49) (0) 8161 80 2045
Internet support.ti.com/sc/pic/euro.htm
Japan
Fax
International +81-3-3344-5317 Domestic 0120-81-0036
Internet/Email
International support.ti.com/sc/pic/japan.htm
Domestic www.tij.co.jp/pic
Asia
Phone
International
Domestic Toll-Free-Number Toll-Free-Number
Australia Malaysia
China New Zealand
Hong Kong Philippines
India Singapore
Indonesia Taiwan
Korea Thailand
Fax Email [email protected]
[email protected]
Internet support.ti.com/sc/pic/asia.htm
Important Notice: The products and services of Texas Instruments
Incorporated and its subsidiaries described herein are sold subject to TI's
standard terms and conditions of sale. Customers are advised to obtain the
most current and complete information about TI products and services
before placing orders. TI assumes no liability for applications assistance,
customer's applications or product designs, software performance, or
infringement of patents. The publication of information regarding any other
company's products or services does not constitute TI's approval, warranty or
endorsement thereof.
The floating bar is a trademark of Texas Instruments.
All other trademarks are the property of their respective owners
©2010 Texas Instruments Incorporated eInfochips Literature: EVM6472_QSG_1.0
+91-80-413816651-
800-999-084
800-820-8682
800-96-5941
1-800-425-7888
001-803-8861-1006
080-551-2804
+886-2-2378-6808
1-800-80-3973
0800-446-934
1-800-765-7404
800-886-1028
0800-006800
001-800-886-0010
Dual Giga Ethernet
Boot Mode/Configuration
Settings
RS232-
Serial
USB mini-B
C6472
(6 Core DSP)
HPI - DC
LEDs-I2C
AMC-
Type B+
Cold
Reset
On-Board
Embedded
Emulation Warm
Reset
JTAG-
FPGA
NAND Flash
128 MB
User
Switches
User
LEDs
FPGA
JTAG-DSP DDR2 RAM
256 MB 12V DC
w w w . e i n f o c h i p s . c o m
(Actual Board may look slightly different due to version upgrade)
The TMDXEVM6472 (Evaluation Module) kit includes:
TMS320C6472 Evaluation Module (Printed circuit board
assembly)
Power supply and power cord
USB Cable for on-board JTAG emulation
Ethernet cable
Software (DVD) and documentation
1
2
3
4
©2010 Texas Instruments Incorporated eInfochips Literature: EVM6472_QSG_1.0 ©2010 Texas Instruments Incorporated eInfochips Literature: EVM6472_QSG_1.0
C6472 Evaluation Module
3Connect Ethernet switch /
router / PC to the lower
Gigabit Ethernet port (J3) of
EVM6472 board using an
Ethernet cable to access
EMAC0.
Connect the Mini-USB
cable to J7 plug for on
board embedded
emulation, as shown in
figure. (For use with CCS
debugger only)
2
1a The EVMC6472 is also shipped
with an Out-Of-Box Demo application
flashed into NAND. This is a network
based application which starts an HTTP
server and a TELNET server with the
static IP address 192.168.2.100. Be sure
the first switch in the dual-switch SW3 is
off.
In order to connect to the board, the
test PC should be configured with
a compatible static IP address such
as 192.168.2.101.
Once the User LEDs blink and turn OFF
(indicating successful NAND boot) the
user can access the following URL
through a browser to view the Out-Of-
Box demo: http://192.168.2.100
Ensure EVM configuration
switches are set as shown to run
Power On Self Test (POST).
11aTo run
demo through
NAND, configure
the switches as
shown above.
Out-Of-Box Connect the 12V DC
power adapter
(supplied with the kit) to
power jack (J6).
4