
www.ti.com
Schematics, Bill of Materials, and Layout
9
SLIU021–September 2016
Submit Documentation Feedback Copyright © 2016, Texas Instruments Incorporated
TPS65916 EVM User’s Guide
Table 2. TPS65916EVM BOM (continued)
Designator Quantity Value Description Package Reference Part Number Manufacturer
C30, C36 2 100pF CAP, CERM, 100 pF, 50 V, +/- 5%, C0G/NP0,
0402 0402 GRM1555C1H101JA01D MuRata
C33, C34 2 22pF CAP, CERM, 22 pF, 50 V, +/- 5%, C0G/NP0,
0402 0402 C1005C0G1H220J050BA TDK
C35 1 1000pF CAP, CERM, 1000 pF, 50 V, +/- 10%, X7R,
0402 0402 GRM155R71H102KA01D MuRata
C37, C38, C39, C40, C41, C43 6 0.1uF CAP, CERM, 0.1 µF, 6.3 V, +/- 10%, X5R, 0402 0402 GRM155R60J104KA01D MuRata
C42 1 0.47uF CAP, CERM, 0.47 µF, 6.3 V, +/- 10%, X5R,
0402 0402 04026D474KAT2A AVX
D1, D2, D3, D5, D6, D7 6 Yellow LED, Yellow, SMD Yellow LED SML-P12YTT86 Rohm
D4 1 Orange LED, Orange, SMD Orange LED SML-P12DTT86 Rohm
H9, H10, H11, H12 4 Bumpon, Hemisphere, 0.44 X 0.20, Clear Transparent Bumpon SJ-5303 (CLEAR) 3M
J1 1 Connector, Receptacle, Micro-USB Type B, R/A,
Bottom Mount SMT Micro USB-B receptacle ZX62-B-5PA(11) Hirose Electric Co. Ltd.
J2, J3, J7, J8, J9, J10, J12,
J13, J14, J15, J16, J18, J19,
J20, J21, J22, J23, J32, J34,
J35, J36, JP1
22 Header, 100mil, 2x1, Tin, TH Header, 2 PIN, 100mil, Tin PEC02SAAN Sullins Connector Solutions
J4, J5, J6, J11, J17, J24, J25,
J26, J27, J28, J29, J30, J31,
J43, J44, J45, J46, J47, J48,
J49, J50, J51, J52, J53, J54,
JP2, JP3, JP4, JP5, JP6, JP7
31 Header, 100mil, 3x1, Tin, TH Header, 3 PIN, 100mil, Tin PEC03SAAN Sullins Connector Solutions
J33 1 Connector, TH, BNC Amphenol_112404 112404 Amphenol Connex
L1, L3, L4, L5, L6 5 1uH Inductor, Shielded Drum Core, Powdered Iron, 1
µH, 4.2 A, 0.043 ohm, SMD 4.7x1.2x4.3mm IHLP1616ABER1R0M11 Vishay-Dale
LBL1 1 Thermal Transfer Printable Labels, 0.650" W x
0.200" H - 10,000 per roll PCB Label 0.650"H x 0.200"W THT-14-423-10 Brady
P1, P4, P6, P8, P10, P13,
P19, P20 8 Header, 100mil, 2x1, Tin plated, TH Header, 2 PIN, 100mil, Tin PEC02SAAN Sullins Connector Solutions
P2 1 Header (Shrouded), 2.54mm, 10x2, Gold, Black,
TH Header (Shrouded), 2.54mm,
10x2, TH SBH11-PBPC-D10-ST-BK Sullins Connector Solutions
P3 1 Header, 2.54 mm, 22x2, Tin, TH Header, 2.54 mm, 22x2, TH MTLW-122-05-T-D-170 Samtec
P5, P16 2 Header(shrouded), 5.08mm, 4x1, Tin, TH Header(shrouded), 5.08mm,
4x1, TH 1740288 Phoenix Contact
P7, P9, P11, P14, P17 5 Header(shrouded), 3.81mm, 4x1, Tin, TH Header(shrouded), 3.81mm,
4x1, TH 1803442 Phoenix Contact
P12, P15 2 Header, 100mil, 6x2, Tin, TH Header, 6x2, 100mil, Tin PEC06DAAN Sullins Connector Solutions
P18 1 Header (shrouded), 100 mil, 7x2, Gold plated,
TH 7x2 Shrouded Header SBH11-PBPC-D07-ST-BK Sullins Connector Solutions
P21 1 Header (shrouded), 100mil, 5x2, High-
Temperature, Gold, TH 5x2 Shrouded header N2510-6002-RB 3M
Q1, Q2, Q3, Q4, Q5, Q6, Q7,
Q8, Q9 9 50V MOSFET, N-CH, 50 V, 0.21 A, SOT-323 SOT-323 BSS138W Fairchild Semiconductor