TMG TMG-GH2030 User manual

►
www.tmgindustrial.com 0/22 Toll Free:1-877-761-2819

►
www.tmgindustrial.com 1/22 Toll Free:1-877-761-2819
MAIN SPECIFICATIONS :
-Assembly size : W6 x L9 x H3 (m) / W19.7 x L29.5 x H9.8(ft)
-Shoulder wall clearance height : 1.25 m / 4.1ft
-Front roll up door : W1.1 x H2 (m) / W3.6 x H6.6 (ft)
PRIOR TO ASSEMBLY
Please read the instructions carefully before installation. It is important to follow your local safety regulations and industry
standards during installation. Regulations may include but are not limited to :
- Safety helmets, protective eyewear, and clothing
- Safety harnesses for all elevated workers
- Proper ladder, cage, and safety operation
Check all components and parts before installation. All parts are marked with a part number, please refer to the parts list
to make sure you have all parts.
Choose a day with low or no wind to install, assembly is hard in heavy wind. Do not make any alterations to the structure.
Do not hang any weights on the frame during installation, including parts. We are not responsible for any damages or
injuries caused by inappropriate installation, unauthorized modifications or extreme weather.
This building is not intended for human occupancy.
It is recommended to tape or add foam/rubber on the frame where joints connect and where it touches the cover. This will
help extend the life span of the cover.
Read the following item list carefully and count the number of items to ensure that all parts are included prior to setup.
INSTALLATION STEPS
STEP 1 : REVIEW THE WHOLE STRUCTURE AND CHOOSE THE PROPER INSTALLATION SITE.
Choose a solid flat level ground area to set up the building. Do not install the building on soft ground, wetland, uneven
surfaces, sloped surfaces, or on top of structures that are not rated to hold its weight.
We strongly recommend that you build the structure on a solid foundation such as cement and use anchor bolts on all
baseplates.
Be aware of the surrounding area. Do not set up the building near snowdrifts, open flames or exposed electrical
wires. Do not keep heat sources near the fabric cover. Keep the building surroundings clear at all times.

►
www.tmgindustrial.com 2/22 Toll Free:1-877-761-2819
TMG-GH2030 PART LIST
PARTS
CODE
GRAPHICAL
DESCRIPTION
LENGTH
QTY
1
Peak arch tube
φ48x1154mm
7
2
Upper rafter tube
(middle and rear truss)
φ48x1980mm
12
2A
Upper rafter tube
(front truss)
φ48x1980mm
2
3
Shoulder tube
(middle truss)
φ48x1335mm
14
4
Lower rafter tube
(front and rear truss)
φ48x1139mm
14
5
Roof purlin
(horizontal tube)
φ25x1448mm
30
5A
Middle truss connectors
W35xL140mm
φ25 /φ48
50
5B
Front and rear connectors
W35xL96mm
φ25 /φ48
10
5C
Self-tapping screws
#12x25mm
35
5L
Left corner baseplate
(front and rear truss)
W150xL250mm
2
5R
Right corner baseplate
(front and rear truss)
W150xL250mm
2
6
Baseplate
(front truss)
150x150mm
2
6A
Baseplate
(rear truss)
150x150mm
2
7
Baseplate
(middle truss)
150x150mm
10

►
www.tmgindustrial.com 3/22 Toll Free:1-877-761-2819
7A
Ratchet
2T
14
7B
Tensioning tube
φ32x1993mm
8
7D
Tensioning tube
φ32x1360mm
2
8
Door frame lower tube
(front truss)
φ32x1922mm
1
8A
Door frame lower tube
φ32x1157mm
2
8B
Door frame lower tube
(front truss)
φ32x1922mm
1
8C
Door frame lower tube
(front truss)
φ32x1265mm
2
9
Door frame upper tube
(front truss)
φ32x886mm
2
9A
Door frame upper tube
(rear truss)
φ32x1429mm
2
9B
Door frame upper tube
(front truss)
φ32x1135mm
2
10
Door frame upper horizontal
tube (front truss)
φ25x1240mm
4
10A
Door frame horizontal tube
(rear truss)
φ25x2030mm
3
11
Ceiling cross bar
(middle and rear truss)
φ25x1460mm
6
11A
Door frame cross pull tube
(front truss)
φ25x1143mm
1
12
Bottom tension bar
(front cover)
φ25x1188mm
2
12A
Bottom tension bar
(front cover)
φ25x1220mm
2

►
www.tmgindustrial.com 4/22 Toll Free:1-877-761-2819
12B
Bottom tension bar
(rear cover)
φ25x1925mm
3
13
Diagonal bracing bar
(1st and last span)
φ25x1910mm
4
13A
Tube clamp
φ48mm
12
13B
Tube clamp
φ32mm
2
14
Door frame column tube
30x30x1925mm
1
14A
Door frame column tube
30x30x1925mm
1
15
Door horizontal tube
30x30x996mm
4
16
Expansion bolt
(head diameter 14)
M12/φ14x100mm
50
17
Hex bolt
M10x60mm
108
18
Self locking bolt
M6x40mm
60
18A
Mushroom head hexagon
socket head bolt
M6x50mm
8
19
Hex bolt
M8x20mm
26
19A
Hex bolt
M8x80mm
4
19B
Hex bolt
M8x50mm
10
19C
Hex bolt
M6x80mm
2
20
Door cover
W1140xL2030mm
1

►
www.tmgindustrial.com 5/22 Toll Free:1-877-761-2819
21
Water plug
φ32mm
6
21A
Water plug
30x30mm
4
21B
Water plug
φ25mm
10
22
Top cover
W90400xL10520mm
1
23
Front cover panel
W3220xL59520mm
1
23A
Rear cover panel
W3220xL59520mm
1
24
Braided rope
φ8x100m
1
24A
Ratchet straps
W38xL800mm
14
25
Allen key
4mm
1
26
Scratch resistant tape
10m
2

►
www.tmgindustrial.com 6/22 Toll Free:1-877-761-2819
STEP 2 : BASE PLATES INSTLLAION.
Mark the ground in the final building location with a line showing the positions of base plates, front, and rear doors. All
lines should be drawn from center to center of all baseplate tubes. Diagonal line X must be equal to Y.
Base plates: all base plates must be installed firmly with expansion bolts (#16) on this step.
NO.
PART
QTY
NO.
PART
QTY
5L
2
6A
2
5R
2
7
10
6
2
16
50

►
www.tmgindustrial.com 7/22 Toll Free:1-877-761-2819
STEP 3 : ASSEMBLE ALL TRUSSES.
The building includes 7 trusses: (1) front truss, (1) rear truss, and (5) middle trusses. The front and the rear
truss are to install with the fabric panel (#23 and #23A).
FRONT TRUSS
NO.
PART
QTY
NO.
PART
QTY
1
1
4
2
2A
2
17
10
3
2
19A
2

►
www.tmgindustrial.com 8/22 Toll Free:1-877-761-2819
REAR TRUSS
NO.
PART
QTY
NO.
PART
QTY
1
1
11
1
2
2
17
10
3
2
19
2
4
2
19A
2

►
www.tmgindustrial.com 9/22 Toll Free:1-877-761-2819
MIDDLE TRUSSES
NO.
PART
QTY
NO.
PART
QTY
1
1x5
11
1x5
2
2x5
17
12x5
3
2x5
19
2x5
4
2x5

►
www.tmgindustrial.com 10/22 Toll Free:1-877-761-2819
Lay down all (7) trusses on the ground as when the assembly is all completed and before moving to next
step.
NO.
PART
QTY
26
2

►
www.tmgindustrial.com 11/22 Toll Free:1-877-761-2819
STEP 4 : PUT UP THE FRONT (1ST) TRUSS.
Use of a crane or forklift is recommended, otherwise a team can use ropes to lift the trusses, but you
have to make sure it is safe, and have enough manpower. We recommend 3 to 5 people to pull the truss
up from different directions. When the truss is up, tie the ropes to the heavy objects to make sure the
truss will stay upright and use bolt (#17) to connect the truss to the baseplate on both sides.
NO.
PART
QTY
17
4

►
www.tmgindustrial.com 12/22 Toll Free:1-877-761-2819
Refer to Step 4 to put up the rest trusses, connect all purlins (#5) and (#5A) with bolt (#18) and bolt (#19)
secure all bolts firmly on each span before going to next truss.
NO.
PART
QTY
5
30
5A
50
5B
10
5C
35
17
24
18
60

►
www.tmgindustrial.com 13/22 Toll Free:1-877-761-2819
STEP 5 : INSTALL THE DIAGONAL BRACING BARS (#13).
Connect diagonal bracing bar (#13) on the first and last span between the shoulder tube and lower rafter
tube (#3 and #4) with tube clamp (#13A), use bolt (#19).
NO.
PART
QTY
13
4
13A
8
19
8

►
www.tmgindustrial.com 14/22 Toll Free:1-877-761-2819
STEP 6 : INSTALL THE REMAINING PARTS ON THE FRONT TRUSS.
NO.
PART
QTY
NO.
PART
QTY
8
1
12A
2
8B
1
13A
2
8C
2
13B
2
9
2
19
4
9B
2
19B
6
10
4
19C
2
11A
1
21
2
12
2
21B
4

►
www.tmgindustrial.com 15/22 Toll Free:1-877-761-2819
STEP 7 : INSTALL THE REMAINING PARTS ON THE REAR TRUSS.
NO.
PART
QTY
NO.
PART
QTY
8A
2
13A
2
9A
2
19
2
10A
3
19B
4
12B
3
21B
6

►
www.tmgindustrial.com 16/22 Toll Free:1-877-761-2819
STEP 8 : INSTALL FRONT COVER PANEL, WHAT YOU SEE IN THIS PICTURE IS THE INSIDE.
Lift the fabric panel (#23), starting from the center point (the highest ridge point) of the frame, tie the panel firmly
to the truss with a rope (A) through the grommet, and then tie one end of (A) to the truss. The woven fabric at the
posts (#8) and (#8A) of the door frame is tension with velcro.
NO.
PART
QTY
23
1
24
32m
ROPE CUTTING SIZE
24
QTY
A
7000mm
2
B
4000mm
4
C
2000mm
1

►
www.tmgindustrial.com 17/22 Toll Free:1-877-761-2819
Assemble the sliding door. Fix the door column (#14) and (#14A) on the cross pull tube (#15) with bolts
(#18A).
NO.
PART
QTY
NO.
PART
QTY
14
1
18A
8
14A
1
20
1
15
4
21A
4

►
www.tmgindustrial.com 18/22 Toll Free:1-877-761-2819
Sliding door installation. The assembled door cover cloth (#20) of the sliding door cover is fixed on the door
frame of the front truss through the hinge.

►
www.tmgindustrial.com 19/22 Toll Free:1-877-761-2819
STEP 9 : INSTALL REAR COVER PANEL, WHAT YOU SEE IN THIS PICTURE IS THE INSIDE.
Use rope (#24) to lift up the rear cover (#23A) from the center grommet and tie it firmly to the truss tube and
spread toward both sides through each grommet along the tube.
NO.
PART
QTY
23A
1
24
32m
ROPE CUTTING SIZE
24
Qty
A
7000mm
2
B
9000mm
2
Table of contents
Other TMG Tent manuals
Popular Tent manuals by other brands

Ameristep
Ameristep OUTHOUSE BLIND 804 Instruction and safety manual

Rhino Shelter
Rhino Shelter PB143012RGN Assembly instructions

Big Agnes
Big Agnes Copper Spur Ultralight Series Copper Spur... Setup instructions

ZANE ARTS
ZANE ARTS TP-003/GEU owner's manual

Boutique Camping
Boutique Camping Luna Bell Tent BC632 instruction manual

THE THEORY WORKS
THE THEORY WORKS Quadratic operating instructions