TMG TMG-GHL 1020 User manual

W W W .T M GI N D U S T R I A L . C O M P 0 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9

W W W .T M GI N D U S T R I A L . C O M P 1 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Main specifications
Overall assembled size : W3 x L6.5x H3.6(m) / W10 x L21x H12 (ft)
Shoulder height : H1.6 (m) / 5ft
Door : W1.2 x H2 (m) / 4 x 6.5 (ft)
Prior to assembly
Please read the instructions carefully before installation. It is important to follow your
local safety regulations and industry standards during installation. Regulations may
include but are not limited to :
Safety helmets, protective eyewear, and clothing
Safety harnesses for all elevated workers
Proper ladder, cage, and safety operation
Check all components and parts before installation. All parts are marked with a part
number, please refer to the parts list to make sure you have all parts.
Choose a day with low or no wind to install, assembly is hard in heavy wind. Do not
make any alterations to the structure. Do not hang any weights on the frame during
installation, including parts. We are not responsible for any damages or injuries caused by
inappropriate installation, unauthorized modifications or extreme weather.
This building is not intended for human occupancy.
It is recommended to tape or add foam/rubber on the frame where joints connect and
where it touches the cover. This will help extend the life span of the cover.
Read the following item list carefully and count the number of items to ensure that all
parts are included prior to setup.

W W W .T M GI N D U S T R I A L . C O M P 2 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
TMG-GHL1020 Part List
Parts
code
Graphical
Description
length(mm)
Qty
1
Top inclined tube
2142
6
2
Shoulder tube
1757
6
3
Sidewall tube
1452
8
3A
Sidewall tube
1452
1
3B
Door frame upper tube
(front and rear truss)
2072
2
3C
Middle upper tube
(rear truss)
1552
1
4
Top wall mounted tube
(front truss)
1360
1
4A
Top wall mounted tube
(middle and rear truss)
1300
4
5
Roof purlin
(horizontal tube)
1340
10
5A
Base plate
150x150
9
5B
Door column base plate
150x150
2
6
Door left lower vertical tube
2016
1
6A
Door left upper vertical tube
747
1
6B
Door right lower vertical tube
2021
1
6C
Door right upper vertical tube
1196
1
7
Door frame cross pull tube
1154
1
8
Door frame column left tube
1970
1
8A
Door frame column right tube
1970
1
9
Door horizontal tube
1065
4

W W W .T M GI N D U S T R I A L . C O M P 3 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
10
Door frame horizontal tube
(front truss)
790
2
11
Door frame horizontal tube
(rear truss)
1375
2
12
Tube clamp
φ48
9
13
Connector tube
100
2
14
Roll film tube
1993
3
14A
Roll film tube -A
820
1
15
Film rolling machine guide
tube
1430
1
16
Clamping groove with hole
2000
4
17
Clip spring
2000
37
18
Clamping groove
2000
33
19
Eight clip spring
10
20
Pressure film carrier
φ25
5
21
Film rolling machine
1
22
Slide bolt lock
2
23
Expansion bolt
φ14x100
51
24
Self locking bolt
M10x80mm and nuts
M10x80
12
25
Hex bolt and nuts
M10x60
70
26
Hex bolt and nuts
M10x50
10

W W W .T M GI N D U S T R I A L . C O M P 4 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
27
Hex bolt and nuts
M10x30
2
28
Self tapping screw
#12x25
189
29
Self tapping screw
M12x35
24
30
Half round head bolt
M6x50
8
31
Square plug
30x50
2
32
Square plug
30x30
4
33
Round plug
φ25
2
34
Braided rope
20m
1
35
Top cover film
W6xL7m
1
36
Front and rear door film
W3.5xL4m
2
37
Adhesive tape
10m
1
38
Socket wrench
φ8
2
39
Hex wrench
φ4
2
40
Philips head screw
4x30
20
41
Expansion rubber plug
φ6
20
42
Board
(not included)
150x15x2000
9
43
Hex bolt and nuts
M10x100
1

W W W .T M GI N D U S T R I A L . C O M P 5 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Installation steps
Step 1 : Review the whole structure and choose the proper installation site
Choose a solid, flat floor area where the floor is perpendicular to the walls to build
the building. Do not install the building on soft ground, wetland, uneven surfaces,
sloped surfaces.
We strongly recommend that you build the structure on a solid foundation such as
cement and use anchor bolts on all base plates.
Be aware of the surrounding area. Do not set up the building near snowdrifts, open
flames or exposed electrical wires. Do not keep heat sources near the fabric cover.
Keep the building surroundings clear at all times
Step 2 : Install top wall mounted tube and base plate
Install the top wall mounted tube (#4,#4A) on the wall and install the base plate on
the ground perpendicular to it (#5A,#5B) (refer to figure 1)
Parts used in this step :
-
(1) Top wall mounted tube (#4)
-
(4) Top wall mounted tube (#4A)
-
(9) Base plate (#5A)
-
(2) Door column base plate (#5B)
-
(51) Expansion bolts (#23)
-
(2) Square plug 30x50 (#31)

W W W .T M GI N D U S T R I A L . C O M P 6 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Figure 1
Step 3 : Assemble trusses
The building includes 6 trusses : (1) The former truss, and (1) Rear truss, and (4)
middle trusses. Please note the difference between the front, middle and rear
trusses.
First assemble the three main pipes of the truss (refer to figure 2) .Note the
distinction between sidewall tube (#3) and sidewall tube (#3A)

W W W .T M GI N D U S T R I A L . C O M P 7 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Parts used to install the front and rear truss in this step :
-
(1) Top inclined tube (#1)
-
(1) Shoulder tube (#2)
-
(1) Sidewall tube (#3A)
-
(4) Hex bolt and nuts (#25)
Figure 2

W W W .T M GI N D U S T R I A L . C O M P 8 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Install the remaining truss (refer to figure 3) .
Parts used in this step :
-
(1x5) Top inclined tube (#1)
-
(1x5) Shoulder tube (#2)
-
(1x5) Sidewall tube (#3)
-
(4x5) Hex bolt and nuts (#25)
Figure 3

W W W .T M GI N D U S T R I A L . C O M P 9 / 19 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
After installing the screws of the trusses, handle the pipe head interface : seal the
interface with adhesive tape (#37) and truss installation method (refer to figure 4)
Parts used in this step :
-
(1) Adhesive tape (#37)
Figure 4

W W W .T M GI N D U S T R I A L . C O M P 10/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
Assemble all trusses and fix the trusses on the baseboard. The installation effect
drawing of all trusses (refer to figure 5).
Parts used in this step :
-
(4x6) Hex bolt and nuts (#25)
Figure5

W W W .T M GI N D U S T R I A L . C O M P 11/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
Step 4 : Install the roof purlin.
Install roof purlin to fix all trusses (refer to figure 6)
Parts used in this step :
-
(2x5) Roof purlin (#5)
-
(2x6) Hex bolt and nuts (#24)
Figure 6

W W W .T M GI N D U S T R I A L . C O M P 12/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
Step 5 :Installation of rear trusses riser ( refer to figure 7).
Parts used in this step :
-
(2) Sidewall tube (#3)
-
(1) Door frame upper tube (#3B)
-
(1) Middle upper tube (#3C)
-
(2) Door frame horizontal tube (#11)
-
(4) Tube clamp (#12)
-
(8) Hex bolt and nuts (#25)
-
(4) Hex bolt and nuts (#26)
-
(2) Hex bolt and nuts (#27)
Figure 7

W W W .T M GI N D U S T R I A L . C O M P 13/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
Step 6 : Install the front truss riser and door (refer to figure 8).
Parts used in this step :
-
(1) Sidewall tube (#3)
-
(1) Door frame upper tube (#3B)
-
(1) Door left lower vertical tube (#6)
-
(1) Door left upper vertical tube (#6A)
-
(1) Door right lower vertical tube (#6B)
-
(1) Door right upper vertical tube (#6C)
-
(1) Door frame cross pull tube (#7)
-
(1) Door frame column left tube (#8)
-
(1) Door frame column right tube (#8A)
-
(4) Door horizontal tube (#9)
-
(2) Door frame horizontal tube (#10)
-
(5) Tube clamp (#12)
-
(2) Connector tube (#13)
-
(1) Clamping groove (#18)
-
(14) Hex bolt and nuts (#25)
-
(5) Hex bolt and nuts (#26)
-
(4) Self tapping screw (#28)
-
(8) Half round head bolt (#30)
-
(4) Square plug (#32)

W W W .T M GI N D U S T R I A L . C O M P 14/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
Figure 8
The whole structure inspection : Check all components and trusses to ensure that top
square pipe assembly welding of the wall is in line with the baseboard on the ground.
All trusses must be erected at an angle of 90 degrees. All purlins must be straight in line.
If any purl ins are not in line with they will need to be corrected before moving to the
next step.
Now it is the time to secure all bolts and nuts firmed on the structure. But do not
over-tight the bolts, otherwise the tubes might be damaged.

W W W .T M GI N D U S T R I A L . C O M P 15/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
Step 7 : Install board, clamping groove and then cover tarpaulin (refer to figure 9).
Parts used in this step :
-
(4) Clamping groove with hole (#16)
-
(32) Clamping groove (#18)
-
(165) Self tapping screw (#28)
-
(24) Self tapping screw (#29)
-
(20) Philips head screw (#40)
-
(20) Expansion rubber plug (#41)
-
(9) Board (not included) (#42)
Figure 9

W W W .T M GI N D U S T R I A L . C O M P 16/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
Note :
1. The top clamping groove (#18) is fixed on the top square pipe assembly welding
(#4,#4A) with Self tapping screw (#28).
2. The board (#42) is directly nailed to truss sidewall tube (#3,#3A) with self tapping
screw (#29).
3. Then clamping groove (#18) nail it to board (#42).
4. The part close to the wall directly nails the Clamping groove with hole (#16) on the
wall.
The clapping groove (#18) distribution of the front door and slide bolt lock (#22)
installation are as follows (refer to figure 10). After front and rear door film is covered,
the excess parts can be trimmed off.
Note : Where clamp groove (#16,#18) is installed, all tarpaulins need to be fixed by
Clip spring (#17).
Parts used in this step :
-
(14) Clip spring (#17)
-
(2) Slide bolt lock (#22)
-
(12) Self tapping screw (#28)
-
(1) Front and rear door film (#36)
Figure 10

W W W .T M GI N D U S T R I A L . C O M P 17/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
Installation and distribution of rear clamping film groove (refer to figure 11). The
excess parts can be trimmed off.
Parts used in this step :
-
(9) Clip spring (#17)
-
(1) Front and rear door film (#36)
Figure 11

W W W .T M GI N D U S T R I A L . C O M P 18/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
After installing tarpaulin on both sides, install top cover film (#35) (refer to figure 12).
First clamp tarpaulin with clip spring from the top, and then to the side.
Parts used in this step :
-
(14) Clip spring (#17)
-
(1) Top cover film (#35)
Figure 12
Step 8 : Installing the Film rolling machine.
To Install the film rolling machine, first fix the Film rolling machine guide tube on
the lower riser-a of truss (refer to figure 13).
This step covers tarpaulin top cover (#35) and installs roll film tube
(#14,#14A),And cut off the excess tarpaulin on both sides.
A round plug (#33) is put on both ends of the film rolling machine guide tube (#15),
and the guide tube is mounted on the frame with a hex bolt (#26), and it is required to
swing freely. After using a self tapping screw (#28) to connect the roll film tube
(#14), lay it flat on both sides of the frame. The film (#35) is wound on a roll film
tube (#14), and clamped with a pressure film carrier (#20). The film rolling machine
(#21) drives the roll film tube (#14) to be raised and lowered horizontally and
flexibly without jamming. (refer to figure 13).
In this step, install the film rolling machine on the film rolling machine guide tube
(#15) ,and the installation method is as follows : (refer to figure 13).
Installing braided rope (refer to figure 13)

W W W .T M GI N D U S T R I A L . C O M P 19/19 To l l F r e e : 1 - 8 7 7 - 761- 2 8 1 9
Parts used in this step :
-
(3) Roll film tube (#14)
-
(1) Roll film tube-A (#14A)
-
(1) Film rolling machine guide tube (#15)
-
(10) Eight clip spring (#19)
-
(5) Pressure film carrier (#20)
-
(1) Film rolling machine (#21)
-
(1) Hex bolt and nuts (#26)
-
(12) Self tapping screw (#28)
-
(1) Round plug (#33)
-
(20) Braided rope (#34)
-
(1) Hex bolt and nuts (#43)
Figure 13
After the Installation
Walk around and inspect the Insulation shed periodically to make sure all components are
still firmly secured and the whole shelter is well supported. Check all bolts and nuts as
well as all connection points to make sure they are all in good position.
We strongly recommend you remove any snow from the roof immediately. Do not leave
any snow load on the roof overnight. Keep 3 feet of clearance on all sides at all times. Do
not allow snow to accumulate and pile up on the sides of the building. Otherwise the
pressure from the sides will push inwards and could lead to a collapse.
Table of contents
Other TMG Tent manuals
Popular Tent manuals by other brands

Ameristep
Ameristep OUTHOUSE BLIND 804 Instruction and safety manual

Rhino Shelter
Rhino Shelter PB143012RGN Assembly instructions

Big Agnes
Big Agnes Copper Spur Ultralight Series Copper Spur... Setup instructions

ZANE ARTS
ZANE ARTS TP-003/GEU owner's manual

Boutique Camping
Boutique Camping Luna Bell Tent BC632 instruction manual

THE THEORY WORKS
THE THEORY WORKS Quadratic operating instructions