TRIBU 01811 User manual

PAVILION DAYBED
ASSEMBLY INSTRUCTIONS
PADA06 - 01-07-2019
01811
01821
01831
01841
01812
01822
01832
01842
01813
01823
01833
01843
01814
01824
01834
01844

CONTENT
BASE
CUSTOM BOLT
8x
SHORT BOLT
Every Pavilion Daybed consists out of 3 components: 1 base, 1 rear wall and 1 roof
element. Every component is available in dierent colors and/or materials.
Hardware packed with BASE:
REAR WALL
alu / teak / Sunvision / open
LONG BOLT
8x
LARGE CAP
4x
ROOF
alu / teak / Sunvision / movable Sunvision
HEADLESS BOLT
8x
SMALL CAP
8x
WASHER WITH SEAL
8x
ALLEN KEY
4x
HEXAGON BOLT WASHER
4x
FLOORANCHOR
4x (4x plastic + 4x
metal)

Hardware packed with TEAK ROOF Hardware packed with TEAK WALL
WOOD PLUG
LARGE 4x
WOOD PLUG
SMALL4x

If you want to assemble a anchored pavilion daybed proceed to step:
If you want to assemble a stand alone pavilion daybed proceed to step:
MAXIMUM PERMISSIBLE WIND SPEED
For areas with wind speeds above 45 km/h we advise you to use the floor anchors
delivered with the Pavilion daybed. If you expect wind speeds above 90 km/h
we strongly advice to apply additional safety measures and anchor the Pavilion
daybed with safety belts or even disassemble it.
The stability and wind resistance of the Pavilion daybed will depend on the
correct assembly of the Pavilion daybed and on the fixation system used to secure
the floor anchor system (check your local hardware supplier).
This information is for your guidance only. It is the sole responsibility of the
end-user to anchor the Pavilion daybed according to the actual weather conditions.
Maximum wind speed*
Km/h
Knots
Beaufort
Mph
Stand alone
45 km/h
24,3 knots
6 beaufort
28 mph
Anchored
90 km/h
48,6 knots
10 beaufort
56 mph
(*) valid when fully assembled and tightened according to the Pavilion daybed Assembly Instructions
1
2
5
ASSEMBLY INSTRUCTIONS
Please note that you need at least 4 people and 4 ladders to assemble the
Pavilion Daybed!

Put the BASE upside down on a protective cover and unscrew the gliders
2
Place the WASHER between the HEXAGON BOLT and the bottom of the
FLOOR ANCHOR. Fully tighten the HEXGON BOLTS. Do not use power-
tools.
3
Put the base on it’s final location. Use the correct hardware to secure the
base to the floor. When secured proceed to step: Do not use power-
tools.
4
6

Put the base on it’s final location and make sure that it is level (you can
adjust the feet).
Then insert 4 x CUSTOM BOLTS into the threaded holes.
Use the allen key to fix these bolts.
5
6

Teak / Alu wall Sunvision / Open wall
LABEL: ‘This side down.’
Attach the front poles by sliding them over the CUSTOM BOLT. Use a
WASHER WITH SEAL and LONG BOLT to hand-tighten the pole from
below. Not too tight however, this will need to be done in step 13 +15. Make
sure the soft part of the WASHER WITH SEAL is facing upwards.
Position the poles on the foot end.
Unpack the wall and position it onto the base. Make sure to slide the wall
over the two CUSTOM BOLTS at the same time and speed. Support the
wall as long as it is not fixed with screws.
The aluminium and teak WALLS have a label to mark the bottom.
7
8

Keep supporting the wall and fix it with two LONG bolts. Use the allen key.
Unpack the roof and put it upside down on a protective surface.
Insert 4 x CUSTOM BOLT into the threaded holes. Use the allen key to fix
these bolts.
9
10

To position the roof onto the front poles and wall you need at least 4
people with ladders. Carefully slide the custom bolt into the poles and wall
at the same time at the same speed. The roofs have a label to mark the
head end.
11
Fix the roof with 4 x LONG BOLT and 4 x WASHER. Make sure the soft part
of the washer is facing towards the floor. Use the allen key to fix these
bolts. Tighten the LONG BOLTS strongly.
12
LABEL: ‘Head end’

Strongly tighten the 4 bolts that connect the frame with the front poles and
the backrest. Use the Allen key.
13
On the inside of both the wall and the front poles you will find threaded
holes for the HEADLESS BOLT. Use an allen key to fix these bolts.
BOTTOM
TOP
14

Simulate windy weather by pulling and pushing repeatedly against the wall.
Afterwards tighten all screws again with the Allen key, starting with the
LONG BOLTS.
15
Finally cover the 8 x HEADLESS BOLTS with the 8x SMALL CAPS and the
4 x LONG BOLTS in the roof wit the 4 x LARGE CAPS.
In case of a teak wall or teak roof, use the WOOD PLUGS.
4 x WOOD PLUG LARGE to cover the LONG BOLTS in the teak roof.
4 x WOOD PLUG SMALL to cover the HEADLESS BOLTS in the teak wall.
These wood plugs have to be glued and finished with sand paper.
16
LARGE CAP
WOOD PLUG LARGE
SMALL CAP
WOOD PLUG SMALL

If your daybed has the following components, continue to the corresponding step.
Sunvision wall + Sunvision roof / movable Sunvision roof: step
Sunvision wall + teak roof / aluminium roof: step
Side table: step
Curtain: step
Remove the screws from the Sunvision roof on the wall side.
17
18
20
22
25
18
Position the Sunvision wall on the upper wall side of the Pavilion Daybed
structure and put the Sunvision roof back over it. Make sure all the holes
correspond with the holes in the frame and attach with the provided
screws. Hand tighten these screws, but not too tight. This will need to be
done at the end of step 17. Continue to step
19
21

Attach the Sunvision wall to the Pavilion Daybed structure with the screws
provided. Hand tighten these screws.
20

To attach the Sunvision wall to the BASE, use 2 x Allen key with a round
head. Insert them into the 3rd and 5th hole of the Sunvision wall.
Then search the corresponding threaded hole in the BASE and insert the
round head of the Allen key into this hole.
21

Now use the Allen key as a lever to force the Sunvision down. Once the
holes are aligned, insert a screw and hand tighten. Repeat this procedure
for all other screws.
Use an Allen key to tighten all screws as much as you can.
6 x on the bottom of the base + 6 x on top of the roof.

Unpack the side table and assemble it.
22
Locate the threaded holes at the bottom of the BASE. Insert the table
between the 2 outer tubes of the BASE and match the holes in the BASE
with the holes in the table support. The side table can be placed on the left
side or the right side of the BASE.
bottom view
23

Use the Allen key and 2 x flathead bolts provided with the side table to fix
it.
24
bottom view

There are 6 STOPPERS provided with every curtain set.
The STAINLESS STOPPERS can be inserted into the
curtain rails and need to be fixed with an Allen key.
The ROLLERS can be inserted into the curtain rails.
Afterwards the curtain can be attached to these
ROLLERS.
Advised installation order:
foot
end
1 x
STOPPER
19 x
ROLLER
1 x
STOPPER
1 x
ROLLER
1 x
STOPPER
head
end
25

Attach the curtain to the ROLLERS by inserting the curtain hooks into the
holes of the rollers.
bottom view

POLE
CURTAIN
POLE
CURTAIN
To secure the closed curtains to the backpole, use the provided fabric
strap. To start make sure the right side of the fabric strap is pointed
towards you.
26
Take the side with 2 pressbuttons and attach it to the button on the outside
of the curtain.
27
Fold the Fabric strap aroud the
back pole.
28
This manual suits for next models
15
Other TRIBU Outdoor Furnishing manuals
Popular Outdoor Furnishing manuals by other brands

Festival Depot
Festival Depot PF20206 Assembly instructions

StarEcho
StarEcho PT0570B2S-1 Assembly instructions

YOTRIO
YOTRIO BH19-092-097-07T Assembly instruction

Hanover
Hanover Almo 2356 manual

Gemmy
Gemmy Airblown Inflatable 13014 Assembly instructions

Outsunny
Outsunny 01-0731 Assembly & instruction manual