3. Connecting the LD6 - make connections onthe rear of the LD6 as shown;
Note: At (3) - when not in use the L-band card 50Ω TNC terminator MUSTbe secured to TNC on
card.
4. Turn on power and wait until unit has initialized (2 -3 mins.);
Key
1 LD6 UnitID (5 digits)
2 S –LBand beam Synch Green = yes Red = notsynched with beam
3 E –VERIPOS corrections Green = enabled Red = notenabled
4 LBand signal strength indicator
5 Touch screen buttons to accessLBand card,GNSS card,optionalMF
(Beacon SBX receiver) and UHF ADL cards,informationand controls.Buttons
provideaccess to each receiver(as fitted).
6 LD6 time display (UTC)
7 Buttons in red indicates thecards haveaconfigurationor faultcondition and
are notworking to correctlimits
8 Actions –Shut down,Log Off,Reboot,Factory Reset, Screen(s) calibration,
Launch Orion Or Verify-QC software (option)
9 Solutions –Status includingcurrentposition,selecttherequired PPP solution,
config ofsolution andNMEA outputselection
10 Settings –Set up ofposition outputports and network configuration
5. Beam Selection
A detailed description is in the LD6 Operations Manual.
Select a Veripos correction satellite beam for your vessel work area:
For beam selection go to LBand/Config/Beams/Edit. Use the up/down arrows to
select the required beam for the vessels’ work area.
6. Enable for Veripos Corrections
On the Home page check the Sync indicator is Green
You will need to contact the Veripos Helpdesk to request an Access Code and
quoting your Unit ID, Service Access Licence (SAL) number and services
required.
Navigate to LBand/AccessCode to view the currentstatus: