4.11 Propane Gas Connections________________________________________________________________34
4.12 Flow And Return Pipe Connections ________________________________________________________35
4.13 Pressure Relief Valve (Supplied)___________________________________________________________35
4.14 Csd-1 Manifold Assembly (Supplied) _______________________________________________________35
Installing the Flow Switch and CSD-1 Components_________________________________________36
4.15 Determination Of Primary Boiler Pump Or Boiler System Pump __________________________________37
4.16 Condensate Piping And Drain_____________________________________________________________38
4.17 Water Treatment ______________________________________________________________________39
4.18 Important Installation Warnings___________________________________________________________40
Oxygen Levels in the System Water Warning _____________________________________________40
Antifreeze Compatibility Warning ______________________________________________________40
Lime Scale and Corrosive Water Damage Warning _________________________________________40
Connection to Refrigeration System Warning_____________________________________________40
4.19 Air Intake Connection___________________________________________________________________40
4.20 Flue Manifold Connection _______________________________________________________________41
4.21 Flue Exhaust Piping To Vent ______________________________________________________________42
4.22 Vent Starter Pieces _____________________________________________________________________43
4.23 Combustion Air And Ventilation Openings___________________________________________________44
Insufficient Ventilations and Combustion Air _____________________________________________44
Room Air Combustion _______________________________________________________________45
Sealed Combustion _________________________________________________________________45
4.24 Installation Of The Exhaust And Air Intake System_____________________________________________45
Important Factors for Terminal Orientation and Location ___________________________________46
Minimum and Maximum Wall Thickness_________________________________________________46
4.25 Vent Pipe Sizing _______________________________________________________________________47
4.26 Electrical Connections___________________________________________________________________49
Regulations in Force_________________________________________________________________49
Mains Electrical Supply Connection (120 V –60 Hz) ________________________________________49
Service Relay Requirement ___________________________________________________________50
Electrical Requirements______________________________________________________________50
4.27 FUNCTIONAL WIRING DIAGRAM Page 1_____________________________________________________52
4.28 FUNCTIONAL WIRING DIAGRAM Page 2_____________________________________________________53
4.29 Ladder Diagrams_______________________________________________________________________54
4.30 General Ladder Diagram_________________________________________________________________55
4.31 Input/Output Box Terminal Assignments____________________________________________________56
4.32 Starting Up: Filling And De-Aerating The Boiler _______________________________________________57
Necessary Precautions for Safety ______________________________________________________57
Supply Voltage, Gas Pressure, and Water pressure_________________________________________57
4.33 Filling The System ______________________________________________________________________58
Necessary Precautions While Filling the System ___________________________________________58
Filling Locations and Preparation_______________________________________________________58
4.34 Testing The Ignition Safety Shut Off Device __________________________________________________60
4.35 Burner Calibration _____________________________________________________________________61
Installing the Gas Analyzer Probe ______________________________________________________61
Maximum Output Calibration _________________________________________________________62
Minimum Output Calibration _________________________________________________________63
Final Check and Ignition Failure Adjustment Procedure _____________________________________63
4.36 Sweeper Mode (Manual Control)__________________________________________________________65
4.37 High Altitude Adjustment________________________________________________________________67
4.38 High Altitude Conversion Label ___________________________________________________________68
4.39 Conversion From Natural Gas To Propane Gas________________________________________________68
4.40 Controls And Emergency Functions ________________________________________________________69
4.41 Initial Boiler Ignition ____________________________________________________________________70
Preliminary Checks__________________________________________________________________70
CHAPTER 5: UFLY CONTROLLER & BCM MODULES _________________________________________________71
5.1 Ufly Controller _________________________________________________________________________71