4
Phase One
Blockout Installation Procedure
(during earth or masonry work)
1) Ensure a suitable recess is provided to accommo-
date installation blockout/mounting ring assembly
B/M.
2) Set installation blockout/mounting ring assembly
B/Min position and ensure that:
a) Arrow Ron mounting ring Mis pointed towards
the object to be illuminated (wall, tree, column).
b) Mounting ring MLVƃXVKZLWKVXUIDFHF. If the
ƃRRUZLOOEHWLOHGRUSDYHGDIWHUZDUGVOHDYHDQ
appropriate gap.
c) Mains supply cable(s) OLVRIVXIƂFLHQWOHQJWKWR
connect sealable junction box Jwith cable Efrom
luminaire.
3) During ongoing earth and/or masonry works, do
QRWUHPRYHVWLFNHUVRQƂ[LQJWKUHDGKROHVD.
Ensure that installation blockout/mounting ring
assembly B/Mis not damaged and has maintained
its original shape. If necessary use a cover plate.
Phase Two
Luminaire Installation and Electrical Connection
4) Switch off mains electrical supply.
5) Check that rating shown on luminaire label conforms
with mains electrical supply.
6) Terminate cable Efrom luminaire housing Aand
mains supply cable O(for individual wiring) or
branch cable (for through wiring) in sealable junc-
tion box J– to connect cable(s). Follow the seal-
able junction box termination instruction included
in the packaging.
7) 3HHORIIVWLFNHUVRQƂ[LQJWKUHDGKROHVD. Set cables
and sealable junction box Jinside installation
blockout/mounting ring assembly B/M.
8) Remove hood assembly Hby loosening screws K.
9) Loosen countersunk screws C(do not turn out).
Insert mounting lever Lbetween head of counter-
sunk screws Cand cover lens. Place luminaire
housing Ainto installation blockout/mounting ring
assembly B/M(Fig. III) while aligning holes Don
mounting ring M.
Warning: When luminaire is placed inside installa-
tion blockout B, ensure there is no stress on seal-
able junction box Jor electric cables (Fig. IV).
10)Tighten countersunk screws C 'hand-tight'.
11)Reposition hood assembly Hand tighten screws K.