
INSTALLATION INSTRUCTIONS
1.
Lower the LED Flex down the shaft while holding it firmly underneath the
connection point with the power cable.
3.
Secure the LED Flex to the plugs with the cable ties provided.
4.
Continue with the installation of the LED Flex by repeating Step 2 and 3.
NOTE: Depending on the nature of the wall, 2 or 3 fixings may be required
for the first metre/top of the shaft. Thereafter, a fixing every 2m to 3m should
suffice.
5.
Power on the LED Flex.
2.
Drill 8mm holes along the desired path of the LED Flex and insert
the push-plugs, as shown.
Do not suspend the LED Flex by the power cable,
as this may cause the electrical connection to loosen.