
WISE CONTROL
turbulence and axial flow.
It will be explained in detail at the provisions for the principle of the flowmeter,
INSTALLATION & OPERATION
MANUAL
DOC.NO. : C-QIM-2731-F14
PAGE : 5/10
of the problem, the investigation of the cause, resolutions and prevention in future.
of the malfunction and defect, which is being kept in record, and Occasional
Check-out of the cleanness and tightness. Post Program is designed for the reactive
of the flowmeter after the malfunction occurred and is included in the understands
It shall be installed by the instruction specified and flushed the flowmeter prior
①Confirm the flow direction with the indication on the flowmeter.
②Use the correct size of the tightening bolts with the Pipe.
③Install the seal such as gasket to prevent from leaking.
④Tighten the bolts with the constant force and the diagonal directional sequence.
⑤Follow the specified earthing method in electrical works.
(refer to the attached wiring diagram)
Generally the maintenance program can be classified by two types; Precautionary
program and Post program.
In Precautionary program, it is included in the Internal Check List for the precaution
maintenance and checking method for each type of the flowmeter.
This is the device to reduce the error on reading due to the air or steam
included in the fluid flow. It shall be applied in the system using the mass flowmeter.
This is the device to prevent the damage by collecting the dust, chips, sand or
other foreign substances in the fluid flow.
The is the device installed at the upstream of the flowmeter in order to minimize
the effects on the flowmeter characteristics by removing or reducing the vortex,