
Manual 26174 EGCP-2 Engine Generator Control Package
Woodward v
Illustrations and Tables
Figure 4-9. PF /kVAR Status ................................................................................64
Figure 4-10. Sequencing Menu ............................................................................65
Figure 4-11. Sequencing Menu (Multi-Unit) .........................................................66
Figure 4-12. ATS (Automatic Transfer Switch) Status. ........................................67
Figure 4-13. Security Code Display......................................................................68
Figure 4-14. Alarm / Event Screen .......................................................................69
Figure 4-15. Empty Event Log..............................................................................70
Figure 4-16a. Configuration Menu List (Screen 1) ...............................................71
Figure 4-16b. Configuration Menu List (Screen 2) ...............................................71
Figure 4-16c. Configuration Menu List (Screen 3) ...............................................72
Figure 4-17. Program Configuration Error............................................................73
Figure 4-18. AC Power Triangle...........................................................................76
Figure 4-19. Breaker Logic and Contactor Logic .................................................79
Figure 4-20. Generator High/Low Voltage Alarms ...............................................80
Figure 4-21. Generator Over/Under Frequency ...................................................81
Figure 4-22. Delay Time is 10 Seconds, Current goes to 190 A, an Alarm or
Shutdown will be Received in 30 Seconds......................................83
Figure 4-23. Delay Time is 10 Seconds, Current goes to 200 A, an Alarm or
Shutdown will be Received in 15 Seconds......................................83
Figure 4-24. Delay Time is 10 Seconds, Current goes to 220 A, an Alarm or
Shutdown will be Received in 7.5 Seconds.....................................84
Figure 4-25. Reverse Power.................................................................................85
Figure 4-26. Typical Circuit Using Permissive Function and Run for Auto/Manual
Synchronizing ..................................................................................88
Figure 4-27. Voltage Matching (1% set point) ......................................................89
Figure 4-28. Maximum Phase Window = 10 Degrees..........................................90
Figure 4-29. EGCP-2 Control Dip Switch .............................................................95
Figure 4-30. Direct (Export) Process Action.........................................................96
Figure 4-31. Indirect (Import Power) Process Action ...........................................96
Figure 4-32. Direct (Import/Export) Process Action .............................................96
Figure 4-33. Process In Scale ............................................................................105
Figure 4-34. Measured vs. Monitored ................................................................105
Figure 4-35. Typical AVR with Aux Input (Newage SX-440)..............................107
Figure 4-36. Typical AVR with External Voltage Adjust Potentiometer..............107
Figure 4-37. AVR Droop .....................................................................................108
Figure 4-38. Oil Pressure Sensor Curve ............................................................112
Figure 4-39. Water Temperature Curves ...........................................................115
Figure 4-40. EGCP-2 Water Temperature Characteristics ................................115
Figure 5-1. Droop Mode .....................................................................................122
Figure 5-2. Isochronous Mode ...........................................................................123
Figure 5-3. Droop/Isochronous Load Sharing ....................................................124
Figure 5-4. Synchronizer Time Line—Standard Sequence................................132
Figure 5-5. Loss of Mains Detection Active........................................................133
Figure 5-6. Generator Off Line ...........................................................................133
Figure 5-7. Mains Parallel Unit with Voltage/Frequency Detect.........................134
Figure 5-8. Mains Parallel Unit(s) with Load Surge Detect ................................134
Figure 5-9. Typical Automatic Sequencing Scenario .........................................136
Figure 5-10. Original System Configuration .......................................................139
Figure 5-11. After a Change of Priority—Units Not Operating ...........................139
Figure 5-12. Original System Configuration .......................................................140
Figure 5-13. Master transfers to Unit 2...............................................................140
Figure 5-14. Changing the Priority of a Slave Unit.............................................142
Figure 5-15. Changing the Priority of a Slave Unit.............................................142