manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Xtreme Power Conversion
  6. •
  7. Batteries Pack
  8. •
  9. Xtreme Power Conversion XPRT Series User manual

Xtreme Power Conversion XPRT Series User manual

This manual suits for next models

3

Other Xtreme Power Conversion Batteries Pack manuals

Xtreme Power Conversion BP-XR2U480A Guide

Xtreme Power Conversion

Xtreme Power Conversion BP-XR2U480A Guide

Xtreme Power Conversion BP-XR4U480A Guide

Xtreme Power Conversion

Xtreme Power Conversion BP-XR4U480A Guide

Popular Batteries Pack manuals by other brands

Acumentrics PACK-POWER SYSTEM Quick reference guide

Acumentrics

Acumentrics PACK-POWER SYSTEM Quick reference guide

ACDC Dynamics SPF12-50 user manual

ACDC Dynamics

ACDC Dynamics SPF12-50 user manual

Aegis ABL-72020P user manual

Aegis

Aegis ABL-72020P user manual

Dyness TowerESS user manual

Dyness

Dyness TowerESS user manual

Growatt APX 5.0P-S0-US user manual

Growatt

Growatt APX 5.0P-S0-US user manual

CyberPower BCA Series installation manual

CyberPower

CyberPower BCA Series installation manual

Dometic PLB40 operating manual

Dometic

Dometic PLB40 operating manual

V-TAC VT-48280-W2 instruction manual

V-TAC

V-TAC VT-48280-W2 instruction manual

Valence RT user guide

Valence

Valence RT user guide

Nikon MB-D14 user manual

Nikon

Nikon MB-D14 user manual

Clas Ohlson PW-290A quick start guide

Clas Ohlson

Clas Ohlson PW-290A quick start guide

EINHELL MULTI-Ah Power X-Change Plus Original operating instructions

EINHELL

EINHELL MULTI-Ah Power X-Change Plus Original operating instructions

IOGear GBP24V Series user manual

IOGear

IOGear GBP24V Series user manual

Samsung EB-U3300 quick start guide

Samsung

Samsung EB-U3300 quick start guide

ECTIVE LC Series instruction manual

ECTIVE

ECTIVE LC Series instruction manual

Narada 12REXC70 Operation manual

Narada

Narada 12REXC70 Operation manual

Festool BP 12 Original instructions

Festool

Festool BP 12 Original instructions

Simons Voss Technologies CR2450 quick guide

Simons Voss Technologies

Simons Voss Technologies CR2450 quick guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Date: 2007-05-18 Page: 1 of 11 Version 1.1
Instruction Manual
For
Battery Pack Installation
Xtreme Performance Rack/Tower
Series
(XPRT)
Date: 2007-05-18 Page: 2 of 11 Version 1.1
Safety Warning and Caution!
1. Risk of Electric Shock, This Battery Pack contains batteries inside, Energized
parts and Hazardous electrolyte are harmful to personnel. Hazardous voltage
may exist between battery terminals and ground. Test before touching.
2. This Battery Pack is designed for installation in a controlled environment. To
reduce the risk of fire, replace only with the same type and rating of fuse or
circuit breaker.
3. Warning, Battery Pack is very heavy. Please be very careful when handling and
installing the Battery pack. Do not install the battery pack by the two front
mounting ears only. The adjustable rack rails( Model #: XPRT-RR1) illustrated
in this manual are required for installtion
4. Do not dispose of batteries in a fire. The battery may explode.
5. There is No user serviceable parts inside the enclosure. Do not open or mutilate
the batteries, released electrolyte is harmful to the skin and eyes. It may be toxic.
Servicing of batteries should be performed or supervised by personnel with
knowledge of batteries and the required precautions.
6. A battery can present a risk of electric shock and high short circuit current. The
following precaution should be observed when working with batteries:
--- Remove watches, rings or other metal objects.
--- Use tools with insulated handles.
--- Wear rubber gloves and boots.
--- Do not lay tools or metal parts on top of batteries.
--- Disconnect charging source prior to connecting or disconnecting battery
terminals.
Specifications for Battery Pack
Model XPRT-BP1 XPRT-BP2 XPRT-BP3
Battery type Lead-acid
7 Ah /12 V
Lead-acid
7 Ah /12 V
Lead-acid
7 Ah /12 V
Number of batteries 6 12 12
DC Bus Voltage 36Vdc 36Vdc 72Vdc
Dimensions W x D x H mm 428 x 425 x 84 428 x 610 x 84 428 x 610 x 84
Weight (Kg / lbs) 22 / 49 44 / 96 44 / 96
Date: 2007-05-18 Page: 3 of 11 Version 1.1
Battery Pack Installation Instructions
1. Installing the left Slide Rail on to the Post of Rack.
2. Installing the right Slide Rail on to the Post of Rack.
Date: 2007-05-18 Page: 4 of 11 Version 1.1
3. Placing the Battery Pack on to the Slide Rails.
4. Fastening the left Bracket.
5. Fastening the right Bracket.
Date: 2007-05-18 Page: 5 of 11 Version 1.1
6. Slide the Battery Pack into position and using the screws to
fasten the Brackets to the Front Posts of The Rack.
7. Top View of the installed Battery Pack on the Rack.
Date: 2007-05-18 Page: 6 of 11 Version 1.1
8. The Close-up View of the Bracket on the Rack Post.
Date: 2007-05-18 Page: 7 of 11 Version 1.1
Instructions for Connecting the Battery Pack(s)
zFirst disconnect the UPS from mains and loads before attempting an
External Battery Cabinet installation. Both Battery circuit breakers
(located in the back) must be “OFF”.
zRemove the Steel Cover that over the Battery Connectors on Rear Panel
of External Battery Pack, and on Rear Panel of UPS.
zUse the battery cable provided with the External Battery Cabinet to
connect the External Battery Pack to the UPS Unit.
zIf More than one Battery Pack are to be connected, then Connect the
second Battery Pack to the first one with the Battery Cable provided with
the second Battery Pack.
zPlease check and set UPS parameters to match the Battery Pack quantity
installed when using external Battery Packs.
Rear Panel View of 700VA ~ 1500VA UPS and EBP (6 pcs Batteries):
Date: 2007-05-18 Page: 8 of 11 Version 1.1
Rear Panel View of 700VA ~ 1500VA UPS and EBP (12 pcs Batteries):
Date: 2007-05-18 Page: 9 of 11 Version 1.1
Rear Panel View of 2000VA ~ 3000 VA UPS & EBP (12 pcs Batteries):
1. Make sure the Breaker on Battery Pack is in “OFF” Position.
Date: 2007-05-18 Page: 10 of 11 Version 1.1
10. Connect the Electrical Connections between UPS and Battery Pack.
The EBP Connector is keyed so as to insure correct Polarity.
11. Then, Turn the Breaker on Battery Pack to “On” Position.
Obtaining Service/Warranty
If the UPS requires Service: