Youngman BoSS Room-Mate User manual

BoSS Room-Mate
3T - Through the Trapdoor Method
Introduction
This BOSS ROOM-MATE User Guide is designed to provide
you with step by step instructions to ensure that your system is
erected with the maximum of ease and safety. Before assembly,
please read this User Guide. If the scaffold is passed on to
another person they should also receive these instructions.
Compliance
All BOSS ROOM-MATE Towers must comply with the general
requirements of the following:
BSEN 1004:2004
Work at Height Regulations 2005
Safety
Check that all the components are available and are functioning
correctly.
Check that the ground is level and capable of supporting the
weight of the structure.
During erection it is recommended that a temporary guardrail
brace be employed.
The safe working load is 275kg per platform uniformly
distributed, 750kg maximum per scaffold structure. This weight
should not be exceeded.
Lifting of equipment (at higher levels)
l Components should be firmly secured by a reliable lifting
material (e.g. rope) employing a reliable knot to ensure safe
fastening.
Movement
The Room-Mate should only be moved by manual effort at the
base.
No personnel or materials should be on the structure during
movements. During use
The BOSS ROOM-MATE is intended mainly for internal use - if
used externally, beware of winds in excess of 17mph (7.7 metres/
second) and cease working on the tower.
Raising and lowering of components should be conducted
within the base of the scaffold.
Beware of horizontal forces that generate in excess of 20 kg.
Preparation and Inspection
Inspect the equipment before use, to ensure that it is free from
damage and functions properly. Ensure you are using the correct
PPE equipment for the application on which you are working.
USER GUIDE
1
4 Rung
Guardrail Frame
Trapdoor
Platform
7-Rung
Lift Frame
Locking Pin
Base Unit
Castor
and
Castor Adaptor
or Adjustable leg
Toeboard
Set
Diagonal
Brace
Stabiliser
Horizontal Brace
Components
2

Assembly
1.8m Platform Height
Insert castor into adaptor
or adjustable leg and then
into base of frame.
Unfold base unit, insert
ocking pin, and locate deck
on 2nd rung of the tower.
Lock castors and
level base.
Insert 2 x
guardrail
frames.
Move deck to 7th rung of
tower.
Fit 4 x stabilisers *
Fit 4 x horizontals as
guardrails (3T method) on the
9th and 11th rungs.
Fit diagonal brace (blue)
on the front of the tower, from
the 4th to the 8th rung.
Fit toeboards. The Tower
is now complete.
* Stabilisers are not required
if tower is being used
internally at this deck height.
2.55m Platform Height
Insert castor into adaptor
or adjustable leg and then
into base of frame.
Unfold base unit, insert
locking pin. Fit horizontal
brace to 1st rung of open
side of base unit. Lock
castors and level base.
Insert
deck on
2nd rung
of tower.
Insert 2 x lift frames.
Fit diagonal brace (blue)
on front of tower, between the
4th and 8th rungs.
Insert deck on
10th rung.
Fit 4 x stabilisers.
Fit 4 x horizontal
braces (red) as
guardrails
(3T method)
on the 12th and
14th rungs.
Fit diagonal
brace (blue)
on the front of
the tower, between
the 10th and
14th rungs.
Fit toeboards.
The Tower is now
complete.
BOSS ROOM-MATE Quantity Schedule
Code Description Weight (WH) 2.80m 3.80m 4.55m 5.55m 6.30m 8.20m
(kgs) (PH) 0.80m 1.80m 2.55m 3.55m 4.30m 6.05m
No. of rungs to platform 3 7 10 14 17 24
Height 1 Height 2 Height 3 Height 4 Height 5 Height 6
333513 125mm Castor 2.50 4 4 4 4 4 4
324413 Castor Adaptor* 0.21 4 4 4 4 4 4
*When used on uneven ground and adjustment is required, 4 adjustable legs may be used which replace the castor adaptors.
301514 Base Unit 21.43 1 1 1 1 1 1
302514 7 Rung Lift Frame 9.80 2 2 4 6
303514 4 Rung Guardrail Frame 5.60 2 2
304511 1.8m Trapdoor Deck 14.35 1 1 2 2 3 4
312513 1.8m Horizontal Brace (red) 1.88 3 4 7 9 9 13
313513 2.1m Diagonal Brace (blue) 2.06 1 2 4 4 6
304514 Toeboard Set 10.00 1 1 1 1 1
317513 SP7 Fixed Stabiliser 5.80 4* 4 4
318513 SP10 Adjustable Stabiliser 9.87 4 4
* SP7 Stabiliser only required when ROOM-MATE is used externally.
Assembly
When erecting a BoSS Room-Mate:
To comply with the Work at Height Regulations, guardrails are
positioned in advance of climbing onto a platform to reduce the
risk of a fall.
All platforms feature double guardrails on both faces of the
tower.
All guardrails should be 2 and 4 rungs (0.5m and 1.0m) above
platforms.
Position handrails 4 rungs above platform level.
Position intermediate handrails 2 rungs above platform level.
Never stand on an unguarded platform
positioned above the second rung of
a tower. If your risk assessment shows
it necessary you may also need to
guardrail platforms at this level.
To dismantle a BoSS Room-Mate:
Remove toeboards, and pass down the tower.
Unclip farthest end of braces and immediately go to protected
trapdoor position on ladder to complete removal.
Remove upper platforms from protected platform levels below.
Pass removed components out of the tower to a colleague.
0.8m Platform Height
Insert castor into adaptor or adjustable
leg and then into base of frame.
Unfold base unit, insert locking pin.
Lock castors and level base.
Insert deck on 3rd rung of tower.
Fit horizontal braces (red) as guardrails,
on the 5th and 7th rungs.
The Tower is now complete.
(WH) = Working Height (PH) = Platform Height
3
4
5
2
1
3 4
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
10
5

Assembly
3.55m Platform Height
1 Insert castor into adaptor
or adjustable leg and then into
base of frame.
Unfold base
unit, insert
locking pin.
Fit horizontal
brace to 1st
rung of open
side of base
unit., lock
castors and level base.
Insert deck
on 2nd rung
of tower.
Insert 2 x lift
frames.
Fit diagonal brace (blue) on
front of tower, between the 4th
and 8th rungs.
Insert deck on 9th rung of
tower.
Fit 4 x stabilisers.
Fit 4 x horizontal braces
(red) as guardrails
(3T method) on
the 11th and
13th rungs.
Insert 2 x guardrail frames.
Remove 2 x horizontal
braces (guardrails 3T method)
from the 13th rung.
Remove the deck from the
9th rung of the tower.
Reposition the deck in the
tower, from the 2nd to 7th rung.
Reposition 2 x horizontals
as guardrails 3T method, on
the 9th rungs.
Fit diagonal
brace (blue) on
the front and
rear of the
tower.
Insert deck on the 14th
rung of the tower.
Fit 4 x horizontals as
guardrails 3T method, on the
16th and 18th rungs.
Fit diagonal brace (blue) on
the front of the tower, between
the 14th and 18th rungs.
Fit toeboards.
The Tower is now
complete.
Assembly
4.3m Platform Height
Insert castor into adaptor
or adjustable leg and then into
base of frame.
Unfold base
unit, insert
locking pin.
Fit horizontal
brace to 1st
rung of open
side of base
unit., lock castors and level
base.
Insert deck on 2nd rung of
the tower.
Insert 2 x lift frames.
Fit diagonal brace (blue) on
front of tower, between the 4th
and 8th rungs.
Insert deck on 9th rung of
tower.
Fit 4 x SP10 stabilisers.
Fit 4 x horizontal
braces (red) as
guardrails 3T
method, on the
11th and 13th
rungs.
Insert 2 x lift frames.
Fit diagonal
brace (blue) on
front and rear of
tower between
11th and 15th
rungs.
Insert deck on
the 17th rung.
Fit 4 x horizontal braces
(red) as guardrails 3T method,
on the 19th and 21st rungs.
Fit diagonal brace (blue) on
the front of the tower, between
the 17th and 21st rungs.
Fit toeboards.
The Tower
is now
complete.
Assembly
6.2m Platform Height
Insert castor into adaptor
or adjustable leg and then into
base of frame.
Unfold base unit, insert
locking pin. Fit horizontal brace
to 1st rung of open side of
base unit, lock castors and
level base.
Insert deck on 2nd rung of
the tower.
Insert 2 x lift frames.
Fit diagonal brace (blue)
on the front of the tower,
between the 4th and 8th rungs.
Insert deck on 8th rung of
tower.
Fit 4 x horizontals as
guardrails 3T method, on the
10th and 12th rungs.
Fit 4 x SP10 stabilisers.
Insert 2 x lift frames.
Insert deck on the 16th
rung of tower.
Fit diagonal brace (blue)
on the front and rear of the
tower, between the 11th and
15th rungs.
Fit 4 x horizontal braces
(red) as guardrails 3T method,
on the 18th and 20th rungs.
Insert 2 x lift frames.
Insert deck on the 24th
rung of tower.
Fit diagonal brace (blue)
on the front and rear of the
tower, between the 18th and
22nd rungs.
Fit 4 x horizontal braces
(red) as guardrails 3T method,
on the 26th and 28th rungs.
Fit diagonal brace (blue)
on the front of the tower,
between the 24th and 28th
rungs.
Fit toeboards. The Tower is
now complete.
Movement of all
ROOM-MATE
platforms
The scaffold should only be
moved by manual effort at the
base.
No personnel or materials
should be on the structure
during movement.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
7
1
2
3
4
5
6
7
8
9
11
12
13
14
15
16
17
18
10
8

Checklist
Inspect components prior to erection
Inspect tower prior to use
Tower upright and level
Castors locked/legs correctly adjusted
Braces and platform level
Stabilisers fitted as specified
Platforms located and windlocks on
Guardrails in place
Toeboards located
Refer to this checklist before using each time.
Product Range
SGB issues the following User Guides for its product ranges.
Please contact your local branch on 08705 288 388 if you would
like to receive any.
Alternatively, you can download them from our website, www.sgb.
co.uk
BOSS GRP Towers
BOSS Roommate
BOSS Stairway Towers
CUPLOK Scaffold System - Access
CUPLOK Scaffold System - Falsework Sup-
port
CUPLOK Scaffold System in use with Safety
Harnesses
COVERSPAN Temporary Roofing System
ENVIROWRAP Shrink Cladding System
EXTRAGUARD Edge Protection System
Fencing and Barriers
GASS Shoring System
Groundworks
Hoarding Panels
Ladders and Steps
Mobile Anchor
Props
Rollafloor Temporary Flooring
Rollaroad Temporary Roadway
ROOFGUARD Edge Protection System
- Permanent
ROOFGUARD Edge Protection System
- Temporary
Scaffold Tube, Fittings and Ladder Beams
Scaffolding Anchors and Ties
Spandeck, Stagings and Superboards
IMPORTANT INFORMATION
You must read all relevant guides, instructions and notices prior to
erecting SGB products and must comply with all warnings. SGB
will not be liable for any damage to property, personal injury or any
losses caused by your failure to follow the instructions contained in
this guide or with other applicable notices and guidance that SGB
produces.
This guide is intended only for use in conjunction with SGB
products.
SGB reserves the right to alter products from time to time to
comply with new regulations, other safety guidances or industry
advancements.
By mixing SGB products with other products you are risking your
safety. SGB will not be liable for any loss or damage caused as a
result.
SGB reviews and updates its user guides from time to time in line
with changes in legislation. SGB also issues safety notices on its
products or packaging from time to time. These notices could
affect the manner in which the products are used and you should
therefore adhere to the instructions contained in these notices as
well as the user guides. Where there is a conflict, most recently
published instructions should prevail.
Notices will be issued or published on the internet at
http://www.sgb.co.uk/updates
If you are in receipt of an incomplete user guide or lose your user
guide copies can be found at www.sgb.co.uk
All information in this User Guide is correct at the time of going to
press.
SGB Services Limited reserves the right to change products details
or withdraw products at any time.
© This brochure and its contents are the copyright of SGB Services
Limited
9
For further information about
this product or any other
products and services,
please contact :
Youngman Group Ltd
The Causeway, Maldon,
Essex, CM9 4LJ,
United Kingdom
t +44 (0)1621 745900
f +44 (0)1621 859845
e sales@youngmangroup.com
youngmangroup.com
10
Other Youngman Ladder manuals
Popular Ladder manuals by other brands

Hard Head
Hard Head 025441 operating instructions

Lippert Components
Lippert Components SolidStep 3.0 OEM INSTALLATION MANUAL

CSH
CSH PUTNAM instruction manual

FVC
FVC SP0207B installation guide

Stromberg Carlson Products
Stromberg Carlson Products LA-401 quick start guide

Westward
Westward 44YY25 Operating instructions & parts manual

Stompa
Stompa A015 Assembling instructions

UltraFire
UltraFire EasyScape instruction manual

Zepter
Zepter CleanSy AcrobaZ Instructions for use

PRIMAL TREESTANDS
PRIMAL TREESTANDS PVLS-316 Instruction and safety manual

Instant Upright
Instant Upright Span 400 manual

now!
now! 4000722004 Original instruction manual