Assembly
3.55m Platform Height
1 Insert castor into adaptor
or adjustable leg and then into
base of frame.
Unfold base
unit, insert
locking pin.
Fit horizontal
brace to 1st
rung of open
side of base
unit., lock
castors and level base.
Insert deck
on 2nd rung
of tower.
Insert 2 x lift
frames.
Fit diagonal brace (blue) on
front of tower, between the 4th
and 8th rungs.
Insert deck on 9th rung of
tower.
Fit 4 x stabilisers.
Fit 4 x horizontal braces
(red) as guardrails
(3T method) on
the 11th and
13th rungs.
Insert 2 x guardrail frames.
Remove 2 x horizontal
braces (guardrails 3T method)
from the 13th rung.
Remove the deck from the
9th rung of the tower.
Reposition the deck in the
tower, from the 2nd to 7th rung.
Reposition 2 x horizontals
as guardrails 3T method, on
the 9th rungs.
Fit diagonal
brace (blue) on
the front and
rear of the
tower.
Insert deck on the 14th
rung of the tower.
Fit 4 x horizontals as
guardrails 3T method, on the
16th and 18th rungs.
Fit diagonal brace (blue) on
the front of the tower, between
the 14th and 18th rungs.
Fit toeboards.
The Tower is now
complete.
Assembly
4.3m Platform Height
Insert castor into adaptor
or adjustable leg and then into
base of frame.
Unfold base
unit, insert
locking pin.
Fit horizontal
brace to 1st
rung of open
side of base
unit., lock castors and level
base.
Insert deck on 2nd rung of
the tower.
Insert 2 x lift frames.
Fit diagonal brace (blue) on
front of tower, between the 4th
and 8th rungs.
Insert deck on 9th rung of
tower.
Fit 4 x SP10 stabilisers.
Fit 4 x horizontal
braces (red) as
guardrails 3T
method, on the
11th and 13th
rungs.
Insert 2 x lift frames.
Fit diagonal
brace (blue) on
front and rear of
tower between
11th and 15th
rungs.
Insert deck on
the 17th rung.
Fit 4 x horizontal braces
(red) as guardrails 3T method,
on the 19th and 21st rungs.
Fit diagonal brace (blue) on
the front of the tower, between
the 17th and 21st rungs.
Fit toeboards.
The Tower
is now
complete.
Assembly
6.2m Platform Height
Insert castor into adaptor
or adjustable leg and then into
base of frame.
Unfold base unit, insert
locking pin. Fit horizontal brace
to 1st rung of open side of
base unit, lock castors and
level base.
Insert deck on 2nd rung of
the tower.
Insert 2 x lift frames.
Fit diagonal brace (blue)
on the front of the tower,
between the 4th and 8th rungs.
Insert deck on 8th rung of
tower.
Fit 4 x horizontals as
guardrails 3T method, on the
10th and 12th rungs.
Fit 4 x SP10 stabilisers.
Insert 2 x lift frames.
Insert deck on the 16th
rung of tower.
Fit diagonal brace (blue)
on the front and rear of the
tower, between the 11th and
15th rungs.
Fit 4 x horizontal braces
(red) as guardrails 3T method,
on the 18th and 20th rungs.
Insert 2 x lift frames.
Insert deck on the 24th
rung of tower.
Fit diagonal brace (blue)
on the front and rear of the
tower, between the 18th and
22nd rungs.
Fit 4 x horizontal braces
(red) as guardrails 3T method,
on the 26th and 28th rungs.
Fit diagonal brace (blue)
on the front of the tower,
between the 24th and 28th
rungs.
Fit toeboards. The Tower is
now complete.
Movement of all
ROOM-MATE
platforms
The scaffold should only be
moved by manual effort at the
base.
No personnel or materials
should be on the structure
during movement.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
7
1
2
3
4
5
6
7
8
9
11
12
13
14
15
16
17
18
10
8