Contents
Glossary...............................................................................................................................................................5
1Introduction ...................................................................................................................................................6
1.1 Preface................................................................................................................................................................6
1.2 Intended document users ..............................................................................................................................6
1.3 Similarities and differences between Terra 24 and Terra 54..................................................................6
1.4 Terra version description ............................................................................................................................... 7
1.5 Signs.................................................................................................................................................................... 7
1.5.1 Owner responsibilities ..................................................................................................................8
1.5.2 Tilting and handling.......................................................................................................................8
1.5.3 Sharp edges.....................................................................................................................................8
1.5.4 Electric hazards .............................................................................................................................. 9
1.5.5 Installation safety........................................................................................................................... 9
1.6 1.6 Environment and disposal of waste ......................................................................................................9
2Description of the product.........................................................................................................................10
2.1 Overview of the system................................................................................................................................ 10
2.1.1 Complete overview ...................................................................................................................... 10
2.1.2 Outside view...................................................................................................................................11
2.1.3 Inside view ......................................................................................................................................11
2.2 Geometry of infrastructure ......................................................................................................................... 12
2.2.1 Required space for placing and maintaining the Terra 54 .................................................. 12
2.2.2 Ventilation and airflow of the Terra 54.................................................................................... 12
2.2.3 Bollards........................................................................................................................................... 13
2.3 Electrical engineering ................................................................................................................................... 14
2.3.1 Requirements External RCD....................................................................................................... 14
2.3.2 Conductor and cable diameter ................................................................................................. 15
3Site design.................................................................................................................................................... 17
3.1 Cable reach.......................................................................................................................................................17
3.2 Different alignment possibilities.................................................................................................................17
4Site construction ......................................................................................................................................... 19
4.1 About construction........................................................................................................................................ 19
4.2 Power feed....................................................................................................................................................... 19
4.3 Construct foundation.................................................................................................................................... 19
4.3.1 Placement on soil ......................................................................................................................... 19
4.3.2 Placing the ABB Standard or locally manufactured prefab concrete
foundation ..................................................................................................................................... 19
4.3.3 Instructions for a custom foundation (footprint) ................................................................20
4.4 Power cable .....................................................................................................................................................20
4.5 Internet connection .......................................................................................................................................20
5Receiving, Placing and connecting ............................................................................................................22
5.1 Receiving the cabinet.................................................................................................................................... 22
5.2 Unpacking cabinet, mounting preparations............................................................................................ 22
5.2.1 Unpacking...................................................................................................................................... 22
5.2.2 Mounting preparations............................................................................................................... 23
5.3 Move cabinet to position..............................................................................................................................24