
11.4 Connect a wire that has a cable lug.....................................................................................66
11.5 Connect a wire that has a ferrule......................................................................................... 66
12 Technical data....................................................................................67
12.1 EVSE type.................................................................................................................................. 67
12.2 Parts included in the delivery................................................................................................ 67
12.3 Required tools for installation..............................................................................................68
12.4 Required parts for installation............................................................................................. 68
12.5 General specifications............................................................................................................69
12.6 Electrical installation requirements (Europe)....................................................................70
12.7 DC output specifications........................................................................................................71
12.8 Logic interfaces specifications............................................................................................. 71
12.9 Current peaks during the start of a charge session (DC output).................................. 72
12.10 Mass and center of gravity.................................................................................................... 72
12.10.1 Mass........................................................................................................................... 72
12.10.2 Center of gravity, power cabinet......................................................................... 72
12.10.3 Center of gravity, charge post..............................................................................73
12.11 Tilt sensor specifications (option)....................................................................................... 73
12.12 Ambient conditions.................................................................................................................73
12.13 Noise level................................................................................................................................. 74
12.14 Torque specifications.............................................................................................................74
12.15 Dimensions............................................................................................................................... 75
12.15.1 Power cabinet.......................................................................................................... 75
12.15.2 Charge post..............................................................................................................75
12.15.3 Height of user operable elements....................................................................... 76
12.16 Space requirements................................................................................................................ 77
12.16.1 Power cabinet.......................................................................................................... 77
12.16.2 Charge post..............................................................................................................78
12.16.3 Charge post: exceptions for bollards and other minor fixed obstacles...... 79
12.16.4 Distance requirements between power cabinet and charge post............... 80
12.17 Foundation specifications.................................................................................................... 80
12.17.1 Power cabinet (prefab concrete).........................................................................80
12.17.2 Power cabinet (custom)........................................................................................ 84
12.17.3 Charge post (prefab concrete)............................................................................ 86
12.17.4 Charge post (custom)............................................................................................88
12.18 Overview of the cable conduits............................................................................................ 89
12.19 Cable specifications................................................................................................................ 91
12.19.1 AC input cable for the power cabinet................................................................. 91
12.19.2 DC power installation cables ............................................................................... 91
12.19.3 PE cable..................................................................................................................... 92
12.19.4 AC auxiliary power cables......................................................................................92
12.19.5 Interlock and DC guard cables............................................................................. 92
12.19.6 Optical CAN cables between the power cabinet and the charge post........ 93
12.19.7 Cable for the tilt sensor control...........................................................................93
Contents
69AKK107992A2254-EN | 005