ABB Zenith ZTS T Series User manual

OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
Zenith ZTS T-series
For ZTS(D) T-series automatic transfer
switches 1600-3000 A and ZTSCT
T-series automatic transfer switches
400-3000 A, 208-480 Vac

2
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
—
Receiving, handling and storage
Read these safety instructions
carefully before using this produce
HAZARD OF EQUIPMENT
OVERTURNING
When moving with a fork lift, do not
remove the shipping packaging until the
device is in its final location.
Failure to follow this instruction may
result in personal injury or equipment
damage.
Receiving and handling
Upon receipt, carefully inspect the trans-
fer switch for damage that may have oc-
curred during transit. If damage is evident,
or there is visible indication of rough han-
dling, immediately file a damage claim
with the transportation company, and no-
tify your local ABB sales office.
Do not remove the shipping packaging un-
til ready to install the switch.
Storage
If the unit will not be placed into service
immediately, store the transfer switch in
its original package in a clean, dry
location. To prevent condensation,
maintain a uniform temperature. Store the
unit in a heated building, allowing
adequate air circulation and protection
from dirt and moisture. Storing the unit
outdoors could cause harmful
condensation inside the transfer switch
enclosure.
Warning
Indicates a hazardous situation that, if not
avoided, could result in death or serious
injury.
HAZARD OF ELECTRIC SHOCK,
EXPLOSION, OR ARC FLASH
• Apply appropriate personal protective
equipment and follow safe electrical
work practices.
• This equipment must only be installed
and serviced by qualified electrical per-
sonnel.
• Before performing visual inspections,
tests, or maintenance on the equip-
ment, disconnect all sources of electric
power. Assume that all circuits are live
unless they are completely de-ener-
gized, tested, grounded, and tagged.
Pay particular attention to the design of
the power system. Consider all sources
of power, including the possibility of
backfeeding.
• Disconnect all sources of electric power
before removing or making source side
or load side connections to the transfer
switch.
• Always use a properly rated voltage
sensing device at all line and load con-
nections to confirm transfer switch is
disconnected from all live electrical
sources.
• Turn off power supplying transfer
switch before doing any other work on
or inside switch.
Failure to follow these instructions could
result in death or serious injury.
Danger
Indicates a hazardous situation that,
if not avoided, will result in death or
serious injury.

3
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
2
—
Operation, maintenance,
and installation
instruction
Automatic transfer
switches, Zenith
ZTS T-series ATS
INSTALLATION INSTRUCTIONS,
ZENITH ZTS T-SERIES ATS,
CHAPTERS 9–11
OPERATION AND MAINTENANCE
INSTRUCTIONS, ZENITH
ZTS T-SERIES ATS,
CHAPTERS 1–8

4
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
—
Operation and
maintenance instruction
Automatic transfer
switches, Zenith
ZTS T-series ATS
1. Introduction 7
1.1 Hazard Categories 7
1.2 Warranty 8
2. Product overview 9
2.1 General overview 9
2.2 LED functionally in HMI 12
2.3 Zenith ZTS(D) T-series features 14
2.4 Operations 17
3. General operation 19
3.1 Position indication 19
3.1.1 Position indication - R5 19
3.1.2 Position Indication - 63L 19
3.2 Operating of automatic Transfer Switch
Equipment 19
3.2.1 Operation of Automatic Transfer
Switch equipment -R5 21
3.2.2 Operation of Automatic Transfer
Switch equipment -63L 22
4. Navigating HMI menu 23
4.1 Start Menu 23
4.2 Using main menu and setting parameters 25
4.3 Menus and parameters 26
4.4 Analog meters and Measures 39

5
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
5. Electronic accessories 40
6. Troubleshooting 41
6.1 Alarms 41
6.2 Warnings 43
6.3 Information 44
7. Technical data 45
7.1 General technical data 45
7.2 Circuit diagrams 48
8. Maintenance 51
9. Panel installation 52
9.1 Basic Tools for Installation
and Maintenance 53
9.2 Equipment Inspection and Storage 53
9.3 Lifting and mounting the panel 54
9.4 Mounting the automatic transfer switch 58
9.4.1 Mounting hole dimensions 58
9.4.2 Mounting hole dimensions
(stand-alone ATS, no enclosure) 59
9.5 Wire Connection 61
9.6 Final Equipment Inspection 62
9.7 Initial Energizing 63
10. Accessories 64
10.1 Auxiliary power supply and Ekip -modules 64
11. Replacement parts 66

6
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
—
1 Introduction
This manual describes the installation,
basic operation, and maintenance of
the Zenith ZTS(D) T-series 1600-3000 A
and ZTSCT T-series 400-3000 A,
208-480 Vac automatic transfer switches,
manufactured by ABB. Installation
instructions for the transfer switch and
available accessories can be found in
Chapters 9 and 10.
—
1.1 Hazard Categories
The following important highlighted
information appears throughout this
document to warn of potential hazards
or to call attention to information that
clarifies a procedure.
Carefully read all instructions and become
familiar with the devices before trying to
install, operate, service or maintain
this equipment.
Danger
Indicates a hazardous situation that, if not
avoided, will result in death or serious injury.
Warning
Indicates a hazardous situation that, if not
avoided, could result in death or serious
injury.
Caution
Indicates a hazardous situation that, if not
avoided, could result in minor or moderate in-
jury. Failure to comply with these instructions
may result in product damage.
Notice
It is used to notify of practices not related to
personal injury. Failure to comply with these
instructions may result in product damage.

7
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
—
1.2 Warranty
This document is based on information
available at the time of its publication.
While efforts have been made to ensure
accuracy, the information contained
herein does not cover all details or
variations in hardware and software,
nor does it provide for every possible
contingency in connection with
installation, operation, and maintenance.
Features may be described herein that are
not present in all hardware and software
systems.
ABB Zenith assumes no obligation of
notice to holders of this document with
respect to changes subsequently made.
ABB Zenith makes no representation or
warranty, expressed, implied, or
statutory, and assumes no responsibility
for the accuracy, completeness,
sufficiency, or usefulness of the
information contained herein. No
warrantees of merchantability or fitness
for purpose shall apply.
Contact your local sales office if further
information is required concerning any
aspect of the automatic transfer switch
operation or maintenance.
Warranty Period
The Warranty Period for ZTS T-series
transfer switch products is twenty-four
(24) months from the date of
shipment.
Notes: This warranty is valid only in the
United States and for products sold and
installed within seller-specified countries.
Replacement parts are warranted for a
period of 90 days when installed by a
factory or an authorized service station.
Contact Service team at: +1 800 637 1738
or epis.pqservice@abb.com for 24-hour
support.
Product Rating / Applicable Standards
For UL 1008 ‘withstand’ and ‘close on
short circuit’ ratings, refer to ABB
publication number 1SCC303020C0201.
Fig. 1 Sample nameplate
ZENITH ZTS
AUTOMATIC TRANSFER SWITCH FOR USE IN EMERGENCY SYSTEMS
Serial number US1150210400001
Model number ZSAC080PS3S5TBXXXX
Voltage
Rated current
Frequency
Phase
Transition type
460 - 480 Vac
800 A
50/60 Hz
3 Phase
Closed
Assembled in US

8
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
—
2.1 General overview
C – Controller
C – 1 Rating plug
C – 2 Source 1
C – 3 Source 2
C – 4 EKIP ACCESS
Communications Module
C-1 C-2
C-3
C-4
A
Programming Port
- only for Ekip Programming and
Ekip Connect Software
C
B
D
(Under cover)
A. Level 4 HMI, ZTS T-Series color touchscreen LCD
B. Automatic transfer switch (ATS)
C. ATS control unit
D. Handle for manual operation
E. Engine start terminal blocks
A. Level 4 HMI, ZTS T-Series color touchscreen LCD
B. Automatic transfer switch (ATS)
C. ATS control unit
D. Handle for manual operation
E. Engine start terminal blocks
F. Document holder (R5 only)
F
B
D
C
E
E
—
2 Product overview

9
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
Standard Transition Shown
B-ATS - R5
1. Customer Auxliary contact connection points
2. SCR Assemblies.
3. Customer manual operating ports
4. Transfer Coil Solenoids
5. Arc Chute Assemblies (Arc Quenching assemblies)
6. Movable Contact Assemblies
7. Position Limit Switches Auxiliary Contact Limit Switches
8. Mechanical Drive Assembly -mechanical interlock system
Source position status
I = contacts closed
O = contacts open
3
Covers Removed
8
4
7
5
1
6
2
1
32
8
7
4
5
6
Covers Removed
B-ATS - 63L
1. Customer Auxliary contact connection points
2. SCR Assemblies. Access by removing cover screws on side of panel (63L)
3. Customer manual operating ports
4. Arc Chute Assemblies (Arc Quenching assemblies)
5. Movable Contact Assemblies
6. Position Limit Switches Auxiliary Contact Limit Switches
7. Mechanical Drive Assembly -mechanical interlock system
8. Transfer Coil Solenoids

10
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
Operation types, ZTS T-series ATS Ekip-modules suitable
Delayed transition, ZTSD
Closed transition, ZTSCT
Open transition, ZTS
ZTS T-series HMI (with touch screen) and connections of control circuit
Suitable
—
Table 1 The differences of level types / operation types and the suitability of Ekip-modules
Operation types
In this table you can find the differences
of the automatic transfer switch open and
delayed transition operation types. Due
to the different transition types, there are
variances with HMI and on wiring of I/O
contacts. .
l
ON
ll
ON
AUTO
!
S1 S2
LOAD
lll
O
O
OFF
l
ON
ll
ON
AUTO
!
S1 S2
LOAD
lll
IS1 S2
Load
OII II
S1 S2
Load
I
HMI
The HMI is the control interface
(Human Machine Interface) of the
ATS.
Zenith ZTS T-series has a color touch-
screen LCD HMI with push buttons.
The HMI is used for configuring pa-
rameters for automatic operation.

11
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
LED Indication Description
Power led
Lamp
test
l
Off
load
test
ll
Auto
Alarm reset
On
load
test
Bypass
time
delay
Generator
stop delay
4 min
30 s
ΔU 10% / Δf 5%
ΔU 15% / Δf 10%
ΔU 20% / Δf 10%
0
1
2
3
4
5
10
15
20
30
S1 Failure
delay [s] S1 Return
delay [min]
Manual
retransfer
On
Priority
No priority
In-phase
monitor
On
AUTO
!
S1 S2
LOAD
lll
O
ON, fixed light Power supply and communication present
Power supply present, communication
absent between switch and the HMI
OFF No power available for HMI.
S1 and S2 leds
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
4 min
30 s
4
5
10
15
20
30
S1 Return
delay [min]
4 s
0 s
O
OFF
Manual
retransfer
Auto
config
Priority
In-phase
monitor
AUTO
!
LOAD
lll
O
S1 S2
ON, fixed light
defined limits
Undervoltage
Invalid frequency
Unbalance
Overvoltage
Incorrect phase sequence
Phase missing
Generator stop delay ongoing
OFF No voltage
—
2.2 LED functionality in HMI
—
Fig. 2 On left: LEDs in OXB_, delayed transition, I - O - II. On right: LEDs in OXA_, open transition I - II.
I - O - II I - II
Manual
retransfer
Auto
config
Priority
In-phase
monitor
AUTO
!
S1 S2
LOAD
lll
O
Lamp
test
l
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
Generator
stop delay
4 min
30 s
ΔU 20% / Δf 10%
0
1
2
3
4
5
10
15
20
30
S1 Failure
delay [s] S1 Return
delay [min]
O Position
delay
4 s
0 s
O
OFF
Manual
retransfer
Auto
config
Priority
In-phase
monitor
AUTO
!
S1 S2
LOAD
lll
LED functionality is common to every HMI-type.

12
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
I, II and 0 leds
Lamp
test
l
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
O
OFF
Manual
retransfer
Auto
config
Priority
In-phase
monitor
AUTO
!
S1 S2
LOAD
ll
O
l
Lamp
test
l
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
Generator
stop delay
4 min
30 s
0
1
2
3
4
5
10
15
20
30
S1 Failure
delay [s] S1 Return
delay [min]
O Position
delay
4 s
0 s
O
OFF
Manual
retransfer
Auto
config
Priority
In-phase
monitor
AUTO
!
S1 S2
LOAD
ll
O
l
Lamp
test
l
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
4 min
30 s
0
1
2
3
4
5
10
15
20
30
S1 Failure
delay [s] S1 Return
delay [min]
4 s
0 s
O
OFF
Manual
retransfer
On
Priority
No priority
In-phase
monitor
On
AUTO
!
S1 S2
LOAD
ll
O
l
ON, fixed light Switch position is indicated with fixed
light in I, O or II led. Only one can be
illuminated
Indicating running time delay
Load led
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
Generator
stop delay
4 min
30 s
4
5
10
15
20
30
S1 Return
delay [min]
O Position
delay
4 s
0 s
O
OFF
Dropout ΔU / Δf
Manual
retransfer
ΔU 5% / Δf 5%
On
Off
Priority
No priority
Source 1
In-phase
monitor
Off
On
AUTO
!
S1 S2
lll
O
LOAD
ON Supply ok and connected to load
OFF Connected supply to load not ok or load
disconnected (switch in O position)
Auto led
ON, fixed light Switch is in automatic mode
Test on load
Test off load
If blinks simultaneously with Alarm led
'Inhibit transfer' digital input is activated.
Autoconfig completed
Alarm led
ON
Off
load
test
ll
ON
Auto
Alarm reset
On
load
test
Bypass
time
delay
4 min
515 30 4 s
O
OFF
Manual
retransfer
On
Off
Priority
No priority
Source 1
AUTO
S2
!
OFF No alarms
ON, fixed light Handle attached, locked, other alarm
Control Alarm
Auto configuration ongoing
Control Retry
Auto mode off
If blinks simultaneously with Alarm led
'Inhibit transfer' digital input is activated.
If Auto led is fixed light then manual
retransfer is required.
—
Table 2 LED functionality, common to every HMI-type
ll
ON
Auto
Alarm reset
Bypass
time
delay
!
S2
AUTO

13
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
—
2.3 Zenith ZTS(D) T-series features
Feature comparison ZTS(D/CT) controls (Touch screen)
Ampere sizes available
Rated voltage
Rated frequency
Phase system Single and Three
Number of poles
Neutral configuration
Switched Yes
Product type
Open transition (I - II) Yes
Delayed transition (I - O - II or II - O - I) Yes
Closed transition (I - O - II or II - O - I) Yes
Voltage and frequency settings
Time delay settings
Generator stop delay, min
Center-OFF delay, sec

14
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
Feature comparison ZTS(D/CT) controls (Touch screen)
Load shed delay, sec
Source failure detections
No voltage Yes
Undervoltage Yes
Overvoltage Yes
Phase missing Yes
Voltage unbalance Yes
Invalid frequency Yes
Incorrect phase sequence Yes
Features
Controls Touch + keys
Yes
Open transition - Standard digital inputs/outputs
Delayed transition - Standard digital inputs/
outputs
Programmable digital inputs/outputs Yes
Auto config (voltage, frequency, phase system) Yes

15
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
Feature comparison ZTS(D/CT) controls (Touch screen)
Auto config (voltage frequency, phase system) Yes
Source priority
Manual re-transfer Yes
In-phase monitor Yes
Genset exercising: on-load, off-load Yes
In-built power meter module Yes
Load shedding Yes
Real time clock Yes
Event log Yes
Predictive maintenance Yes
Harmonics measuring Voltage, current
Field-mount accessories
Auxiliary contacts for position indication Yes
Digital input/output modules Yes
Yes
Communication modules Yes
Connectivity
Yes
Modbus/TCP Yes
Profibus DP Yes
ProfiNet Yes
DeviceNet Yes
Ethernet IP Yes
Ekip Com Hub (monitoring via ABB Ability™: EDCS) Yes
Enclosures
Yes
For applications
Mains - Mains Yes
Mains - Generator Yes
Contact ABB for applications with smaller than 20 KVA gensets.
—
Table 3 ATS features not limited to what is in the table above

16
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
—
2.4 Operation
Switching sequence / Automatic
Open / Delayed transition
SOURCE 1 Priority (SOURCE 2 = Generator)
The switching sequence can be summarized in the following steps:
1. An anomaly occurs on SOURCE 1
2. Override momentary S1 outage delay
3. Generator start
4. SOURCE 2 OK
5. Transfer from S1 to S2 delay
6. Pre-transfer signal on
7. Load shed signal on
8. Pre-transfer S1 to S2 delay
9. Load shed delay
10. Transfer switch (SOURCE 1) to position O
11. Center-off delay (only with Delayed transition I - O - II type)
12. Transfer switch (SOURCE 2) to position II
13. Post-transfer S1 to S2 delay
14. Pre-transfer signal off
The re-transfer sequency can be summarized in the following steps:
1. SOURCE 1 is restored
2. Transfer from S2 to S1 delay
3. Pre-transfer signal on
4. Pre-transfer S2 to S1 delay
5. Transfer switch (SOURCE 2) to position O
6. Center-off delay (only with Delayed transition I - O - II type)
7. Transfer switch (SOURCE 1) to position I
8. Load shed signal off
9. Generator stop delay
10. Post-transfer S2 to S1 delay
11. Pre-transfer signal off
12. Generator stop
13. SOURCE 2 off

17
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
SOURCE 2 Priority (No generator)
The switching sequence can be summarized in the following steps:
1. An anomaly occurs on SOURCE 2
2. Override momentary S2 outage delay
3. Transfer from S2 to S1 delay
4. Pre-transfer signal on
5. Load shed signal on
6. Pre-transfer S2 to S1 delay
7. Load shed delay
8. Transfer switch (SOURCE 2) to position O
9. Center-off delay (only with Delayed transition I - O - II type)
10. Transfer switch (SOURCE 1) to position I
11. Post-transfer S2 to S1 delay
12. Pre-transfer signal off
And the re-transfer sequence can be summarized in the following steps:
1. SOURCE 2 is restored
2. Transfer from S1 to S2 delay
3. Pre-transfer signal on
4. Pre-transfer S1 to S2 delay
5. Transfer switch (SOURCE 1) to position O
6. Center-off delay (only with Delayed transition I - O - II type)
7. Transfer switch (SOURCE 2) to position I
8. Load shed signal off
9. Post-transfer S1 to S2 delay
10. Pre-transfer signal off

18
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
Closed Transition
SOURCE 1 Priority (SOURCE 2 = Generator)
The switching sequence can be summarized in the following steps:
1. Activate test on load (HMI or digital input)
2. Generator start
3. Run engine warm-up timer
4. Pre-transfer S1 to S2 delay
5. Check source synchronization
6. Close SOURCE 2 contacts
7. Open SOURCE 1 contacts, start ETT timer (parallel mode)
8. Post-transfer S1 to S2 delay
The re-transfer sequence can be summa¬rized in the following steps:
1. Cancel test on load (HMI or digital input)
2. SOURCE 1 availability timer
3. Pre-transfer S2 to S1 delay
4. Check source synchronization
5. Close SOURCE 1 contacts
6. Open SOURCE 2 contacts, start ETT timer (parallel mode)
7. Post-transfer S2 to S1 delay
8. Run engine cool down timer
9. Generator stop
SOURCE 2 Priority (No Generator)
The switching sequence can be summarized in the following steps:
1. Activate test on load (HMI or digital input)
2. Pre-transfer S2 to S1 delay
3. Check source synchronization
4. Close SOURCE 1 contacts
5. Open SOURCE 2 contacts, start ETT timer (parallel mode)
6. Post-transfer S2 to S1 delay
The re-transfer sequence can be summa¬rized in the following steps:
1. Cancel test on load (HMI or digital input)
2. SOURCE 2 availability timer
3. Pre-transfer S1 to S2 delay
4. Check source synchronization
5. Close SOURCE 2 contacts
6. Open SOURCE 1 contacts, start ETT timer (parallel mode)
7. Post-transfer S1 to S2 delay

19
1
OPERATION, MAINTENANCE, AND INSTALLATION GUIDE
—
3.1 Position indication
3.1.1 Position Indication - R5
—
3 Operation of Automatic
Transfer Switch Equipment
—
Fig. 3 View of Automatic Transfer Switch (Standalone) Panel Highlighting Customer Points of Interest.
Applicable for Standard, Delay, and Close Transition Type Automatic Transfer Switch Euipment.
3.1.2 Position Indication - 63L
—
Fig. 4 Source Indicators
Source
Indicators
STEP1
Both UP
Source 1
STEP2
Top DOWN
Bottom UP
Open
STEP 3
Both DOWN
Source 2
Source Indication with
manual operating
direction of handle for
respective source.
Contact position status

20
1
ZENITH ZTS(D) T-SERIES 1600-3000 A & ZTSCT T-SERIES 400-3000 A
—
3.2 Operation of Automatic Transfer Switch Equipment
Danger
Hazardous Voltage May Cause Severe Injury or
Death
Manual opening and closing of the contacts
shall only be performed with no power
available.
Failure to comply with these instructions may
result in death or serious injury.
Warning
Improper Installation Operation and
Maintenance
Ensure only quali_ed personnel install, operate,
service and maintain all electrical equipment.
DISCONNECT all power sources prior to instal-
lation, operation, service, and maintenance of
all electrical equipment. These activities shall
be performed only by certifed ABB Zenith tech-
nicians or qualifed electricians. Only use the
charging handle to perform manual operation
of the transfer switch. No motorized device
shall be used as a substitute.
Failure to comply with these instructions may
result in death or serious injury.
NOTE: Prior to operating the ATS in manual
mode, the HMI settings must be changed from
Automatic transfer mode to Manual transfer
mode (see Section 4.3).
• See Section 3.2.1 for R5 ATS manual
operation procedure
• See Section 3.2.2 for 63L ATS manual
operation procedure
Other manuals for Zenith ZTS T Series
2
Table of contents
Other ABB Industrial Equipment manuals
Popular Industrial Equipment manuals by other brands

Bison
Bison 2502 Series instruction manual

UNITED
UNITED TC250 Operation & maintenance manual

Wallenstein
Wallenstein CT162 Operator's manual

ProMinent
ProMinent CHLORINSITU IIa Series Maintenance instructions

GUIDANCE MARINE
GUIDANCE MARINE Artemis Mk6 FAT Initial setup

Textron
Textron GREENLEE SG4 instruction manual

Siemens
Siemens TELEPERM M AS 235 manual

Bentone
Bentone BF 1 FUV FAME Installation and maintenance instruction

schmersal
schmersal AZM150 operating instructions

SCHUNK
SCHUNK ROTA THW 400 Assembly and operating manual

3M
3M 3M-Matic 800rf Instructions and parts list

TE Connectivity
TE Connectivity HVA HD400 Assembly