
CONNECTION:
⚫Must be installed by a competent person.
⚫Disconnect power source.
⚫Cover or shied any adjacent live components.
⚫Ensure device cannot be switched on.
⚫Check power supply is disconnected.
➢Remove the transparent vinyl cover on the top of the sensor.
➢Loosen the screws in the terminal, and then connect the power to terminal according to wiring
diagram.
➢Install the transparent vinyl cover back onto the sensor.
➢Fold the metal spring of the sensor upwards, until they are in “I”position with sensor, and
then place the sensor into the hole in the ceiling. Release the spring to fix the sensor into
position.
➢Turn on the power and then test the sensor functionality.
➢
STEP1 STEP 2 SSTEP 3
WIRING DIAGRAM:
(See the right image)
SENSOR INFORMATION:
TEST:
➢Turn the TIME knob anti-clockwise to the minimum
(10s). Turn the LUX knob clockwise to the maximum
(sun).
➢Switch on the power; the sensor and its connected
lamp will have no signal at the beginning. After a
30sec warm-up period, the sensor will be operational. If the sensor detects movement, the
load will turn on. When no further movement is detected, the load should switch off within
10sec±3sec.
➢Turn LUX knob anti-clockwise to the minimum (3). If the ambient light is more than 3LUX,
the sensor will switch the load off. If the ambient light is less than 3LUX (darkness), the
sensor will switch on the load. With no occupancy detected, the sensor will stop working
within 10sec±3sec.
Note: when testing in daylight, please turn LUX knob to (SUN) position, otherwise the
sensor may not work!
TROUBLESHOOTING:
➢The load does not switch on:
a. Check the power and the load.
b. Please check if the load is operational.
c. Please check the light level setting.
➢The sensitivity is poor:
a. Please check if the sensor is obstructed from detecting movement.
b. Please check if the ambient temperature is too high.
c. Please check if the movement is in the detection field.
d. Please check if the installation height corresponds to the height required in the
instruction.
➢The sensor does not shut off the load automatically:
a. Please check if there is continual movement in the detection field.
b. Please check if the time delay is set to the maximum duration
c. Please check if the wiring corresponds to the instruction.
Height of installation: 2.2-4m
Detection Distance: Max.6m