Airspan AS4000 Guide

605-0000-454 Draft Issue 1.3 Date 8/02/00
AS4000
Wireless Local Loop System
Subscriber Terminal
Installation and Commissioning

AS4000 Subscriber Terminal
Installation and Commissioning Preface
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 2of 2
This Page Intentionally Blank

AS4000 Subscriber Terminal
Installation and Commissioning Preface
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 3of 3
Notice
1. This manual is subject to revision.
2. All rights reserved.
3. Right of modification reserved.
4. This manual is supplied without liability for errors or omissions.
5. No part of this manual may be reproduced or used except as authorised by contract or
other written permission.
6. This equipment is conditioned by the requirement that no modifications will be made to
the equipment unless the changes or modifications are expressly approved by ACC
Communications
7. Prerequisite skills: Personnel installing, commissioning, and maintaining the Airspan
products must have a basic knowledge of telephony and radio communications, and
have experience in installing, commissioning and maintaining telecommunications
products. ACC provides a range of comprehensive training courses specifically aimed
at providing operators/users of Airspan products with the prerequisite skills to install,
commission and or maintain the product. The courses can be tailored to provide the
level of training required by the operator/user.
8. Airspanand Sitespanare Registered Trademarks of Airspan Communications
Corporation.
For additional information on Airspan Systems, please call your ACC Representative, or
contact ACC at: Cambridge House
Oxford Road
Uxbridge
Middlesex
UB8 1UN
Call (44) 1784 886700

AS4000 Subscriber Terminal
Installation and Commissioning Preface
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 4of 4
This Page Intentionally Blank

AS4000 Subscriber Terminal
Installation and Commissioning Preface
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 5of 5
SAFETY INSTRUCTIONS - WARNINGS AND CAUTIONS
SAFETY
1. Read and follow all warning notices and instructions marked on the product or included in
this manual
2. Do not allow anything to rest on the power cord and do not locate the product where
persons could step or walk on the power cord.
3. When installed in the final configuration, the product must comply with the applicable Safety
Standards and regulatory requirements of the country in which it is installed. If necessary,
consult with the appropriate regulatory agencies and inspection authorities to ensure
compliance.
4. No hazardous RF radiation is emitted from the equipment. Measured at the surface of
the CRU radome, when transmitting, the maximum total power radiated from the CRU is
0.01% of the UK National Radiological Protection Board basic restriction per kg. of body
part.
WARNING - HAZARDOUS VOLTAGES
On AC installations, hazardous voltages exist. Use caution when verifying or working with
AC power. Remove metal jewellery that could come into contact with AC power.
On DC sections, short circuiting the low voltage, low impedance circuits can cause severe
arcing that may result in burns or eye damage. Remove rings, watches etc. to avoid shorting
DC circuits.
Electro-Static Discharge ESD
Electro-Static Discharge. Many circuits contain devices which are susceptible to damage from
high impedance voltage sources. To avoid such risks always follow anti-static procedures
where marked.

AS4000 Subscriber Terminal
Installation and Commissioning Preface
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 6of 6
NOTE
Airspan products do not contain hazardous substances (as defined in UK ‘Control of
Substances Hazardous to Health Regulations 1989’, and the ‘Dangerous Substances
Regulations 1990’). At the end of any Airspan product’s life cycle, the customer should
consult with ACC to ensure that the product is disposed of in conformance with the relevant
regulatory requirements
The Symbol on an Airspan product signifies that it has been certified according to the EMC
directive 89/336/EEC. The product fulfils the requirements according to the following
standards:
EN50082-1 for Immunity.
EN55022 Group 1 Class A for the Central Terminal Emissions.
EN55022 Group 1 Class B for the Subscriber Terminal Emissions.
NOTE
The Subscriber Terminal equipment has been tested and found to comply with the limits for a
Class B digital device, pursuant to part 15 of the FCC Rules.

AS4000 Subscriber Terminal
Installation and Commissioning Preface
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 7of 7
User Response Form
Mail: Airspan Communications Limited Fax: (44) 01895 467182
Oxford Road
Uxbridge
Middlesex
UB8 1UN
Document Rating Excellent Good Average Below Average Poor
Accuracy / Completeness qqqqq
Clarity / Organisation qqqqq
Figures qqqqq
Table of Contents/Index qqqqq
The nature of this response is Addition qDeletion qCorrection q
Please enter details of response below (include precise reference to Section, Page, Paragraph)
Please Complete the following for acknowledgement/response:
Name: ........................................ Address ..........................................
Company ........................................ ..........................................
Job Title ........................................ ..........................................
Department ........................................ ..........................................
Telephone ........................................ ..........................................
Thank you for your co-operation and assistance.

AS4000 Subscriber Terminal
Installation and Commissioning Preface
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 8of 8
This Page Intentionally Blank

AS4000 Subscriber Terminal
Installation and Commissioning ICL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 1of 2 © Copyright Airspan Communications Corporation 2000
ISSUE CONTROL LIST
Title Issue Date Issue Details
Title Page Draft 1.3 February 2000
ICL-001 Draft 1.3 February 2000
IXL-001 Draft 1.3 February 2000
GSI-001 Draft 1.3 February 2000
GSI-002 Draft 1.3 February 2000
GSI-003 Draft 1.3 February 2000
DLP 001 Draft 1.3 February 2000
DLP 002 Draft 1.3 February 2000
DLP 003 Draft 1.3 February 2000
DLP 004 Draft 1.3 February 2000
DLP 005 Draft 1.3 February 2000
DLP 006 Draft 1.3 February 2000
DLP 007 Draft 1.3 February 2000
DLP 008 Draft 1.3 February 2000
DLP 009 Draft 1.3 February 2000
DLP 010 Draft 1.3 February 2000
DLP 011 Draft 1.3 February 2000
DLP 012 Draft 1.3 February 2000
DLP 013 Draft 1.3 February 2000
DLP 014 Draft 1.3 February 2000
DLP 015 Draft 1.3 February 2000
DLP 016 Draft 1.3 February 2000
DLP 017 Draft 1.3 February 2000
DLP 018 Draft 1.3 February 2000

AS4000 Subscriber Terminal
Installation and Commissioning ICL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 2of 2
CHANGE TYPE/DATE PURPOSE PAGES AFFECTED
Draft Issue #, Month
Year
1.2 July 1999 Wall Mounting
Bracket Installation
Procedure Changes
DLP-015
1.3dr February 2000 ST V2 Removed
Modular added
DLPs Removed and
Renumbered

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 1of 10 © Copyright Airspan Communications Corporation 2000
INDEX TASK LIST
PREFACE:
Safety Instructions Warnings and Cautions
User Response Form
ACCESS: ICL, IXL
Issue Control List ................................................................................................ICL-001
Index Task ListIXL-001
SECTION 1 GENERAL SYSTEM INFORMATION: GSI
Introduction.GSI-001
1. General ...................................................................................................................1
2. Fault Reporting.......................................................................................................1
3. Safety......................................................................................................................1
Subscriber Terminal Overview........................................................................... GSI-002
1. Subscriber Terminals...............................................................................................1
2. AS4000 Subscriber Terminals .................................................................................2
3. The Subscriber Terminal – Internal Service Interface Unit .......................................3
3.1 Antenna 4
3.2 Antenna Mounting Pole 4
3.3 Antenna Mounting Bracket 4
3.4 IF Drop Cable 4
3.5 Power Supply Units 5
3.6 AC Power Supply Unit (Type 5) 5
3.7 Type 6 PSU 5
3.8 The R Series Residential Subscriber Terminals 6
3.9 The S Series Sub-Unit Subscriber Terminals 8
3.10 The N Series Subscriber Terminals 10
3.11 The B Series Subscriber Terminals 11
3.12 The L Series Subscriber Terminals 12
3.13 The M Series Subscriber Terminals 13
SpecificationsGSI-003
1. B, L M and N Series Subscriber Terminals ..............................................................1
2. R Series Subscriber Terminals.................................................................................1
3. S Series Subscriber Terminals..................................................................................1
4. Power Supply Unit Type 5 ......................................................................................2
5. Power Supply Unit Type 6 ......................................................................................2
6. Modular Enclosure..................................................................................................2
Required Tools and Equipment GSI-004
1. Required Tools........................................................................................................1
7. Required Equipment................................................................................................1

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 2of 10
Installation Process GSI-005
1. Delivery Inspection .................................................................................................1
2. Unpacking Inspection..............................................................................................1
3. R series Telephony Installation and Commissioning.................................................2
4. S series Telephony Installation and Commissioning..................................................4
4.1 S series Installation Check List. 5
5. B Series Installation and Commissioning..................................................................6
5.1 B Series Installation Check List. 7
6. L Series Installation and Commissioning..................................................................8
6.1 L Series Installation Check List. 9
7. N Series Installation and Commissioning ...............................................................10
8. M Series: Installation and Commissioning.............................................................12
8.1 M series Installation Check List. 13
DETAIL LEVEL PROCEDURES: DLP
SECTION 2 INSTALLING R, S, N, L, B SERIES COMMON COMPONENTS
Preparatory Tasks ..............................................................................................DLP-001
1. Site Readiness.........................................................................................................1
2. Site Selection..........................................................................................................1
3. Power Availability...................................................................................................2
Installing the Antenna (Wall Mount) .................................................................DLP-002
1. Antenna Positioning and Securing. ..........................................................................1
2. Lightning Protection................................................................................................5
Installing The Antenna (Pole Mount).................................................................DLP-003
1. Antenna Positioning and Securing. ..........................................................................1
2. Lightning Protection................................................................................................2
IF drop Cable Installation ..................................................................................DLP-004
1. Drop cable installation.............................................................................................1
2. Drop cable Termination (Type T6)..........................................................................3
3. Drop cable Termination (Type T10)........................................................................4
Installing the Type 5 PSU....................................................................................DLP-005
1. Installing The Type-5 PSU...................................... Error! Bookmark not defined.
1.1 PSU (Type 5) Positioning and Securing 1
1.2 AC Power Cord Installation 3
1.3 PSU earthing 3
1.4 PSU Labelling 4
Section 3: Installing The R series Service Interface Unit...................................DLP-006
Section 4: Installing The SU1/2 Service Interface Unit......................................DLP-007
Section 5 Installing The B, L & N series Service Interface Unit........................DLP-008
Section 6: M Series Installation. .........................................................................DLP-009
Installing The M series Module Enclosure.
External connections to top of Krone Connector 15
Equipment 15

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 3of 10
Block 2 15
Block 2 15
Section 7: Commissioning The R, S, B, L & N Series Systems .........................DLP-010
1. System Turn-up.......................................................................................................1
2. ST Programming Using STMON for Windows........................................................1
2.1 PC Interface 1
2.2 Subscriber Terminal Interfaces 2
2.2.1 STMON Interface for R and S Series Subscriber Terminals 2
2.2.2 STMON Interface for B, L, N, and M ♣series Subscriber Terminals 2
3. Setting Up STMON................................................................................................3
4. Configuring a Subscriber Terminal ..........................................................................4
Panning Subscriber Terminals ...........................................................................DLP-011
1. Panning Pole Mounted Antenna...............................................................................1
2. Panning Bracket Mounted Antenna .........................................................................2
Functional Tests R,S & N series installations.....................................................DLP-012
Functional Tests B series installations................................................................DLP-013
Functional Tests L series installations. ...............................................................DLP-014
1. BER Test the link....................................................................................................1
Test Results..........................................................................................................DLP-015
Airspan Subscriber Terminal Acceptance Form................................................DLP-016
RF Codes for SIUs when using STMON for Windows..................................Appendix 1
Creating a test channel at the Central Terminal............................................Appendix 2
1. Retrieving Channel States........................................................................................1
2. Configuring Test Link Acquisition Channel (TLAC)................................................1
3. Configuring Test Traffic Channel (TTC)..................................................................1
4. Forcing the ST to acquire a link...............................................................................2
5. Returning RW codes to system use:.........................................................................2
BER Testing Appendix 3
1. Setting up the BER Tester.......................................................................................1
1.1 Configuring the DTU card 1
1.2 Placing a loopback at the the ST 2
Programming Subscriber Terminals Using A LAT Terminal Appendix 4
1. Program ST ............................................................ Error! Bookmark not defined.
1.1 Set RW Error! Bookmark not defined.
1.2 Write data into ST: Error! Bookmark not defined.

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 4of 10
List of Figures
Figures Page
GSI-002
Figure 1. Subscriber Terminal 3
Figure 2 Type 6 PSU 6
Figure 3. R Series Demand Assigned Subscriber Terminals 7
Figure 4. The R Series Service Interface Unit (RU-2 shown) 7
Figure 5. S Series Demand Assigned Subscriber Terminals 8
Figure 6. The S Series Service Interface Unit. (SU-2 shown). 9
Figure 7. N Series Demand Assigned Subscriber Terminals 10
Figure 8. The N Series Service Interface Unit. (MU-V4 shown). 10
Figure 9. B Series Demand Assigned Subscriber Terminals 11
Figure 10. The B Series Service Interface Unit. (MU-I shown). 11
Figure 11. L Series Demand Assigned Subscriber Terminals 12
Figure 12. The L Series Service Interface Unit. (MU-D2x64 shown). 12
Figure 13. The M Series Enclosure with Modular Service Interface Units Fitted. 13
DLP-001
Figure 14. Antenna Positioning 2
DLP-002
Figure 15 Antenna Bracket Orientation 2
Figure 16. Antenna Wall Bracket Positioning and Securing 2
Figure 17. Fixed wall mounting bracket 4
Figure 18. Wall Mounted Antenna 5
Figure 19. Lightning Protection for Exposed Bracket Mounted Antenna 6
DLP-003
Figure 20. Antenna Pole-mount Positioning and Securing 2
Figure 21 Lightning Protection for Exposed Pole Mounted Antenna 3
DLP-004
Figure 22. Antenna fixed to mounting bracket 2
Figure 23. Terminating F-Type Connectors to T6 cable 3
Figure 24. Terminating F-Type Connectors to T10 cable 4
DLP-005
Figure 25. PSU Positioning and Securing 2
Figure 26. AC Power Supply Unit (Cover Removed). 2
Figure 27. Customer Logo Placement 4
DLP-006
Figure 28 The R series Service Interface Unit 1
Figure 29. Service Interface Unit Wall Mounting Bracket 2
Figure 30. Service Interface Unit Positioning 2
Figure 31. R Series Service Interface Unit Battery Compartment 3
Figure 32. R2 Rear Panel 4
Figure 33. The R Series Service Interface Unit in the Wall Mount position 5

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 5of 10
DLP-007
Figure 34. S Series Service Interface Unit 1
Figure 35 Service Interface Unit Positioning 2
Figure 36. S Series Service Interface Unit (installed) 3
DLP-008
Figure 37. L Series Service Interface Unit 1
Figure 38. Service Interface Unit Wall Mounting Bracket 2
Figure 39. Service Interface Unit Positioning 3
Figure 40. Enclosure (cut away) Fixed To Wall. 4
Figure 41. Base of Plinth 5
Figure 42. Modular Enclosure with Plinth 6
Figure 43. Fixing the Plinth 7
DLP-010
Figure 44. STMON PC Connection 1
Figure 45. R and S Series RJ45 STMON connections 2
Figure 46. B, L, N, and M series 15 way D-type STMON connections 2
Figure 47. Panning Pole Mount Antenna 2
Figure 48. .Panning Bracket Mount Antenna 3

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 6of 10
List of Tables
Table Page
GSI-002
Table 1. AS4000 Subscriber Terminals 2
GSI-004
Table 2. Required Tools 1
Table 3. Required Equipment. 1
DLP-009
Table 4. External Standby Power Connections 10
Appendix 1
Table 5. RF Codes for SIUs 3

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 7of 10
List of Charts
Chart Page
Chart 1. R series Installation and Commissioning 2
Chart 2. S series Installation and Commissioning 4
Chart 3. B Series Installation and Commissioning 6
Chart 4. L Series Installation and Commissioning 8
Chart 5. N Series Installation and Commissioning 10

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 8of 10
Abbreviations
ADPCM Adaptive Differential Pulse Code Modulation
AC Access Concentrator
AGC Automatic Gain Control
CCC Call Control Channel
CDMA Code Division Multiple Access
CPE Customer Premises Equipment
CRU Customer Radio Unit
CU Compression Unit
CT Central Terminal
CTU Central terminal Tributary Unit (at AC site)
DA Demand assignment
DC Direct Current
DMM Digital Multi Meter
DRS Digital Radio System
DTU Demand Assignment Tributary Unit
FA Fixed Assignment
ISDN Integrated Services Digital Network
ITU-T International Telecommunications Union –Telecommunications
LAC Link Acquisition Channel
LD Loop Disconnect
MF Multi-Frequency
MU Modular Unit (ST)
NTU Network Termination Unit
PC Power Control
PCM Pulse Code Modulation
PSU Power Supply Unit
PTC Priority Traffic Channels
RF Radio Frequency
RU Residential Unit (ST)
SC Shelf Controller
SIU Service Interface Unit
ST Subscriber Terminal
SU Sub Unit (ST)
Rx Receive
Tx Transmit
TDM Time Division Multiple Access
TCH Traffic Channels
TU Tributary Unit
VDU Video Display Unit
VF Voice Frequency
XTU Switch Tributary Unit

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 9of 10
RELATED DOCUMENTATION
605-0000-450 System Overview
605-0000-451 System Operations and Maintenance Manual
605-0000-452 Central Terminal – Installation & Commissioning
605-0000-453 Access Concentrator Installation & Commissioning
605-0000-437 D128 Terminal Converter
605-0000-435 Material Return and Repair
605-0000-427 Sitespan

AS4000 Subscriber Terminal
Installation and Commissioning IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 10 of 10
This Page Intentionally Blank
Other manuals for AS4000
6
Table of contents
Other Airspan Microphone System manuals