
Electric Rim Strike
AL150
01202 676262
01202 680101
Registered in England & Wales 1925337 © April 2018 IEC. All rights reserved. All dimensions are nominal and subject to tolerances
CONVERSION: POWER TO LOCK <=> POWER TO OPEN
Figure 4A
Figure 4B
WARNING:
Do not press on the keeper to release when the spring
screw is not totally secured in position, this will cause
damage to the spring barbell. When changing function,
micro switch will spring out.
The AL150 must be powered up before changing from PTL
to PTO or PTO to PTL as if this is not done it could cause
damage to the micro switch
Procedures to convert Power to Open (Figure 4B) to Power
to Lock (Figure 4A):
Step 1: Remove the two cover plate screws.
Step 2: Remove the lock body from the cover housing.
Step 3: Remove the spring screw from the end part of the
strike body.
Step 4: Remove the Barbell and replace in reverse position
with long part in and short part out.
Step 5: Replace the spring screw.
Step 6: Refit the lock body into the cover housing and
screw in the two cover plate screws.
Procedures to convert Power to Lock (Figure 4A) to Power
to Open (Figure 4B):
Step 1: Remove the two cover plate screws.
Step 2: Remove the lock body from the cover housing.
Step 3: Remove the spring screw from the end part of the
strike body.
Step 4: Remove the Barbell and replace in position with
short part in and long part out.
Step 5: Replace the spring screw.
Step 6: Refit the lock body into the cover housing and
screw in the two cover plate screws.
ELECTRIC STRIKE MAINTENANCE
Maintenance should be carried out every 6
months, or higher for heavy duty door traffic.
Electric strikes should be fitted exactly in
accordance with the Alpro fixing instructions,
ensuring and maintaining all relevant door gaps
and clearances. Under no circumstances use a
spray lubricant, as this type of solvent can
damage electronics. Electrical parts with the strike
need no maintenance.
If required fit a protective diode as close to the
coil as possible to protect the system from
transient peaks.
Ensure on a regular; basis the whole of the door
system is checked (lock case, door closer, strike
plate, handles etc.) to ensure the desired level of
door operation and security is being maintained.
PLEASE NOTE:
The warranty for the strike is void if:
The strike is assembled incorrectly
Parts fitted to the strike which are not approved
Alpro Parts
The strike is incorrectly wired
There is incorrect voltage applied to the strike
Alpro electric strikes should be installed by
suitably qualified engineers