manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. AVZ
  6. •
  7. Accessories
  8. •
  9. AVZ Twins Piazzola User manual

AVZ Twins Piazzola User manual

Twins Piazzola EN 27-08-201827-08-2018
Manufacturing and installation instruction
Twins®Piazzola®
Gastro awning
Twins Piazzola EN 27-08-2018 Page 2
**A T T E N T I O N **
AVZ accepts no liability for any errors in this manual, or for any
damage or losses resulting from the use thereof.
Twins Piazzola EN 27-08-2018 Page 3
General information Twins®Piazzola®Butterfly awning
Maximum width
600 cm (up to projection 500 cm)
NOTE: The aluminium support beam must always be shortened on both sides! Take the welded
sections into account when determining the width.
Total width Twins® Piazzola®
The total system width = projection both awning + 160 mm.
Comments
•Maximum fabric area 30 m² per awning section (acrylic fabric, Tibelly®).
•In case of standard-size fabric, apply a free seam of 10 cm both left and right.
•As the front profile will start to bend at a free span of 4 m, we recommend to use a tensioning
system.
•The fabric will sag slightly at an projection of 3,5 m or more. Use additional beams to support the
fabric.
•When using the Twins Piazzola in the rain (short light shower), we advise beam(s) to support the
fabric, and the use of a lockset. The Twins Piazzola should in that case be placed at a minimum
angle of 17 degrees.
•Eyelets (± 50 mm from the front profile) can be placed in the fabric for better water discharge.
•The height of the legs Twins Piazzola cannot be determined by the cut sizes as these depend on the
standing height, projection, protrusion of the side guide and the inclination angle.
•Fabric winding method: Bottomwise
Foundation
•For system stability, it is necessary to pour concrete dies for the Twins Piazzola legs with a size of 85
cm (length) x 85 cm (width) x 20 cm (height).
•The legs of the Piazzola must be placed on a standard concrete pad (7700 317-068), which must be
poured in to create a die with a size of 35 cm (length) x 35 cm (width) x 20 cm (height).
Height legs Twins
Inclination angle
Twins Piazzola EN 27-08-2018 Page 4
General information Twins®Piazzola®Butterfly awning
Cut sizes (based on the total width of the system)
Piazzola parts
ASA motor control
Somfy motor control
Fabric roller
- 79 mm
- 83 mm
Bottom cover
- 43 mm
Top cover
- 44 mm
Top front profile
- 198 mm
Lower front profile
- 197 mm
Side guide
Projection – 270 mm
Water gutter
Length side guide + 36 mm
Upright
(when using 4217 015) Standing height + length “A “ -10 mm
(when using 4217 145) Standing height + length “A” + length
below ground level
Support beam
- 176 mm
Support beam (fabric support)
- 32 mm
Fabric
- 177 mm
Tensioning system parts
Tensioning wire
Front profile – 160 mm
Cover profile
Front profile – 274 mm
Twins Piazzola components
Leg Twins Piazzola
See notes on next page
Support beam
-20 mm
Cover connector profile
-20 mm
Cover Twins Piazzola
-20 mm
Rubber sealing strip
-20 mm
Motor diagram
Motor 40 Nm apply on both sides.
Reference point
Awning height till reference point
Projection
Length side
guide
Protrusion side guide
max. 1 m
Passage height
Twins Piazzola EN 27-08-2018 Page 5
Assembly instructions Twins®Piazzola®Butterfly awning
Subassembly Piazzola cassette
1. Cut the length material according the cut size table.
2. On the control side, drill a hole of 11 mm in the bottom cover for the motor cable feed. Fit a tulle in
this hole.
3. Around the midpoint of the length drill a hole of 6,5 mm on the drill line in the groove for later
placement of the cover support. Note: No suspension bracket can be placed here.
4. Slide the mounting plate with adjustment socket screws in that same groove. Insert 1 socket screw
through the hole of 6,5 mm and fasten the other one. On both the left and right hand side, slide 2
clamping plates in the groove where the suspension brackets can later be attached. Slide 4 clamping
plates in the groove along the bottom of the profile.
5. Pull the plastic insert strips into the bottom cover.
6. Slide the two splints into the fabric.
Twins Piazzola EN 27-08-2018 Page 6
Assembly instructions Twins®Piazzola®Butterfly awning
7. Wind up the fabric on the fabric roller.
8. Fit the cord pulleys.
9. Place the motor into the control side of the steel tube, and insert the bearing plug on the bearing side.
10. Make 4 windings of cord around the cord disk and ensure that the cord runs neatly. TIP: Apply double-
sided tape in the cord disk before winding the cord. Now the first 4 windings are fixed in place and
will remain so during transport.
11. Assemble the cover supports (bearing side and control side) as shown in the figure.
12. Use screws to fasten both cover support to the bottom cover.
13. Place the cord disks opposite the wheels on the cover supports and fix these into place.
14. Hook the cover support into the bottom cover and place it alongside the socket screw that projects
through the cover.
Twins Piazzola EN 27-08-2018 Page 7
Assembly instructions Twins®Piazzola®Butterfly awning
15. Hook the top cover into the bottom cover and use screws to fasten it to the ends of the cover supports.
16. Use the clamping plates to attach the suspension brackets to the bottom cover
Twins Piazzola EN 27-08-2018 Page 8
Assembly instructions Twins®Piazzola®Butterfly awning
Tensioning system assembly
1. Slide the clamping plate into the groove of the bottom profile with the holes facing the centre of the
profile.
2. Make sure that the sides of the clamping plate and the front profile are flush.
3. Draw the holes and drill holes of 9 mm. Do this on both sides of the front profile.
Attention: Do not drill in the holes of the clamping plate.
4. Using the drilling template, drill holes of 6,5 mm in the groove of the front profile. Maintain a distance
of around 50 cm between the holes. Keep a distance of around 70 cm in the centre of the front profile
and place the central pulley here.
Note: The distance of 70 cm gives the central pulley enough room to move during opening and
closing.
Twins Piazzola EN 27-08-2018 Page 9
Assembly instructions Twins®Piazzola®Butterfly awning
5. Slide the block to the centre of the tailored tensioning wire and screw it into place with the hexagon
screw.
6. Feed the tension wire through the tension wire mounting blocks and the cover profile. Fasten the
tension wire mounting blocks in the clamping plate using M08x25 bolts.
Note: Make sure that the mounting blocks are centred at the bottom of the front profile.
7. Maintain a distance of 2 mm between the mounting block and the cover profile. Fasten the cover
profile through the holes of 6,5 mm.
Twins Piazzola EN 27-08-2018 Page 10
8. Fasten the hexagonal connecting nut with a washer on the threaded side of the tension wire. Use the
anchoring sleeve with wedge set on the other side.
9. Tighten the hexagonal connecting nut (after complete assembly of the system) until the bottom
profile is straight tensioned.
10. Place cover caps on both sides of the tension system and fasten these with M04x25 socket screws.
11. Attach the cord tensioners at 50 cm from the middle on the slanted side of the bottom profile. Note:
Cord tensioners come in left and right versions.
12. Fasten the guide blocks to the bottom profile.
13. Draw the cord through the guide block and roll it up. Lay the cord in the front profile.
Draw the cord through the guide block and roll it up
Twins Piazzola EN 27-08-2018 Page 11
Assembly instructions Twins®Piazzola®Butterfly awning
Subassembly Twins Piazzola
1. Pour a concrete foundation. Minimum dimensions: Length 85 cm, width 85 cm and height 20 cm.
Allow the concrete to cure properly.
2. Drill the holes in the foundation and fix the M16 threaded ends in place (slotted hole width is
18 mm).
3. Cut the length material to the correct size (see the enclosed materials list).
4. You determine the height of the legs. At a projection of 5 m and a minimum angle of 17°, the
upright length is 3,7 m.
5. Make the holes (Ø 11 mm) in the top of the leg as shown in the drawing below.
Attention! If water enters the supports, drill a hole in the bottom of it. This to prevent damage from
frost.
6. Drill holes with a cross-section of 11 mm in the aluminium support beam (see drawing).
Pour concrete foundation
85x85x20 cm
Side top cover support
Twins Piazzola EN 27-08-2018 Page 12
Assembly instructions Twins®Piazzola®Butterfly awning
7. Attach the side plates to the support beam.
8. Attach the legs to the foundations and make sure they are level.
9. Insert the support beam with side plates in the legs and fasten them.
10. Place the strut between the leg and support beam. Draw the holes and drill holes of 9 mm.
11. Fasten the strut with M8 bolts and check that the structure is level.
Twins Piazzola EN 27-08-2018 Page 13
Assembly instructions Twins®Piazzola®Butterfly awning
12. Place the mounting plates over the support beam using the suspension blocks. Divide equally over
the 3 suspension systems and fasten them. Position the outer 2 near the uprights. NOTE: Take the
beams of the support tube into account.
13. Hang the cassettes with the suspension brackets in the mounting plates on the Twins Piazzola®.
Fasten the socket screws on the bottomside.
14. Fasten the cover profile connector to the top of the support beam with self-drilling screws on the
drill line and with screws through the side panel.
15. Hook the top covers (with rubber seal) in the profile connector and screw these against the side
panels.
16. The side guides are supported by two legs with a base plate connected to a hinge.
Twins Piazzola EN 27-08-2018 Page 14
Assembly instructions Twins®Piazzola®Butterfly awning
17. Drill two holes into the leg as shown in the figure.
18. Use a machine tap M8 to tap a thread in the leg and beam. Provide sufficient lubrication. Minimum
tap 25 mm.
19. Screw the M8x50 adjustments socket screws into both sides of the beam. Allow these to protrude by
± 15 mm. Insert the adjustment socket screws through the holes in the leg and fasten them.
20. Screw the bottom hinge at the top of the leg and the base plate at the bottom.
6x Tap M08 thread
Twins Piazzola EN 27-08-2018 Page 15
Assembly instructions Twins®Piazzola®Butterfly awning
21. The legs of the Piazzola must be placed on a standard concrete die (7700 317-068), which must be
poured in to create a die with a size of 35 cm (length) x 35 cm (width) x 20 cm (height). Attach the
steel base plate, which is later fastened to the concrete die, to the bottom of the leg.
22. Use the Piazzola drilling template or the sizes below to drill holes of 7 mm in the left and right side
guides for attachment to the cover supports.
23. Slide the mounting plate of the fabric support into the side guide, place it in the required position,
and use it to fasten the support.
24. Slide the mounting plate of the top hinge into the side guide. Fasten the top hinge at the required
position of the side guide. Leave space for the nut on the outside.
25. Slide the guide plate into the top of the side guide. Use a rubber hammer to fasten.
Note: The lockset can now be assembled if used (see point 47).
7700 317-068 Standard concrete die
Poured concrete 35x35x20 cm
Twins Piazzola EN 27-08-2018 Page 16
Assembly instructions Twins®Piazzola®Butterfly awning
26. Take the water gutter profiles and drill holes of 5 mm at intervals of ± 60 cm along the drill line.
27. Screw a cover plate against the front of the water gutter.
28. Hook the water gutter profiles into the side guide, keeping the cover plate on the front flush with the
front of the side guide, and screw into place.
29. Extract the front profile by 30 cm.
30. Slide the side guide over the wheels of the guide blocks leg of the cover support.
31. Attach the side guide to the legs of the cover supports.
32. Place the two hinges at the desired positions above one another, and connect these.
33. Measure the Twins Piazzola® diagonally and ensure that the system is perfectly perpendicular.
34. Tighten the nuts on the side of the suspension bracket.
35. Hook the springs on the left and right into the screw eyes of the guide blocks.
36. Place the pulley on the other side of the spring.
Twins Piazzola EN 27-08-2018 Page 17
Assembly instructions Twins®Piazzola®Butterfly awning
37. Slide the central pulley towards the middle of the bottom profile.
38. Pull out the cord leading through the guide block, lead it through the side guide and lay it over the
wheel of the end bearing. Ensure that the cord is not crossed in the side guide.
39. Lead the cord through the bottom front profile as shown in the figure below.
40. Check that the cord runs neatly over all the pulley wheels. Tension the spring by pulling the cord in
the cord tensioners and position the cord around the wheel behind the cord tensioner.
Note: Every spring may be drawn to a maximum of 60% of its own length.
41. Fasten the cord using the enclosed wheels and self-drilling screws, as shown in the figure below.
42. Let the awning run in and out a couple of times to check the correct functioning.
43. Straighten the top cover by turning the socket head screw at the back of the bottom cover.
44. Hook the cover into the top of the front profile and click to fasten.
45. Use the hexagonal nut to tension the front profile.
Pull the cord through the guide block and roll it
500 mm from the middle
Never extend the springs more than 60% of their own length
Middle of front profile
Fasten the cord using encl. wheels and self-drilling screws
Twins Piazzola EN 27-08-2018 Page 18
Assembly instructions Twins®Piazzola®Butterfly awning
46. The lockset can be used with an ASA ETR-A or Somfy Orea motor. The locking block must be placed
at least 110 mm from the end of the side guide. Note: No top hinge can be placed here. The plastic
stopper is screwed to the front profile as shown below.
Twins Piazzola EN 27-08-2018 Page 19
Exploded view: Twins®Piazzola®Butterfly awning (page 1/2)
Twins Piazzola EN 27-08-2018 Page 20
Appendix: Twins®Piazzola®Butterfly awning (page 2/2)
Piece
Nbr.
Item nbr.
Description Twins Piazzola®
Remark
1-3
1
4216 140-000
Support beam Twins Piazzola
4
4
6295 820-000
Support for support beam
5
2
4216 203-000
Leg Twins Piazzola with base
6
2
4216 090-068
Sealing cap for support beam
7
1
6295 810-910
Alu roof connector profile
8
2
4216 122-000
Side plates Twins Piazzola
9
8
4210 527-000
RVS DIN985 + PVC ring M08
10
24
4210 529-000
RVS DIN125A Washer M08
11
6
4211 772-000
Mounting plate
12
12
4217 300-000
Mounting bracket mounting plate
13
24
4210 147-000
RVS 125A Washer M12
14
12
4216 108-000
RVS DIN931 M12x90
15
12
4210 148-000
RVS DIN934 Hexagon nut M12
16
2
6295 800-006
Cover Twins Piazzola
17
8
4210 142-000
RVS DIN7982 ST4,2x45
18
8
4216 107-000
RVS DIN7991 M10x50
19
20
4210 482-000
RVS DIN125A Washer M08
20
16
4210 155-000
RVS DIN985 + Synth. ring M08
21
4
4216 106-000
RVS DIN931 M10x50
22
4
4210 530-000
RVS DIN604 M08x60
23
2
4210 480-000
RVS DIN7991 M10x20
24
4
4210 914-000
RVS DIN931 M8x55
25
2
4216 105-000
RVS DIN912 M8x70
26
2
4216 215-000
Strut

Other AVZ Accessories manuals

AVZ Picca User manual

AVZ

AVZ Picca User manual

AVZ Solidare verso User manual

AVZ

AVZ Solidare verso User manual

Popular Accessories manuals by other brands

Boss Aluminium RT1 installation guide

Boss Aluminium

Boss Aluminium RT1 installation guide

Nexmosphere X-EYE product manual

Nexmosphere

Nexmosphere X-EYE product manual

Motorola sd4581 Features

Motorola

Motorola sd4581 Features

Onstate Technologies PMSW27 Series quick start guide

Onstate Technologies

Onstate Technologies PMSW27 Series quick start guide

Mitsubishi Electric PZ-70CSB-E Installation and instruction manual

Mitsubishi Electric

Mitsubishi Electric PZ-70CSB-E Installation and instruction manual

Crosby LoadConnect Base Station Network manual

Crosby

Crosby LoadConnect Base Station Network manual

wattio MOTION manual

wattio

wattio MOTION manual

Johnson Controls NS8000 Series installation instructions

Johnson Controls

Johnson Controls NS8000 Series installation instructions

Leuze GSU12 manual

Leuze

Leuze GSU12 manual

SMC Networks SMCDW30-Z quick start guide

SMC Networks

SMC Networks SMCDW30-Z quick start guide

Magnescale DK110NLR5 instruction manual

Magnescale

Magnescale DK110NLR5 instruction manual

Koolatron LENTEK Sila IO-41 Instruction guide

Koolatron

Koolatron LENTEK Sila IO-41 Instruction guide

Noise NoiseKen 18-00048B instruction manual

Noise

Noise NoiseKen 18-00048B instruction manual

WATTECO Modbus Class A 50-70-080 quick start guide

WATTECO

WATTECO Modbus Class A 50-70-080 quick start guide

Fresh 'N Rebel 2PB3000 quick start guide

Fresh 'N Rebel

Fresh 'N Rebel 2PB3000 quick start guide

CAME STRAUSS LIGHT KLT manual

CAME

CAME STRAUSS LIGHT KLT manual

berlinger Fridge-tag 2 L user manual

berlinger

berlinger Fridge-tag 2 L user manual

August LP106 user manual

August

August LP106 user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.