
-3-
3. CHAIR SECTION PREPARATION FOR INSTALLATIONS
3-1. CHAIR SECTION UNPACKING
The chair is delivered 2 cartons (base section and top section cartons).
Open the upper section carton and check the contents with following check list.
Do not use sharp instrument, it may damage upholstery.
Do not install on wet oor.
Check List for Upper Section Carton
1. Headrest Assembly --------------------------------------------------------------------------------------------- 1 set
2. Backrest Assembly---------------------------------------------------------------------------------------------- 1 set
(Backrest Cushion with Backrest Support Plate, Backrest Cover)
3. Seat Assembly --------------------------------------------------------------------------------------------------- 1 set
4. Armrest (Standard Type; Left Side only) -------------------------------------------------------------------- 1 set
5. Screw Kit
(1) M6 Wood Screw for Fixing Base (2 x L40, 2 x L55)--------------------------------------------------- 4 pcs.
(2) M12 x 20 Set Screw for Base Level Adjustment-------------------------------------------------------- 4 pcs.
(3) M10 x 30 Set Screw for Level Adjustment Adapter ---------------------------------------------------- 4 pcs.
(4) M6 Screw, Flat washer and Armrest Collar for Armrest ----------------------------------------------- 1 set
(5) M6 x 20 Screw for Fixing Backrest Cushion and Seat-------------------------------------------------- 6 pcs.
(6) M6 Flat Washer for Fixing Seat --------------------------------------------------------------------------- 2 pcs.
(7) M8 x 20 Cap Bolt with Spring Washer for Back Support Plate--------------------------------------- 4 pcs.
(8) M5 x 12 Screw (White) for Flange Hose Cover and Pump Cover------------------------------------ 5 pcs.
(9) Hole Plug for Carriage Bar Hole -------------------------------------------------------------------------- 2pcs.
(10) Nylon Clamp with M5 Screw for Fixing Drain Hose -------------------------------------------------- 1 set
(11) M5 x 15 Screw , Set Cap Washer and Set Cap Cover for Pump Cover ------------------------------ 1 set
3-2. CHAIR SECTION PREPARATIONS FOR INSTALLATIONS
Do not connect in the power supply line before
removing Red tagged bolt.
(1) Remove all the staples xing the carton to the pallet,
or cut the carton just above the stapled line, and
remove the carton. (Fig.3-1)
(2) Place the base section with pallet behind the
planned location for chair.
(3) Remove the pump cover.
Remove wood screws from the base.
Remove the base section from the pallet by holding the
carriage bars (Front side and Rear side) and place it
at the planned location. (Fig.3-2)
Fig.3-1 Chair Base Section Carton
Fig.3-2 Removing Base Section from Pallet
Mats
Mats
Pump Cover
Pallet
Wood
Screw
Wood
Screw
Wood
Screw
Rear Side
Carriage Bar
Front Side
Carriage Bar