Attach a 1/2 EMT Screw Connector to each end of the conduit as shown
in FIGURE 1. Slide the conduit-connector assembly onto the electrical
bo es as shown in FIGURE 2. DO NOT FULLY TIGHTEN AT THIS
TIME.
STEP 1
FIGURE 1
FIGURE 2
Chicago Power Channel
Assembly Instructions
CUSTOMER PURCHASED HARDWARE LIST
(QUANTITIES TO BE DETERMINE BY INSTALLER)
4 4 1 9/16 Deep Electrical Bo es
Conduit Appro imately 6 5/8 Long
1/2 EMT Screw Connectors
Combination Coupling EMT to Fle Size 1/2 to 1/2
Conduit Appro imately 19 3/4 Long
1/2 Fle Tubing
4 9/16 Deep Decorator Plates
Decorator Duple Receptacles
Conduit Hangers
MODELS:
MCH-P48C
MCH-P72C
MCH-P96C
MCH-P120C
MCH-P144C
6 5/8 CONDUIT
1/2 EMT SCREW
CONNECTORS
MAKE SURE CONNECTOR SCREWS
FACE THE FLOOR WHEN UNIT IS
ATTACHED TO CHANNEL
NOTE: Remove belly pan by grasping one side and applying pressure outward and downward.