
Substation
Substation
partsremoved
forclarity
Wall
monument
Infeed
Infeed
openend
Junction
Box
The open end of the Infeed is
to be installed by a certified
electrician.
STEP 4
Connecttheopenendofthe Infeed to the WallMonument Power(this has to be in-
stalled by a certified electrician).Plugtheotherend of Infeed to JunctionBox(Fig. 4).
Reassemble metal visual blockers and other components. Replace Lid.
Fig.4
Note:
Part#031-6467
Rev.07.15.03 IM
Bretford Bretford Ltd.
11000 Seymour Avenue Technology House
Franklin Park, IL 60131 7 Lake End Court, Taplow
TEL: 847.678.2545 Bucks SL6 0JQ England
800.521.9614 TEL: 01628 603558
FAX: 847.678.0852 FAX: 01628 604923
800.343.1779
www.bretford.com