
Determinethe exactfloorlocation,theorientation oftheovalcutoutand thecenterof
theSubstation whichthepowerpolewill mountonto.PositionSubstationand mark
floor.Useaplumb lineto locatethe centerandthedirectionof ovalcutout onthe ceiling
requiredto allowthe powerpole topassthroughtheceiling. Markcenter andhigh
pointsof ovalcutouton theceiling.
Positionthe ovalescutcheon ringusing themarksontheceiling andassuring theoval is
orientatedcorrectly tomatchtheovalin theSupport.Tracethe insideovalandmarkmount-
inghole locations.Cut ovalshape alonglinewithcuttingblade positionedoutside theline.
Drill4 holesfor recommended 1/4”dia. expansionbolts. Boltspass thruor fasten
into(drywall).
STEP 3
STEP 4
Fig. 3
STEP 5
TopCover
Power Pole
EscutcheonRing
Slideoval EscutcheonRingandTopCoverover powerpole (Fig.3).
Substation
end.