
Determinethe exactfloor location,theorientation ofthe ovalcutoutand thecenter of
theSupport which thepower polewillmount onto.Position Supportandmark floor.
Usea plumb lineto locatethecenter andthedirection ofovalcutout ontheceiling
requiredto allow thepower poletopass throughtheceiling. Markcenterand high
pointsof ovalcutout onthe ceiling.
Positionthe oval escutcheonring usingthemarks ontheceiling andassuringthe ovalis
orientatedcorrectly tomatch theovalin theSupport. Tracethe insideoval andmarkmount-
inghole locations. Cutoval shapealongline withcuttingblade positionedoutsidethe line.
Drill4 holes for recommended1/4”dia. expansion bolts.Boltspass thru orfasten
into(drywall).
STEP 3
STEP 4
Fig. 3
STEP 5
TopCover
Power Pole
EscutcheonRing
Slideoval Escutcheon Ring andTopCover overpowerpole (Fig. 3).
Support
end.