NA 15.15 B EN - 10
16 - COMMISSIONING
- You can now restart the equipment and check its smooth running.
- Check the safety devices.
It is recommended to fill the operating report (table below) of the equipment, indicating serial number and all other required data,
printed on the manufacturer plate. It will help controlling the performances of the installation and preventing failures.
Maintenance
Before carrying out any maintenance work on the unit,
disconnect it from the power supply. For units fitted with orange
terminals, open all the orange switching terminals and switch
off the 2 circuit breakers.
Maintenance work on compressor
The compressor is fixed to the platform by 4 screws diameter
8 mm.
Attention: when tightening these screws, the maximum torque
to be applied is 13 Nm.
If you do not have a torque wrench, tighten the screws until
you feel a certain resistance, and then tighten a further
threequarters
of a turn.
Advice
Make operating reports and checks as set out in the table
(above) at least once a year.
To ensure correct operation of the unit and benefit from the
guarantee: take out a maintenance contract with your
installer, or with an approved maintenance company.
Make a visual and auditory check of the whole installation in
operation.
Check that there are no traces of oil around the unit
Specificities and mandatory checks relating to the use of
refrigerant fluid
In accordance with Regulation (EC) No. 842/2006 on
certain greenhouse gases.
R410A refrigerant fluid is a gas that has the following impact
on the environment:
1/ No impact on the ozone layer: ODP
(Ozone Depletion Potential) = 0.
2/ Impact on the greenhouse effect: GWP
(Global Warming Potential) = 1720.
- Users must have systems containing over 3 kg of refrigerant
periodically checked for leaks by qualified personnel.
Regardless of the refrigerant charge in your system, CIAT
demands that this check be carried out in order to keep your
system in good working order.
- Users of any system containing over 3 kg of refrigerant
are required to keep a log of the quantities and types of
refrigerants used, added or recovered, and to include the
dates and results of leak tests, the name of the technician
and of the technician’s company. CIAT strongly recommends
keeping such a log even if the refrigerant load of your system
does not require one.
- A leak test must be carried out one month following any leak
repairs.
- It is the duty of operators to collect used refrigerant and to
have it recycled, regenerated or destroyed.
Compulsory annual inspection
Detection of leaks on the cooling circuit.
Battery cleaning:
- Remove the cover of the unit (see « Electrical connections «
procedure chapter).
- Carefully clean the battery and the ventilation compartment
with a vacuum cleaner.
- Put the cover back in place.
Clean the drain pan of the unit.
Date / Time
Operating report
CONDENCIAT CL2
Commissioning date :
Serial number :
Installer :
Installation place :
Model : 283550
65 75
Compressor
Suction pressure
bars
Suction temperature
°C
Condensing pressure
bars
Condensing temperature
°C
Air condenser
Gas inlet temperature
°C
Liquid outlet temperature
°C
Air inlet temperature
°C
Air outlet temperature
°C
Nominal voltage
V
Voltage at terminals
V
Current absorbed by motors
A
Mechanical inspection : tubes, fastenings,...
Electrical connections tightness control
Battery cleaning
Check of control functions
17 -
MAINTENANCE