3. The three-way Solenoid Control applies or relieves pressure in the
cover chamber of the Auxiliary Hytrol Valve (4) in the control piping.
The following action takes place:
4. When the Solenoid allows the main valve to open, the CRD
Pressure Reducing Controls (3) is in command of Hytrol Main Valve.
5. Open the upstream gate or block valve just slightly to allow the valve
assembly and control system to fill with liquid.
6. Carefully loosen tube fittings at highest points and bleed air from the
system. Loosen the vent valve at the top of the main valve cover. If an
X-101 Valve Position Indicator is installed, carefully loosen the vent
valve at top of the Indicator. Bleed air from the cover and tighten plug
or bleed screw. Tighten tube fittings.
7. Open fully the upstream gate or block valve carefully.
8. Slowly open the downstream gate or block valve. Flow should occur
and discharge pressure should increase to the set point of the CRD
Control and remain constant.
9. Adjust the CRD Control to desired outlet pressure. To change pres-
sure setting, turn the adjusting screw clockwise to increase pressure,
counter-clockwise to decrease pressure. There should be flow through
valve during outlet pressure adjustments. When the desired setting
has been made, tighten jam nut and replace cover.
10.To check the operation of the valve, open and close the downstream
gate valve. The downstream pressure should remain constant.
11. If opening and closing speed controls (C or S) are installed in the
valve pilot system, fine tune the opening and closing speed of the main
valve while performing step 10. Turn the adjustment stem on the clos-
ing speed control “C” clockwise to make the main valve close slower.
Turn the adjusting stem on the opening speed control “S” clockwise to
make the main valve open slower. When adjustments have been com-
pleted, tighten the jam nuts.
12. To check the operation of the solenoid shutoff feature, alternately
energize and de-energize the solenoid to open and close the main
valve. The main valve should alternately close drip tight and open to
set point of the CRD. The optional manual operator on solenoids over-
rides operation by shifting it to the energized position when small red
knob is fully turned clockwise. By turning small red knob counter-
clockwise fully normal solenoid operation is restored.
MAINTENANCE
1. Cla-Val Valves and Controls require no lubrication or packing and a
minimum of maintenance. However, a periodic inspection schedule
should be established to determine how the fluid handled is affecting
the efficiency of the valve assembly. Minimum of once per year
2. Repair and maintenance procedures of the Cla-Val Hytrol Main
Valve and pilot control components are included in a more detailed
IOM manual. It can be downloaded from our web site (www.cla-
val.com) or obtained by contacting a Cla-Val Regional Sales Office.
3. When ordering parts always refer to the catalog number and stock
number on the valve nameplate.
MODEL
INSTALLATION / OPERATION / MAINTENANCE
93-01/693-01
Pressure Reducing & Solenoid Shutoff Valve
INTRODUCTION
The Cla-Val Model 93-01/693-01 is an automatic valve designed to
reduce a higher inlet pressure to a steady lower downstream pressure
regardless of changing flow rate and/or varying inlet pressure. It is a
hydraulically operated, pilot controlled, diaphragm type globe or angle
valve.
When downstream pressure exceeds the pressure setting of the con-
trol pilot the main valve and pilot valve close drip tight. The control sys-
tem is very sensitive to slight pressure changes and immediately con-
trols the main valve to maintain the desired downstream pressure.
Pressure setting adjustment is made with a single adjusting screw that
has a protective cap to discourage tampering. A solenoid control is pro-
vided to intercept the operation of the pressure reducing control to
close or open the main valve.
INSTALLATION
1. Allow sufficient room around the valve assembly to make adjust-
ments and for disassembly.
2. It is recommended that either a gate or block valve be installed
upstream and downstream of the 93-01/693-01 Valve to facilitate iso-
lating the valve for maintenance.
NOTE: BEFORE THE VALVE IS INSTALLED, PIPE LINES SHOULD
BE FLUSHED OF ALL CHIPS, SCALE AND FOREIGN MATTER.
3. Place the valve assembly in the line with flow through the valve in
the direction indicated on the inlet nameplate or by flow arrows. Check
all fittings and hardware for proper makeup and that no apparent dam-
age is evident. Be sure main valve cover nuts/bolts are tight.
Pressure in some applications can be very high so be thorough in
checking and inspecting for proper installation and makeup.
4. Cla-Val Valves operate with maximum efficiency when mounted in hori-
zontal piping with the cover UP; however, other positions are accept-
able. Due to size and weight of cover and internal components of six
inch valves and larger, installation with the cover up is advisable. This
makes periodic inspection of internal parts readily accessible.
5. Caution must be taken in the installation of this valve to insure
that galvanic and/or electrolytic action does not take place. The
proper use of dielectric fittings and gaskets are required in all sys-
tems using dissimilar metals.
6. Comply with local and national electrical codes when wiring the
Solenoid Control (5).
OPERATION AND START-UP
1. Prior to pressurizing the valve assembly make sure the necessary
gauges to measure pressure in the system are installed as required by
the system engineer. A Cla-Val Model X101Valve Position Indicator may
be installed in the center cover port to provide a visual indication
of the valve stem during start-up.
CAUTION: During start-up and test procedures a large volume
of water may be discharged downstream. Check that the downstream
venting is adequate to prevent damage to personnel and equipment. All
adjustments in pressure should be made slowly while under flowing
conditions. If the main valve closes too fast it may cause surging in
upstream piping.
2. If isolation valves (B) are installed in pilot system, open these valves
(see schematic).
POSITION
ENERGIZED
DE-ENERGIZED
PORT FLOW
1 TO 2
1 TO 3
ENERGIZED TO OPEN
CLA-VAL 93-01
AUXILIARY (4) AND
MAIN VALVE (1)
OPEN RELIEVES
COVER PRESSURE
CLOSED APPLIES
COVER PRESSURE
DE-ENERGIZED TO OPEN
CLA-VAL 93-01
AUXILIARY (4) AND
MAIN VALVE (1)
CLOSED APPLIES
COVER PRESSURE
OPEN RELIEVES
COVER PRESSURE
SOLENOID CONTROL (5)
CLA-VAL
Copyright Cla-Val 2008 Printed in USA Specifications subject to change without notice.
P.O. Box 1325 •Newport Beach, CA 92659-0325 •Phone: 949-722-4800 •Fax: 949-548-5441 •E-mail: [email protected] •Website cla-val.com
©
N-93-01/693-01 (R-9/08)
H
3
5
2
D1
Y
B
S
C
4
B
A1
D2 B
D3
INLET OUTLET
SOLENOID DRAIN
TO ATMOSPHERE
CS3
3
1
2
BASIC COMPONENTS
1 100-01 Hytrol (Main Valve)
100-20 600 Series Hytrol (Main Valve)
2 X58C Restriction Tube Fitting
3 CRD Pressure Reducing Control
4 100-01 Hytrol - Rev. Flow
5 CS3 Solenoid Control
OPTIONAL FEATURES
A X46A Flow Clean Strainer
B CK2 (Isolation Valves)
C CV Flow Control - Closing
D Check Valves with Isolation Valve
H Solenoid Drain to Atmosphere
S Opening Speed Control
Y X43 “Y” Strainer
For a more detailed IOM Manual go to www.cla-val.com or contact a Cla-Val Regional Sales Office.
CRD93-01/693-01 SCHEMATIC
COVER
PIPE PLUG
COVER BEARING
SPRING
STEM NUT
DIAPHRAGM WASHER
DISC RETAINER
BODY
*
SPACER WASHERS
DISC GUIDE
SEAT
PIPE PLUG
STEM
SEAT O-RING
STUD
8" and Larger
*DIAPHRAGM
*DISC
*Repair Parts
Seat Screw
8" and Larger
(Globe
or
Angle)
PIPE PLUG
HEX NUT
8" and Larger
Cover Bolt
6" and Smaller
CRD
X58C
CS3
X46A
CK2
CV
HYTROL MAIN VALVE
inlet
Cover vent
(3/8" NPT)
Cap
Adjusting Screw
Jam Nut
Cover
Spring
Hex Nut
Belleville Washer
Diaphragm Washer
Diaphragm*
Yoke
Body and Seat Assy
Disc Retainer Assy
Gasket*
Plug, Body
*Machine Screw
(Fil.Hd) 8 Req'd
Spring Guide
Pressure Setting
Adjusting Screw
(Turn Clockwise to
Increase Setting)
2.
3.
1.
3.
5.
A.
B.
C.
SYMPTOM PROBABLE CAUSE REMEDY
Main Valve
Fails to
Open
Main Valve
Fails to
Close
Fails to
Regulate
Solenoid
Valve
will not
Operate
No pressure at valve inlet
Main valve diaphragm assembly inoperative
Pressure Reducing Control (CRD) not opening:
1. No spring compression
2. Damaged spring
3. Spring guide not in place
4. Yoke dragging on inlet nozzle
Flow Control (CV) disc inoperative,
corrosion or excessive scale buildup on stem
Foreign matter between disc and seat or worn
disc. Scale on stem
Diaphragm damaged
X46 Flow Clean Strainer plugged, or
X43 “Y” Strainer plugged
CK2 (isolation valves) closed
Pressure Reducing Control (CRD)
remains open:
1. High spring compression
2. Damaged spring
3. Spring guide not in place
4. Yoke dragging on inlet nozzle
5. Diaphragm damaged or loose diaphragm
nut. Leakage from vent hole in cover
6. Worn or damaged disc retainer assembly
Air in main valve cover and/or tubing
Pressure Reducing Control (CRD)
yoke dragging on inlet nozzle
Pressure Reducing Control (CRD) spring
not in correct range to control
Solenoid voltage
Burned out solenoid coil
Check inlet pressure Disassemble,
clean and polish stem, disc guide,
replace defective parts
1. Tighten adjusting screw
2. Disassemble and replace
3. Assemble properly
4. Assemble properly
Disassemble, clean and polish stem,
Replace worn parts
Disassemble main valve
remove foreign matter, clean or
replace damaged parts
Remove and clean or replace
units
Open isolation valves
1. Back off adjusting screw
2. Disassemble and remove
obstruction
3. Disassemble and replace
4. Assemble properly
5. Disassemble, replace diaphragm
and/or tighten nut
6. Remove and replace
Loosen top cover plug and/or
tubing fining and bleed air
Assemble properly
Check outlet pressure require-
ments and compare existing spring
with chart
Check voltage across coil leads
must be minimum of 85% of
nameplate rating
Check for open circuit coil
Replace coil
SOLENOID SYMPTOMS
CRD adjust range (psi) Spring Color psi change per turn*
2 - 30 Stainless Steel 3
15 - 75 Red 9
30 - 300
* approximate. Use gauge at valve outlet to set
Green 27
X140-1
Security Cap
Option

Other manuals for 93-01

1

This manual suits for next models

1

Other CLA-VAL Control Unit manuals

CLA-VAL 600 Series Owner's manual

CLA-VAL

CLA-VAL 600 Series Owner's manual

CLA-VAL 750B-4KG1 Owner's manual

CLA-VAL

CLA-VAL 750B-4KG1 Owner's manual

CLA-VAL 60-73 User manual

CLA-VAL

CLA-VAL 60-73 User manual

CLA-VAL 81-01 Owner's manual

CLA-VAL

CLA-VAL 81-01 Owner's manual

CLA-VAL 136-AU User manual

CLA-VAL

CLA-VAL 136-AU User manual

CLA-VAL 590-01 Owner's manual

CLA-VAL

CLA-VAL 590-01 Owner's manual

CLA-VAL 55L-60 Owner's manual

CLA-VAL

CLA-VAL 55L-60 Owner's manual

CLA-VAL 60-73 User manual

CLA-VAL

CLA-VAL 60-73 User manual

CLA-VAL 50-49 Instruction manual

CLA-VAL

CLA-VAL 50-49 Instruction manual

CLA-VAL 92-01 Owner's manual

CLA-VAL

CLA-VAL 92-01 Owner's manual

CLA-VAL CRL-60 Owner's manual

CLA-VAL

CLA-VAL CRL-60 Owner's manual

CLA-VAL 34AR Series User manual

CLA-VAL

CLA-VAL 34AR Series User manual

CLA-VAL 92-07 Owner's manual

CLA-VAL

CLA-VAL 92-07 Owner's manual

CLA-VAL 340-07 General instructions

CLA-VAL

CLA-VAL 340-07 General instructions

CLA-VAL CRL Installation and operating instructions

CLA-VAL

CLA-VAL CRL Installation and operating instructions

CLA-VAL 49-01 Installation and operating instructions

CLA-VAL

CLA-VAL 49-01 Installation and operating instructions

CLA-VAL 98-06 Instruction manual

CLA-VAL

CLA-VAL 98-06 Instruction manual

CLA-VAL 90-21 UL Instruction manual

CLA-VAL

CLA-VAL 90-21 UL Instruction manual

CLA-VAL CPC 138-01 Guide

CLA-VAL

CLA-VAL CPC 138-01 Guide

CLA-VAL 50B-4KG1 Installation and operating instructions

CLA-VAL

CLA-VAL 50B-4KG1 Installation and operating instructions

CLA-VAL 131-01 General instructions

CLA-VAL

CLA-VAL 131-01 General instructions

CLA-VAL 90-21 Owner's manual

CLA-VAL

CLA-VAL 90-21 Owner's manual

CLA-VAL 50-20 Instruction manual

CLA-VAL

CLA-VAL 50-20 Instruction manual

CLA-VAL 50B-5KG Installation and operating instructions

CLA-VAL

CLA-VAL 50B-5KG Installation and operating instructions

Popular Control Unit manuals by other brands

Phason Plus Touch Series manual

Phason

Phason Plus Touch Series manual

G&D U2+R Installation and operations

G&D

G&D U2+R Installation and operations

Bray FlowTek F15 Series Installation, operation and maintenance manual

Bray

Bray FlowTek F15 Series Installation, operation and maintenance manual

Numatics G2-2 Series Quick start manual

Numatics

Numatics G2-2 Series Quick start manual

Lutron Electronics AuroRA ARMC-5T Installation Instructions for Replacement

Lutron Electronics

Lutron Electronics AuroRA ARMC-5T Installation Instructions for Replacement

BACHMANN EUROPE Plc E-Z Command operating instructions

BACHMANN EUROPE Plc

BACHMANN EUROPE Plc E-Z Command operating instructions

Emerson Tartarini BM5 Series instruction manual

Emerson

Emerson Tartarini BM5 Series instruction manual

Audioplex VCMute installation manual

Audioplex

Audioplex VCMute installation manual

WAGO SPEEDWAY 767 Series manual

WAGO

WAGO SPEEDWAY 767 Series manual

Asco 290 Series Installation and maintenance instructions

Asco

Asco 290 Series Installation and maintenance instructions

Danfoss EKF Series installation guide

Danfoss

Danfoss EKF Series installation guide

Wey Sistag Sluice gate valve 3 instruction manual

Wey

Wey Sistag Sluice gate valve 3 instruction manual

National Instruments NI 9476E Operating instructions and specifications

National Instruments

National Instruments NI 9476E Operating instructions and specifications

iWorX ASM2 Application guide

iWorX

iWorX ASM2 Application guide

VIPA IM Series manual

VIPA

VIPA IM Series manual

Ebyte LoRa SX-1276 1W user manual

Ebyte

Ebyte LoRa SX-1276 1W user manual

Quectel BG95 Series Application note

Quectel

Quectel BG95 Series Application note

AEM VCU200 user guide

AEM

AEM VCU200 user guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.