CMP Cleat Installation Instructions
1. Place the cable cleat in desired
location on mounting surface and
unhinge the cable cleat.
2. Insert base booster if required.
4. Tighten down to specified
torque rating of 8Nm (2 bolt option
pictured).
6. Using supplied mouthpiece
fittings, tighten down to no more
than 8Nm with 19mm nut spanner.
3. Secure cleat to the mounting surface
using 1x M10 bolt (3a) or 2 x M10 bolts (3b),
adding a washing and nut on both sides.
5. Place the cable into the cleat
and pull the hinged arm over the
cables.
Nut
Spacer
Note: Cleat marking can be found on hinged arm
Booster (3a)
(3b)