D-EIMHP01601-22_00EN 2/25
Index
1. INTRODUCTION...................................................................................................................................................4
1.1 Options and features (1).............................................................................................................................5
1.2 Features .......................................................................................................................................................5
2OPERATION RANGE...........................................................................................................................................6
3SELECTION OF LOCATION................................................................................................................................7
4MAIN COMPONENTS ..........................................................................................................................................7
5INSPECTING AND HANDLING THE UNIT..........................................................................................................8
6UNPACKING AND PLACING THE UNIT.............................................................................................................8
7IMPORTANT INFORMATION REGARDING THE REFRIGERANT USED.........................................................8
8SELECTION OF PIPING MATERIAL...................................................................................................................9
9CONNECTING THE REFRIGERANT CIRCUIT...................................................................................................9
9.1 Precautions when handling piping ...........................................................................................................9
9.2 Connecting the refrigerant circuit...........................................................................................................10
9.3 Leak test and vacuum drying...................................................................................................................11
9.4 Open the discharge- and liquid stop valves...........................................................................................11
9.5 Next perform a fine-tuning .......................................................................................................................12
10 CHECKING THE WATER CIRCUIT...................................................................................................................13
10.1 Connecting the water circuit....................................................................................................................14
10.2 Water charge, flow and quality ................................................................................................................15
10.3 Water piping insulation ............................................................................................................................15
10.4 Refrigerant piping insulation...................................................................................................................15
10.5 Antifreeze protection for BPHE and recovery exchangers...................................................................15
11 FIELD WIRING....................................................................................................................................................16
11.1 Point for attention regarding quality of the public electric power supply ..........................................16
11.2 Interconnection cables.............................................................................................................................16
12 OPERATOR’S REPONSIBILITIES ....................................................................................................................17
13 MAINTENANCE..................................................................................................................................................18
13.1 Routine maintenance................................................................................................................................18
13.2 Electrical Installation ................................................................................................................................19
13.3 Service and limited warranty ...................................................................................................................19
14 BEFORE STARTING..........................................................................................................................................22
List of tables
Table 1-Technical specifications(1) ............................................................................................................................4
Table 2-Electrical specifications(1).............................................................................................................................4
Table 3- Flare nut spaces dimensions and appropriate tightening torque.........................................................10
Table 4-Charging the unit........................................................................................................................................12
Table 5- Water quality specification........................................................................................................................14
Table 6-Water flow operation range........................................................................................................................15
Table 7-Zmax (Ω) .......................................................................................................................................................16
Table 8-R410A Pressure / temperature table........................................................................................................18
Table 9–Standard Routine Maintenance Plan..........................................................................................................19
Table 10- Routine Maintenance Plan for Critical Application and/or Highly Aggressive Environment...........20
Table 11-Pre-commissioning check-list .................................................................................................................22
List of figures
Figure 1- Operation range EWLQ014-033KC............................................................................................................6
Figure 2-EWLQ049-064KC..........................................................................................................................................6
Figure 3-Connecting the refrigerant circuit (1) ......................................................................................................10
Figure 4-Connecting the refrigerant circuit (2) ......................................................................................................10
Figure 5-Connecting the refrigerant circuit (3) ......................................................................................................11
Figure 6- Connecting the refrigerant circuit (4) .....................................................................................................11
Figure 7- Charging the unit......................................................................................................................................12
Figure 8- Water piping evaporator-plastic bag 1 ...................................................................................................13
Figure 9-Water piping condenser-plastic bag (2) ..................................................................................................13
Figure 10-Flowswitch installation ...........................................................................................................................14
Figure 11- EWLQ 049 - 064 KCW1N Refrigerant circuit scheme..........................................................................21