
Installation and mounting manual for EK-D5 Dual TOP
This product is intended for installation only by expert users. Please consult with a qualified technician for installation. Improper installation may result in damage to your equipment. EKWB d.o.o. assumes no liability
whatsoever, expressed or implied, for the use of these products, nor their installation. The following instructions are subject to change without notice. Please visit our web site at www.ekwaterblocks.com for updates.
The barb hose fittings require only a small amount of force to screw them in; otherwise the high flow fittings might break. These fittings do not need to be tightened with much force because the
liquid seal is made using o-rings.
EKWB recommends 24 hour leak testing for all EK products before powering on the computer. This will eliminate any damages that may occur because of the users improper installation or
products imperfections.
STEP 1: GENERAL INFORMATION. Sample picture of EK-D5 Dual TOP mounted with two Laing D5 pumps (MCP 655) – (Left picture)
Picture of enclosed parts in delivery.
STEP 2 and 3: PREPARING THE PUMP AND ASSEMBLING THE “EK-D5 Dual TOP” WITH TWO PUMPS
One outlet has to
be closed with
enclosed G1/4
2 OUTLETS
1 INLET
Place one 5,25« bay
holder here and on
opposite side:
2. PREPARING THE PUMP.
Installation manuals for products: (EAN# 3831109842508 and 3831109842515) Releasedon4thofNovember,2009.
Take your Laing D5 or MCP655 branded pump.
Unscrew the Screw ring and take only motor
with impeller. (the rest parts of the pump
delivery you will not need.)
Use 16 pcs of M4×16mm screws
to mount the pumps to the top.
Use enclosed 2,5mm Alen key.
Place the o-ring here
Place the o-ring here
3. ASSEMBLING THE “EK-D5 Dual TOP”
WITH TWO PUMPS
Take motor with impeller of your Laing D5 or
MCP655 branded pump. Place it according to
right picture. Do not forget to place o-rings
that are enclosed in “EK-D5 Dual TOP” box.
Use enclosed 2,5mm Allen key to screw the 16
M4×16mm screws to secure the pumps.