
98409C (Rev. F - 08/18)
EDFPVR217RC
Page 4
INSTALLATION INSTRUCTIONS
MARBLYTE BACK PANEL
Care and Maintenance of Halsey Taylor Marblyte Fountains
1. Wall should already be framed for the fountain using the positioning dimensions shown in Fig 3. Shown
dimensions pertain to installation location (framing must support up to 150 lbs. weight).
2. Install rough-in plumbing as shown in Fig 3. Run supply water inlet line and connect to a service stop (not
provided).Turnonsupplywaterandushthoroughly.Closewatersupply.
3. Remove bottom access panel from fountain basin and save the screws. Install the fountain to the back panel
and wall using (4) 5/16" bolts and washers (not provided). Bolts should be long enough to securely fasten the
fountain to the wall. Tighten securely, but do not over tighten. Over tightening will crack the Marblyte Fountain.
4. Remove elbow from end of p-trap (item 1) and attach it to drain tube. Re-attach elbow to p-trap and cut
waste tube to required length using plumbing hardware and trap as guide.
5. Make water supply connections from service stop to the fountain strainer (Item 16) by inserting the water
inlet line into the inlet side of strainer until it reaches a positive stop about 3/4", (See Fig 1, Page 1). Turn
on water supply and check for leaks. Newly installed water supply line should be insulated after leak check is
completed. DO NOT SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS
MAY RESULT.
6. These products are designed to operate on 20-105 PSI supply line pressure. If inlet pressure is above 105
PSI, a pressure regulator must be installed in the supply line. Any damage caused by reason of connecting
these products to supply line pressure lower than 20 PSI or higher than 105 PSI is not covered by warranty.
7. Check stream height from bubbler. Stream height is factory set at 45-50 PSI. If supply pressure varies
greatly from this, adjust the screw on regulator item 3 (See Fig 5) by using a small screwdriver through the
small hole in the push button item 8 (See Fig 5). Clockwise adjustment will raise stream height and
counter-clockwise adjustment will lower stream height. For best adjustment stream height should be
approximately 1-1/2" (38mm) above the bubbler.
8. Replace bottom access panel to fountain basin using screws provided. Tighten securely.
Elkay Composite fountains provide an extremely durable, nonporous surface which resists staining. Care
is very simple. Routine cleaning with a soft sponge or cloth, or with water or non-abrasive aerosol foam
cleaner, is all that is normally needed to give many years of trouble free service. Cleaners left standing
onthefountainsurfacecandullthesurfacenish.Becertaintorinseallcleaningagentscompletelyand
polish with a soft cloth.
Harsh abrasive cleaners are not required and should not be used.
Mild abrasives such as liquid automotive cleaning compound or baking soda paste will remove simple
scratches and stains. Cigarette burns can normally be removed without noticeable effect. Deeper
scratchesorgougescanbecorrectedwithnegritsandpaper(240gritthen400grit)oragreen
Scotchbrite pad.
To maintain or regain luster and make cleaning easier, periodic applications of automobile wax or like
productswillkeepthenishlookinglikenew.
Orice Assy:Mineraldepositsonoricecancausewaterowtospurtornotregulate.Mineraldepositsmay
beremovedfromtheoricewithasmallroundlenotover1/8"diameterorsmalldiameterwire.CAUTION:
DO NOTleorcutoricematerial.
Stream Regulator:Iforiceisfreeofmaterialdeposits,regulateowasininstructionson(Page4,Step8).If
replacement is necessary, see parts list for correct regulator part number.
Actuation of Quick Connect Water Fittings: Cooler is provided with lead-free connectors which utilize an
o-ringwaterseal.Toremovetubingfromthetting,relievewaterpressure,pushinonthegraycollarwhile
pullingonthetubing.(SeeFig2,Page1).Toinserttubing,pushtubestraightintottinguntilitreachesa
positive stop, approximately 3/4".
TROUBLE SHOOTING & MAINTENANCE