manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Elster
  6. •
  7. Controllers
  8. •
  9. Elster J48 Training manual

Elster J48 Training manual

J48 2½”- 6”
Commissioning Instructions
OPERATING INSTRUCTIONS
•Ensure that this product is suitable for the chosen application.
•Installation, adjustment and maintenance by authorised, trained personnel only.
•When being fitted to an appliance, refer to the appliance manufacturers
instructions.
FITTING UNITS INTO PIPEWORK
1. Remove the protection from the inlet and outlet ports.
2. Ensure that the installation pipework is thoroughly clean.
3. The direction of gas flow must be the same as the arrows on the regulator body.
See Fig. 1.
4. Install regulator into pipework.
INSTALLATION OF EXTERNAL IMPULSE LINE (IF REQUIRED)
1. Remove the plastic protection plug.
2. Connect the impulse line (½"), using a jointing compound approved to national
standards, and lead to a point downstream not less than ten times the nominal
pipe diameter from the outlet. See Fig. 2.
INSTALLATION OF VENT LINE (IF REQUIRED)
1. Remove breather cover from regulator top case / cover.
2. Connect the vent line (½"), using a jointing compound approved to national
standards, and lead to atmosphere in accordance with national standards.
Ensure that no water can penetrate vent pipe. See Fig. 3.
3. If vent connection is to be used for top loading or other similar use refer to your
own installation instructions.
SETTING OF OUTLET PRESSURE
1. Turn off inlet and outlet valves.
2. Remove top cap.
3. For L.P. 65mm and 80mm unit insert ½" square socket extension piece into
square hole, or flat blade screwdriver into slot in spring adjuster. See Fig. 4.
4. For H.P. 65mm and 80mm unit and L.P. 100mm and 150mm unit, slacken
locknut on spring adjusting stem and connect suitable spanner (24mm A/F) to
hexagon of spring adjusting stem. See Fig. 5.
5. For 100mm and 150mm H.P. unit connect suitable spanner (27mm A/F) to
hexagon of spring adjusting nut. See Fig. 6.
6. Turn spring adjustment anticlockwise to reduce pressure on loading spring.
7. Slowly turn on inlet supply.
8. Increase loading on spring by turning spring adjustment clockwise until the
required outlet pressure, plus approximately 2.5mbar, is obtained).
9. Commission downstream appliance(s).
10. Trim the outlet pressure of the regulator, if necessary, when normal working flow
rates have been achieved.
11. Replace the top cap.
Warning! Incorrect installation, adjustment, modification, operation and maintenance may
cause injury or damage.
Read the instructions before use. This control must be installed in accordance with the rules in
force.
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Contacts
United Kingdom Germany USA
Elster Jeavons Elster GmbH Elster American Meter
Tollgate Business Park, Beaconside Steinern Str. 19 - 21 2221 Industrial Road
Stafford, Staffordshire ST16 3HS 55252 Mainz-Kastel Nebraska City, NE 68410-6889
T +44 1785 275200 T +49 6134 605 0 T +1 402 873 8200
F +44 1785 275305 F +49 6134 605 223 F +1 402 873 7616
www.jeavonsltd.co.uk www.elster-instromet.com www.elster-meterservices.com
[email protected]er.com [email protected]
C483EN01
A25.1.2008
Subject to change without prior notice All rights reserved
Subject to change without prior notice All rights reserved
J48: 2½” – 6” Commissioning Instructions
IF THE REQUIRED OUTLET PRESSURE CAN NOT BE ACHIEVED WITH
THE SPRING FITTED.
1. Choose a loading spring from the catalogue that will give the required outlet
pressure range.
For L.P. 65mm and 80mm units: See Fig. 7.
2. Remove top cap.
3. Fully unscrew and remove the spring holder.
4. Remove loading spring.
5. Insert new loading spring.
6. Screw spring holder back in place ensuring that spigot is located in loading
spring.
7. Adjust the outlet pressure, as described earlier, until the required setting is
achieved.
8. Replace top cap.
For H.P. 50mm and 80mm & L.P. 100mm and 150mm units: See Fig. 8.
9. Remove top cap.
10. Slacken locknut on spring adjusting stem.
11. Turn spring adjuster anticlockwise to reduce loading on spring.
12. Unscrew spring adjusting bush.
13. Remove top spring holder and loading spring.
14. Insert new loading spring.
15. Place top spring holder over spring ensuring that spigot is located in loading
spring.
16. Screw spring adjusting bush into top cover making sure that the end of the stem
is located in the recess in the top spring holder.
17. Adjust the outlet pressure, as described earlier, until the required setting is
achieved.
18. Tighten locknut.
19. Replace top cap.
For H.P. 100mm and 150mm units: See Fig. 9.
20. Remove top cap.
21. Turn spring adjusting nut anticlockwise to reduce loading on spring.
22. Remove 8 hexagon head screws that secure top cover to top diaphragm case.
Carefully lift off top cover assembly and gasket.
23. Remove loading spring.
24. Install new loading spring over spring location washer in centre of diaphragm.
25. Replace gasket and top cover assembly and secure with 8 hexagon head
screws.
26. Adjust the outlet pressure, as described on earlier, until the required setting is
found.
27. Replace top cap.
Fig. 6
Fig. 7
Fig. 9
Fig. 8

Other Elster Controllers manuals

Elster J125B Training manual

Elster

Elster J125B Training manual

Elster J48Z Training manual

Elster

Elster J48Z Training manual

Elster MR HP20 User manual

Elster

Elster MR HP20 User manual

Elster J125 User manual

Elster

Elster J125 User manual

Elster EnCal 3000 Guide

Elster

Elster EnCal 3000 Guide

Elster SR113 User manual

Elster

Elster SR113 User manual

Elster J48HL User manual

Elster

Elster J48HL User manual

Popular Controllers manuals by other brands

Kinco KS Series manual

Kinco

Kinco KS Series manual

Mitsubishi Electric PAC-IF011B-E installation manual

Mitsubishi Electric

Mitsubishi Electric PAC-IF011B-E installation manual

SOMFY animeo KNX Master Control W2 manual

SOMFY

SOMFY animeo KNX Master Control W2 manual

Autonics SPC1 Series quick start guide

Autonics

Autonics SPC1 Series quick start guide

Danfoss VLT 6000 series manual

Danfoss

Danfoss VLT 6000 series manual

Siemens SIMATIC S7-200 manual

Siemens

Siemens SIMATIC S7-200 manual

Primare SPA22 Upgrade instructions

Primare

Primare SPA22 Upgrade instructions

SOMFY Axovia multi installation instructions

SOMFY

SOMFY Axovia multi installation instructions

HEIDENHAIN GAGE-CHEK 2000 operating instructions

HEIDENHAIN

HEIDENHAIN GAGE-CHEK 2000 operating instructions

Teddington TCX instruction manual

Teddington

Teddington TCX instruction manual

Siemens SIMATRIX Programming manual

Siemens

Siemens SIMATRIX Programming manual

Sun Yeh Electrical OM Series Operation manual

Sun Yeh Electrical

Sun Yeh Electrical OM Series Operation manual

Traxxas EVX-2 Marine instructions

Traxxas

Traxxas EVX-2 Marine instructions

NEC N8190-154 user guide

NEC

NEC N8190-154 user guide

Atal ST485-101 manual

Atal

Atal ST485-101 manual

Philips Dynalite DBC1205 installation manual

Philips

Philips Dynalite DBC1205 installation manual

Mitsubishi A1SJH(S8) user manual

Mitsubishi

Mitsubishi A1SJH(S8) user manual

Partflow MRC 500 Installation, wiring, operation manua

Partflow

Partflow MRC 500 Installation, wiring, operation manua

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.