
5
Installation overview steps
For more information, refer to Celerra Tools on http://Powerlink.EMC.com
Installation steps:
1. Review and complete the Celerra worksheet, pages 29-34, and verify that the site is
properly prepared for the installation of your Celerra NS-480.
About 20 minutes.
2. If your Celerra NS-480 is to be installed in a customer-supplied rack, use this document to unpack
the system from the mini-rack shipping container, remove the reusable rails, and install the system
in your available rack.
About 40 minutes.
Note: If your Celerra NS-480 system arrived at your site in a pre-installed cabinet and is
previously cabled, verify the cabling before you begin the use of your system.
Cable your system according to the instructions and illustrations contained in this document.
Ensure that all of your cables are seated securely.
About 45 minutes.
3. When you install your Celerra NS-480, use the Celerra Startup Assistant (CSA) to pre-configure
your system. The latest version of the CSA can be downloaded from the Celerra Tools section
on Powerlink®. The CSAis also on the Celerra Applications & Tools CD.
About 15 minutes.
4. Register your system with the service provider. If you do not register your system now, using the
Celerra Startup Assistant, your request for support from your service provider will be delayed.
You can also register your Celerra NS-480 by downloading the Registration Wizard on Powerlink.
About 5 minutes.
Implementation step:
5. After you have registered your Celerra NS-480 system, you must configure the system for
production. You can use the Provisioning Wizard in the CSA, one of the several pre-packaged
implementation configurations based on common usages, or your own implementation using
Unisphere to configure your system. At the end of each one of these configurations,
your system will be ready for production.