IMPORTANT SAFETY INSTRUCTIONS 1..........................................................
SAVE THESE INSTRUCTIONS 1..................................................................
1.0 Preliminary Operations 1..................................................................
1.1 Inspection 1........................................................................................
1.2 Handling 1.........................................................................................
1.3 Operating limits 2....................................................................................
1.4 Noise level limits 3...................................................................................
1.5 Product Description 4................................................................................
2.0 Positioning -- unit placement 8............................................................
3.0 UNPACKING AND Installation 13...........................................................
3.1 Reference guide for receiving, unpacking, and preparing for installation. 13...................................
3.1.1 Equipment Inspection 13.............................................................................
3.1.2 Packing Material 13..................................................................................
3.2 Recommended Unit Handling Equipment 13.............................................................
3.3 Handling the Unit While Packaged 13...................................................................
3.4 Unpacking the Unit 14................................................................................
3.5 Removing the Unit from the Pallet using Piano Jacks 14...................................................
3.6 Removal of Piano Jacks 16............................................................................
3.7 Installation 17.......................................................................................
4.0 Refrigeration Connections 20..............................................................
4.1 Refrigeration pipeline connections Air --- cooled (A) units 20................................................
4.1.1 General layout (Tab. b) 20.............................................................................
4.1.2 Pipe diameter and thickness 21........................................................................
4.1.3 Installing pipelines 21................................................................................
4.2 Vacuum creation and refrigerant charge 23..............................................................
4.2.1 R410A precharge Air --- cooled (A) units 24..............................................................
4.2.2 Refrigerant charge Air --- cooled (A) units 24.............................................................
4.3 Refrigeration circuits 24...............................................................................
5.0 Water Connections 25.....................................................................
5.1 General warnings 25.................................................................................
5.2 Water connections – supply humidifier and drain water (all units) 25.........................................
5.3 Chilled water connections Water/Glycol --- cooled (W) units 26.............................................
5.3.1 Notes for open circuit applications 27...................................................................
5.3.2 Notes for closed circuit applications 27..................................................................
5.4 Chilled water connections Chilled water (C) units - (Fig. k) 27...............................................
6.0 Electrical Connections 29.................................................................
6.1 Electrical connections 29.............................................................................
6.2 Protective features of EC fan 30.......................................................................
6.3 Protective features of Electrical Heaters 30...............................................................
6.4 Temperature probes placed on racks 30.................................................................
7.0 Start-- up 34..............................................................................
7.1 First start---up (or after long standstill) 34................................................................
7.2 Automatic restart 35..................................................................................
7.3 Checking the refrigeration piping pressure drops 35......................................................
7.4 Chilled water valve Chilled water (C) units 35.............................................................
8.0 Operation 36.............................................................................
9.0 Calibrations & Regulation (at start -- up) 37..................................................
9.1 Setting the thermostatic expansion valve 37.............................................................
9.2 Water leakage sensor (Liquistat) 37.....................................................................
9.3 Environment protection 37............................................................................