
Getting Started
After unpacking from the shipping
materials, set the unit on the bench-top.
Unscrew the front Foot Pad and L
bracket, turn L bracket over, and screw
Foot Pad back into place. This provides a
stop so the unit does not move backward
in use.
Connect the air supply. An optional Tee
fitting and Hex Nipple are supplied so that
a single air line may be used to power
both the Rivet Presenter and the Rivetool.
Plug in the Electric Power cord and turn on the
Power Switch.
Add rivets to the Reservoir up to the fill line
shown inside. Insert the Rivetool into the
Presenter Receptacle and hold in place for a
few minutes to allow the Track to fill with rivets.
You are now ready to work.
Unit Operation
Insert the nose of the Rivet Setting Tool into the Rivet Presenter Receptacle and push it in
to activate the unit. Remove the tool and rivet.
When the tool is inserted into the Presenter the Feed Drum starts rotating and dropping
rivets into the track Orientation Plate. At the same time one air cylinder moves the Index
Head at the bottom of the Rivet Track, allowing one rivet to drop into the Bottom Chamber.
Another air cylinder pushes the dropped rivet into the Tool Nosepiece. The vacuum Mandrel
Collection System of the Tool holds the rivet into the Nosepiece when the tool is removed
from the Presenter.
For safest operation, be sure to keep Spring Guard in place and Reservoir Cover closed.
Emhart Teknologies - 50 Shelton Technology Center, Shelton CT 06484 - Tel. (203) 924-9341 - Fax (203) 925-3109 Page 4