
4
D40.18 Mode of operation .................................................................. 1
1 Preparing for operation ...............................................................................1
Required devices and aids .....................................................................1
Before starting work (in the morning or when starting paving) ...............3
Check list for the machine operator .......................................................3
1.1 Starting the paver finisher ..........................................................................6
Before starting the paver finisher ...........................................................6
"Normal" starting ....................................................................................6
External starting (starting aid) ................................................................9
After starting .........................................................................................12
Observe indicator lamps ......................................................................12
Battery charge indicator (2) ..................................................................12
Error message (3) ................................................................................12
Oil pressure indicator lamp for the diesel engine (4) ............................12
1.2 Preparation for transportation ...................................................................14
Driving and stopping the paver finisher ................................................16
1.3 Preparations for paving ............................................................................17
Separator fluid ......................................................................................17
Screed heater system ..........................................................................17
Direction marks ....................................................................................18
Loading/conveying material .................................................................20
Filling function ......................................................................................20
1.4 Starting for paving ....................................................................................22
1.5 Checks during paving ...............................................................................23
Paver function ......................................................................................23
Quality of the layer ...............................................................................23
1.6 Interrupting/terminating operation ............................................................25
During breaks in paving (e.g. delay due to material trucks) .................25
During longer breaks (e.g. lunch break) ...............................................25
When work is finished ..........................................................................27
2 Malfunctions .............................................................................................28
2.1 Error code display and query for engine ..................................................28
2.2 Error code display and query for travel drive computer ............................30
2.3 Problems during paving ............................................................................31
2.4 Malfunctions on the paver finisher or screed ............................................33
E10.18 Set-up and modification ........................................................ 1
1 Special notes on safety ..............................................................................1
2 Distribution auger .......................................................................................3
2.1 Height adjustment ......................................................................................3
2.2 Auger width extension and material shaft with protective cover
(optional equipment) ...................................................................................5
Push roller crossbar, adjustable .............................................................6
Hopper scraper ......................................................................................7
2.3 Crossbeam guide .......................................................................................8
3 Screed ........................................................................................................9
4 Electrical connections .................................................................................9
5 Limit switch ...............................................................................................11