3
4
4
[SSGS02x2]
A. Aach the 2 rear shelter posts [SSGS02]
to the side frames [SSGS1A/B], with
hex. head bolts [SSGS18], locknuts
[SSGS21] and washers [SSGS22].
A. Aach the crossbars [SSGS11] to the
back of the main frames [SSGS1A/B/
C/D], with hex head bolts [SSGS18],
lock nuts [SSG121] and washers
[SSGS22]— nger ghten.
B. Have the Back rest plank [SSGS08] in
place and secure it to the main
frames, by using hex head bolts
[SSGS13], lock nuts [SSG14]— nger
ghten.
[SSGS15X4]
[SSGS11x6]
[SSGS08]
[SSGS14x4]
[SSGS13x4]
[SSGS16X4]
[SSGS17X4]
[SSGS18x8]
[SSGS21x8]
[SSGS22x8]
A[SSGS22x8]
B
B. Aach the 2 front shelter posts [SSGS03]
to the side frames front [SSGS1A/B], with
hex. head bolts [SSGS18], locknuts [SSGS21]
and washers [SSGS22].
C. Aach the two lower crossbars
[SSGS07A/B] to the side frames
[SSGS1A/B], with hex. head bolts
[SSGS19], locknuts [SSGS21] and wash-
ers [SSGS22].
A
B
C
C
[SSGS03x2]
[SSGS07A/B]
[SSGS07A/B]
[SSGS18x4]
[SSGS21x4]
[SSGS22x8]
[SSGS21x4]
[SSGS22x4]
[SSGS19x4]
[SSGS21x4]
[SSGS22x4]
[SSGS19x4]
[SSGS11x6]
[SSGS10X1]