manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. FRAME IT ALL
  6. •
  7. Greenhouse Kit
  8. •
  9. FRAME IT ALL Alamo 8x8 User manual

FRAME IT ALL Alamo 8x8 User manual

800001171, 800001172, 800001173, 800001174,
800002171, 800002172, 800002173, 800002174,
800003171, 800003172, 800003173, 800003174,
800004171, 800004172, 800004173, 800004174,
RAISED GARDEN BED
8’ x 8’ Alamo
Layout your Boards along the borderline and connect each
Board together by inserting the top of the stake through the
bracket loops with the stake pointing to the sky. This enables
you to freely position your border to get your desired location.
Customer Service: 1800-914-9835 |
[email protected]m
© Frame It All. All Rights Reserved.
2 LEVEL KIT CONTAINS:
•Composite Boards 4’ x 16
•Composite Boards 2’ x 16
•Stacking Brackets x 48
•4-way Bracing Brackets x 16
•Stacking Stakes x 28
•Plugs x 128
•Caps x 14
ASSEMBLY INSTRUCTIONS –Level 1
STEP 1:
Assemble the Boards by sliding one end of Board into channel end
of one of the brackets. Use plugs to cover the holes on both sides to
lock the bracket in place.
1. Connect 8x 4ft Boards with Stacking Brackets on
both ends in alternating orientation.
2. Connect 6x 2ft Boards in the same pattern
FOR INDOOR & HARD SURFACE:
If you plan to assemble raised bed on a hard surface, use
hacksaw to remove the spike of each stake. Use these cut
down stakes for the base level only of your raised garden.
Trim stake spike with
hacksawfor use indoor
or on hard surfaces
How the Joints Work
Use plugs (included)
to cover the holes on
both side of Boards
Use plugs to
cover the holes
–two plugs are
required per
bracket (1 on
each side)
Use a Capto
complete the
top level.
Use stacking
stakes for
ground level
frames and
stacking
additional levels.
Use stacking
stake when
creating a
multi-level
Stacking stake fit
into the tops other
Stacking stakes
3-Way Connection:
Combine a top 4-way
bracket, mid-section 4-
way bracket and
stackingbracket.
3 LEVEL KIT CONTAINS:
•Composite Boards 4’ x 24
•Composite Boards 2’ x 22
•Stacking Brackets x 76
•4-way Bracing Brackets x 16
•Stacking Stakes x 42
•Plugs x 184
•Caps x 14
4 LEVEL KIT CONTAINS:
•Composite Boards 4’ x 32
•Composite Boards 2’ x 32
•Stacking Brackets x 96
•4-way Bracing Brackets x 32
•Stacking Stakes x 56
•Plugs x 296
•Caps x 14
1
2
Recommended Tools:
- Hammer
- Flathead Screwdriver
2 LEVELS
1 LEVEL KIT CONTAINS:
•Composite Boards 4’ x 8
•Composite Boards 2’ x 6
•Stacking Brackets x 28
•Stacking Stakes x 14
•Plugs x 56
•Caps x 14
1 LEVEL
ASSEMBLY INSTRUCTIONS –Level 1 Continued
1
1
2
Step 2: Layout the Boards for the first level according to the number of the
board in Step 1.
IMPORTANT: If you connect any brackets incorrectly, they can be removed by
inserting a flathead screwdriver into the opening of the snap-lock plugs, pushing into
the nub and twisting upwards.
Step 3: When connecting the boards for the first level, insert the stacking
stakes upside down so the stake is pointing to the sky. This will allow you to
adjust the shape of your frame before driving the stakes into the ground.
Step 3a: With the first level stacking stakes still facing the sky, use bracketed
2ft boards to ensure that the cross Boards will fit by placing the board over
the stacking stakes on the cross-board positions shown below.
1
1
1
1
2
22
Step 4: Once you finish with the adjustments of your base level frame,
remove the Boards sitting on level 2 and hammer the stacking stakes on level
1 into the ground.
11
22
STEP 5:
Connect the brackets and boards for the second level in the following pattern:
1. Connect 4x 4ft Boards with Stacking Brackets on
both ends in alternating orientation.
2. Connect 2x 4ft Boards with stacking brackets
on both sides, facing the same orientation.
3. Connect 4x 4ft Boards with a stacking bracket on
one end and a mid-section 4-way bracket on the
other end in alternating orientation.
4. Connect 2x 2ft Boards with Stacking Brackets on
both ends in alternating orientation.
5. Connect 2x 2ft Boards with a stacking bracket on
one end and a mid-section 4-way bracket on the
other end in alternating orientation.
6. Connect 2x 2ft Boards with mid-section 4-way brackets
on both ends in alternating orientation.
7. Connect 4x 2ft Boards with top 4-way brackets
on both ends, facing the same orientation.
ASSEMBLY INSTRUCTIONS –Level 2
1
2
3
4
5
6
7
Step 6: Layout the boards the second level of your design on the ground
around your base frame. Once they are all laid out, begin stacking and
connecting them starting at a corner and working your way out.
NOTE: Stacking stakes will be used for all additional levels and can insert into
the top of existing stakes.
2
2
5 5
3
77
66
3
77
11
Step 7: For a 3-level design, repeat steps 1 & 2. For the final 4th level,
repeat Step 5 & 6.
Step 8: Once your final level is installed, attack a finishing cap on top of
each joint and then you’re reading to fill with soil!
Happy Gardening!
44
1
1

This manual suits for next models

16

Other FRAME IT ALL Greenhouse Kit manuals

FRAME IT ALL Walk-through Center Cross 12x12 User manual

FRAME IT ALL

FRAME IT ALL Walk-through Center Cross 12x12 User manual

FRAME IT ALL Cumberland 6x8 User manual

FRAME IT ALL

FRAME IT ALL Cumberland 6x8 User manual

Popular Greenhouse Kit manuals by other brands

Dancover gh21200 manual

Dancover

Dancover gh21200 manual

ALUVILLA RINGO Assembly manual

ALUVILLA

ALUVILLA RINGO Assembly manual

Palram Snap & Grow 6x8 + 4 Extension manual

Palram

Palram Snap & Grow 6x8 + 4 Extension manual

CLIMA POD PASSION Assembly instructions

CLIMA POD

CLIMA POD PASSION Assembly instructions

ACF Greenhouses Grow More Shade Net Kit 6.5' Assembly instructions

ACF Greenhouses

ACF Greenhouses Grow More Shade Net Kit 6.5' Assembly instructions

harvst S14 Setup guide

harvst

harvst S14 Setup guide

ACD PRESTIGE AURELIE manual

ACD PRESTIGE

ACD PRESTIGE AURELIE manual

FarmTek Growers supply GrowSpan Gothic Pro instruction manual

FarmTek

FarmTek Growers supply GrowSpan Gothic Pro instruction manual

Exaco EOS ROYAL Assembly manual

Exaco

Exaco EOS ROYAL Assembly manual

ClearSpan R020B00002 installation guide

ClearSpan

ClearSpan R020B00002 installation guide

G-MORE GM37405 Assembly instructions

G-MORE

G-MORE GM37405 Assembly instructions

Palram CANOPIA HARMONY 6x4 / 2x1.3 How to assemble

Palram

Palram CANOPIA HARMONY 6x4 / 2x1.3 How to assemble

HI MOSTYN DUO CS quick start guide

HI

HI MOSTYN DUO CS quick start guide

Metalcraft GC1510 manual

Metalcraft

Metalcraft GC1510 manual

ShelterLogic 70517 instructions

ShelterLogic

ShelterLogic 70517 instructions

Forest WRGH quick start guide

Forest

Forest WRGH quick start guide

Halls SILVERLINE 86 LEAN TO manual

Halls

Halls SILVERLINE 86 LEAN TO manual

Floria RC Series manual

Floria

Floria RC Series manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.