
i
Contents
Preparing for installation ····································································1
Safety recommendations ·············································································································1
Examining the installation site·······································································································1
Temperature/humidity ··········································································································2
Cleanliness ························································································································2
EMI ··································································································································2
Laser safety ·······················································································································3
Installation tools·························································································································3
Installing the switch ··········································································4
Installing the switch in a 19-inch rack ·····························································································4
Mounting brackets ···············································································································4
Attaching the mounting brackets to the switch ···········································································5
Rack-mounting the switch ·····································································································7
Mounting the switch on a workbench······························································································7
Grounding the switch ··················································································································8
Grounding the switch with a grounding strip ··············································································8
Grounding the switch with a grounding conductor buried in the earth ground····································9
Installing and removing a power module (S5130-28F-EI switch)························································· 10
Installing a power module···································································································· 11
Removing a power module ·································································································· 11
Connecting the power cord ········································································································ 12
Connecting the power cord for an AC power module································································· 13
Connecting the power cord for a PSR150-D1 power module······················································· 14
Connecting a power cord for the built-in DC power module (S5130-28PS-EI switch) ························ 15
Connecting a DC power cord for the built-in DC power module (other switch models than S5130-28PS-EI)
····································································································································· 16
Verifying the installation············································································································· 17
Accessing the switch for the first time ················································· 18
Setting up the configuration environment ······················································································ 18
Connecting the console cable ····································································································· 18
Connecting the mini USB console cable (S5130-28PS-EI switch) ······················································· 19
Setting terminal parameters ······································································································· 21
Starting the switch···················································································································· 21
Setting up an IRF fabric ···································································23
IRF fabric setup flowchart ·········································································································· 23
Planning IRF fabric setup··········································································································· 24
Planning IRF fabric size and the installation site······································································· 24
Identifying the master switch and planning IRF member IDs ······················································· 24
Planning IRF topology and connections·················································································· 24
Identifying physical IRF ports on the member switches ······························································ 25
Planning the cabling scheme ······························································································· 25
Configuring basic IRF settings ···································································································· 27
Connecting the physical IRF ports ······························································································· 27
Verifying the IRF fabric setup······································································································ 28
Maintenance and troubleshooting ······················································29
Power module failure ················································································································ 29
Fixed power module failure·································································································· 29
Hot-swappable power module failure ····················································································· 30
Configuration terminal problems·································································································· 31
No display on the configuration terminal ················································································· 31
Garbled display on the configuration terminal ·········································································· 31