Open
No gas leakage?5.
Detach the charge hose6. from the service port, open 2-way valve and 3-way. Turn
In case of gas leakage, tighten parts of pipe connection. If
leakage stops, then proceed 6. steps
If it does not stop gas leakage, discharge whole refrigerants from the service
port.Afterflaringworkagainandvacuumize,fillupprescribed
refrigerant from the gas cylinder.
Anti countercurrent joint
Gaugemanifold(for R410A)
2-way valve Liquid Side
3-way valve Gas Side
Vacuum pump(for R410A)
Tube(for R410A)
Close
2-way valve
3-way valve
Open 90O
2-way valve
3-way valve
2-way valve 3-way valve
2-way valve
3-way valve
Valve rod cap
Valve rod cap
Service port cap
To prevent the gas leakage, turn the service port’scap,thevalve rod’scapfor2-w
ay
valve and 3-way’s a little more than the point where the torque increases suddenly.
After attaching the each caps, check the gas leakage around the caps.
7.
8.
Step 1. Step 2.
Step 3.
Step 7.
Step 6.
Step 4.
The power source must be exclusively used for air
ƽconditioner. (Over I0A)
In the case of installing an air conditioner in a moist place,
ƽplease install an ea-
For installation in other places, use a circuit breaker as far
ƽas possible.
Pipecuttingiscarriedoutwithapipecutterandbursmust beremoved.
Afterinsertingtheflarenut,flaringworkiscarriedout.
Iftherefrigerantoftheairconditionerleaks,itisnecessarytodischargeallthe
ƽ
refrigerant. Vacuum first, then charge the liquid refrigerant into air conditioner
accordingtotheamountmarkedonthenameplate.
Please do not let other cooling medium, except specified one (R410A), or air
ƽ
enter into the cooling circulation system. Otherwise, there will be abnormal
highpressureinthesystemtomakeitcrackandleadtopersonalinjuries.
PowerSourceInstallation
CuttingandFlaringWorkofPiping
CAUTION
FlaretoolforR410A Conventionalflaretool
Clutch-type clutch-type(Rigid-type) Wing-nut type (Imperial-type)
A 0~0.5mm 1.0~1.5mm 1.5~2.0mm
rth leakage breaker.
On Drainage
It becomes
high midway.
The gap with the
ground is too small
Thereisthebad
smell from a ditch
It waves.
The end is imm-
ersedinwater.
Pleaseinstallthedrainhosesoastobedownwardslopewithoutfail.
Please don’t do the drainage as shown below.
ƽ
ƽ
Pleasepourwaterinthedrainpanoftheindoorunit,and
ƽ
is carried out surely to outdoor.
In case that the attached drain hose is in a room, please
ƽapplyheatinsulationto
Less than
5cm
confirm that drainage
it without fail.
4
CheckItemsforTestRun
Put check mark in boxes
Gasleakfrompipeconnecting?
Heat insulation of pipe connecting?
Are the connecting wirings of indoor and outdoor firmly
Is the connecting wiring of indoor and outdoor firmly fixed?
Is drainage securely carried out?
Is the earth line securely connected?
Is the indoor unit securely fixed?
Is power source voltage abided by the code?
Is there any noise?
Isthelampnormallylighting?
Are cooling and heating (when in heat pump) performed normally?
Is the operation of room temperature regulator normal?
Please kindly explain to our customers how to operate
through the instruction manual.
Check for Installation and Test Run
Ƶ
inserted to the terminal block?
Ƶ
1
1+2= kg
R410A
2kg
2=
1=
B
C
D
FE
kg
A
This product contains fluorinated greenhouse gases covered by
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A
GWP* value:1975
GWP=global warming potential
Please fill in with indelible ink,
• 1 the factory refrigerant charge of the product
• 2 the additional refrigerant amount charged in the field and
• 1+2 the total refrigerant charge
on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop value cover).
A contains fluorinated greenhouse gases covered by the Kyoto
Protocol
B factory refrigerant charge of the product: see unit name plate
C additional refrigerant amount charged in the field
D total refrigerant charge
E outdoor unit
F refrigerant cylinder and manifold for charging
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
Refrigerant charge labelƵ
the valve rod counterclockwise.
Lean Damage of flare Crack Partial Too outside
Correct Incorrect
Flare tooling die 1.Cut pipe 2.Remove burs
3.Inserttheflarenut
4.Flare pipe
ƽ
ƽ
Detach the service port’s cap of1. 3-wayvalve,thevalverod’scapfor2-wayvalve
and 3-way’s, connect the service port into the projection of charge hose (Iow)
for gaugemanifold. Then connect the projection of charge hose (center) for gau-
gemanifold into vacuum pump.
Open the handle at Iow in
2. gaugemanifold, operate vacuum pump. If the scale-
moves of gause (Iow) reach vacuum condition in a moment, check 1. again.
3.
(76 cm Hg) at Iow pressure side. After the completion of vacuuming, close the
handle ‘Lo’ in gaugemanifold and stop the operation of the vacuum pump. Check
condition of the scale and hold it for 1-2min. If the scale-moves back in spite of
tightening, make flaring work again, the return to the beginning of 3 .
PurgingMethod:Tousevacuumpump
Open the valve rod for the 2-way valve counterclockwise to 90 degrees.4.
After 6 seconds, close the 2-wayvalveandmakethe inspection of gas leakage.
Vacuum for over 15min. And check the gauge which should read -0.1MPa