05/21 MODEL H1011.8HO/H1011.8HO2 PAGE 5 OF 10
INSTALLATION PROCEDURE …
STEP 8: Thoroughly flush supply line to remove all foreign matter. Connect 1/2” IPS supply
screwdriver-stop (not supplied) to stub-out in wall. Place chiller on chiller support tray
against right hand side, fully to rear, with condenser (open panel) side facing to front.
Install Y-Strainer, observing flow direction arrow on strainer, on the chiller inlet tube.
Install supply 3/8” O.D. tubing (not supplied), between screwdriver-stop and Y-
strainer on the chiller inlet. (Cut tubing to proper length and follow general notes for
proper connection procedures for push-in type fittings). Tubing insulation is not
normally required on inlet side of chiller. Cut copper tubing and insulation as required
and connect solenoid inlet(s) and push button valve inlet (if applicable) to outlets of
push to connect tee (supplied). Install 1/4”push to connect reducer (supplied) onto
outlet of chiller and insert reducer into remaining leg of 3/8”tee. Open screwdriver-
stop wide open while checking for leaks at all connections. Also, check waste for
leaks.
STEP 9: Model H1011.8HO (only): 5874 Series Valve -Adjust bubbler stream height using a
small flat-head screwdriver inserted through a hole in the center of the push button
for increased flow turn clockwise and for decreased flow turn counterclockwise. If
flow problems arise, see troubleshooting guide for additional instructions to correct
problem. Bubbler stream may lower during short break-in period. Set initial stream
height a little high to minimize or eliminate the need for break-in period readjustment.
Model H1011.8HO/H1011.8HO2: 5867 Valve Pressure Regulator –Adjust bubbler
stream height using the black pressure regulator mounted inside bracket that has
Hands Off (HO) sensor unit, by loosening the locknut and rotating the knob clockwise
to increase flow or counterclockwise to reduce flow. Tighten the locknut and check
flow height. Repeat these steps until the bubbler flow height is correct.
STEP 10: Verify that electrical power is off and power supply voltage, phase and cycle match
specifications printed on chiller label. In accordance with local codes, wire directly to
incoming lines at internal chiller junction box. Verify that all inner packing is removed
and hand rotate fan blade to verify free rotation. Reattach chiller front panel. Turn
power on and verify that chiller cycles after water reaches proper temperature.
Finally, check fountain for leaks.
STEP 11: 1RKHO.H or 2RHKO.H Series Transformer and Sensor Setup: Refer to the
RKHO Series manual for instructions (supplied).
STEP 12: Verify the chiller turns off after water reaches proper temperature. If there are any
problems, refer to Sensor/Solenoid Troubleshooting Guide section of the RKHO
Series manual.
STEP 13: Install grille and tighten outer side screws. Verify there is chilled water out of bubbler.
MAINTENANCE
STEP 1: Periodically clean the strainer located in the push button valve body on Model
H1011.8HO (Refer to 5874 Series Valve Manual for more information) and on chiller.
STEP 2: The condenser fins on chiller should be periodically cleaned with brush, air hose or
vacuum cleaner. Care should be taken not to bend or deform the condenser fins.
STEP 3: The chiller temperature control is factory set for 50° F water under normal conditions.
For colder water, adjust control clockwise. For warmer water, turn counterclockwise.