Haws H1119.8 Guide

03/20 Model H1119.8 Page 1 of 7
1455 Kleppe Lane Sparks, NV 89431-6467 (775) 359-4712 Fax (775) 359-7424
No. 0002080262 (22)
Model H1119.8
Water Cooler
INSTALLATION, OPERATION
&
MAINTENANCE INSTRUCTIONS
LIMITED WARRANTY
HAWS warrants that this specific product is guaranteed against defective material or
poor workmanship for a period of one year from date of shipment. HAWS liability
under this warranty shall be discharged by furnishing without charge F.O.B. HAWS
Factory any goods, or part thereof, which shall appear to the Company upon
inspection to be of defective material or not of first class workmanship, provided that
claim is made in writing to Haws within a reasonable period after receipt of the
product. Where claims for defects are made, the defective part or parts shall be
delivered to the Company, prepaid, for inspection. HAWS will not be liable for the
cost of repairs, alterations or replacements, or for any expense connected therewith
made by the owner or his agents, except upon written authority from HAWS, Sparks,
Nevada. HAWS will not be liable for any damages caused by defective materials or
poor workmanship, except for replacements, as provided above. Buyer agrees that
HAWS shall not be liable for general, special, or consequential damages claimed to
arise under the contract of sale. The drinking fountain manufactured by HAWS is
warranted to function if installation and maintenance instructions provided are
adhered to. The units also must be used for the purpose for which they were
intended.
NO OTHER WARRANTIES EXPRESSED OR IMPLIED ARE AUTHORIZED,
PROVIDED OR GIVEN BY HAWS.
CAUTION! Prior to making any electrical connections, verify with a voltmeter that power from the
service panel is off.
NOTE TO INSTALLER: Please leave this information with the Maintenance Department.
Haws electric water cooler’s are not designed or recommended for outdoor or corrosive
environments such as enclosed chlorinated pool areas.
Consideration must be made at the time of installation to adhere to state and/or local codes and
environmental/atmospheric conditions such as, but not limited to, dust, corrosion, freezing etc.
These conditions will void the warranty.

03/20 Model H1119.8 Page 2 of 7
RECOMMENDED TOOLS: Hack saw, pipe joint sealant, screwdriver, level, 12" adjustable
wrench, 10" pipe wrench, 5/64“ hex key wrench, 9/16”, 1/2", 7/16” socket wrench or open end
wrench.
LOCATION OF UNIT: The Model H1119.8 Cooler is a wheelchair accessible drinking facility.
The height dimensions shown, meet current ADA requirements. When installing this unit,
local, state or federal codes should be adhered to. If height other than shown is required, then
dimensions must be adjusted accordingly.
SUPPLY LINE: The minimum recommended line size is 1/2“IPS with 30-90 psi (2-6 ATM)
flowing pressure. Where sediment or mineral content is a problem, an inlet filter is
recommended.
PLUMBING CONNECTIONS: Inlet is 3/8” O.D. push-in type fitting. Waste trap outlet is
female 1-1/4” IPS.
ELECTRICAL CONNECTIONS: 115VAC, 60HZ, 4.7 AMPS. Chiller wired direct to incoming
line, by others.
PARTS LIST
MODEL PACKAGE
QUANTITY
ITEMS INCLUDED
MTGFR.LG
1
Mounting Frame (Required –Sold
Separately)
3
#10 Sheet Metal Screws
HCR8
1
Chiller
H1119.8
1
Bowl Assembly
1
Package supply tubing and fittings
1
Grille
2
Trap 1-1/4” IPS
1
Package of two each grille attachment
clips, clip nuts, #10 sheet metal screws
and 6-32 screws
8
5/16 -18 retainer nuts
8
5/16 –18 x 1 hex head screws
SHOULD YOU EXPERIENCE DIFFICULTY WITH THE INSTALLATION OF THIS
MODEL PLEASE CALL:
TECHNICAL SUPPORT: 1-800-766-5612
FOR CUSTOMER SERVICE: 1-888-640-4297

03/20 Model H1119.8 Page 3 of 7
INSTALLATION PROCEDURE
GENERAL NOTES:
The Model H1119.8 Water Cooler assembly requires installation of the mounting frame as
described in Steps 1 - 2, then mounting the fountain bowl assembly as described in Steps 3 - 6,
and finally completing chiller water and electrical connections and starting chiller per Steps 7 -
11. First check that all required parts are received.
Grounding may cause electrical feedback into the electric drinking fountain causing an
electrolysis, which creates a metallic taste or an increase in the metal content of the
water. This condition can be avoided by using dielectric couplings in the assembly. The
waste line, which is supplied by the installer, should also have a dielectric (plastic)
coupling to completely isolate the assembly from the building plumbing system.
NOTES:
1. For all plastic push-in type fitting connections, only connect NSF-61 copper or
plastic tubing. Stainless steel or glass tubing is not recommended. The
following assembly instructions must be followed to ensure a watertight
connection:
a. Cut tubing square and clean.
b. Mark from end of tube the length of insertion (See table below).
c. Push tube into the fitting until it bottoms out.
d. To remove, depress collet and pull tubing out.
Tube Sizes
O.D.
Tolerance
Insertion Depth
1/4”
±.005”
11/16”
3/8”
±.005”
3/4”
1/2”
±.005”
7/8”
STEP 1: Provide wall opening as detailed in Installation Drawing. Frame must be positioned
such that frame flanges overlap and butt against finished wall surface. Mounting
holes are provided for #6 sheet metal screws. After frame is positioned in wall,
swing chiller support tray into position (See Installation Drawing), align tray holes
with holes in frame and fasten with #10 sheet metal screws. Mounted frame must
support 50-pound chiller in addition to fountain weight and user generated forces.
STEP 2: Install waste, supply and electrical lines in locations shown in Installation Drawing.
Waste and supply lines may be installed for either rear or side entry. Verify proper
waste, supply, electrical and frame locations. Use level to verify horizontal and
vertical frame mounting to insure proper bowl drainage.
STEP 3: Installation Drawing shows fountain bowls, back panel and grille locations. Unpack
bowls and remove bottom plates using 5/64” hex allen wrench. Install back panel on
frame with narrower edge to bottom. Position nut retainers into mounting frame and
use two 5/16-18x1 hex head screws partially started in outside holes to support
panel. Install bowl/bracket assembly onto panel using eight 5/16-18x1 hex head
screws hand tightened. See sheet 2 of Installation Drawing for appropriate bowl
mounting pattern to use for this model.

03/20 Model H1119.8 Page 4 of 7
INSTALLATION PROCEDURE...
STEP 4: Remove 1-1/4” IPS outlet elbow from traps as supplied. Install elbow inside frame
onto waste stub-outs.
STEP 5: Assemble waste trap onto bowl strainer using seal washer provided and tighten nut
hand tight.
STEP 6: See Figure 1 for detail section view of side screw grille attachment. Unpack grille and
insert upper lip behind bottom of back panel, align sides and hold up flush to bottom
of back panel. Hold grille against wall and mark centers of grille side slots on wall.
Masking tape may be used to prevent finished wall damage from mark. Install the “s”
clips in mounting frame using #10 sheet metal screws into pre-drilled holes on lower
end of each side of frame. Tighten #10 screw while holding “s” clips centered on wall
marks. Check grille fit by installing grille and partially tightening #6-23 socket head
screws through side of grille. Insure proper panel and grille alignment, then tighten
eight 5/16-18x1 hex head screws.
STEP 7: Unpack and remove chiller from carton. Remove front panel screws and panel. Do
not remove insulating putty and foam from copper tubes or Styrofoam insulation from
evaporator coil. Remove any inner packing, which may be around compressor. If
applicable, remove junction box cover and electrical knock out on lower right side of
housing. Install fittings (supplied) on chiller inlet and outlet tubes (see Installation
Drawing).
STEP 8: Thoroughly flush supply line to remove all foreign matter. Connect 1/2" IPS supply
screwdriver stop to stub-out in wall. Place chiller on chiller support tray against right
hand side, fully to rear, with condenser (open panel) side facing to front. Install
supply 3/8” O.D. tubing (not supplied) between screwdriver stop and chiller inlet. (Cut
tubing to proper length, and follow general notes for proper connection procedures
for push-in type fittings). Tubing insulation is not normally required on inlet side of
chiller. Install insulated tube between fountain and solenoid valve outlet. Cut tubes as
required and connect to chiller outlet compression tee assembly. Open screwdriver
stop wide open while checking for leaks at all connections. Push fountain operator
to fill chiller and remove air from tubing.
FIGURE 1

03/20 Model H1119.8 Page 5 of 7
INSTALLATION PROCEDURE...
STEP 9: Adjust bubbler stream height using small flathead screwdriver inserted through a
hole in the center of the push button for increased flow turn clockwise and for
decreased flow turn counterclockwise. If flow problems arise, see troubleshooting
guide for additional instructions to correct problem. Bubbler stream may lower during
short break-in period. Set initial stream height a little high to minimize or eliminate the
need for break-in period readjustment.
STEP 10: Verify that electrical power is off and power supply voltage, phase and cycle match
specifications printed on chiller label. In accordance with local codes, wire directly to
incoming lines at internal chiller junction box. Verify that all inner packing is removed
and hand rotate fan blade to verify free rotation. Reattach chiller front panel. Turn
power on and verify that chiller cycles off after water reaches proper temperature.
Finally check for leaks.
STEP 11: Install grille and tighten outer side screws. Verify there is chilled water out of bubbler.
MAINTENANCE
STEP 1: Periodically clean the in strainer located inside the valve body. Refer to 5874 Series
Valve Manual for more information.
STEP 2: The condenser fins on chiller should be periodically cleaned with brush, air hose or
vacuum cleaner. Care should be taken not to bend or deform the condenser fins
STEP 3: The chiller temperature control is factory set for 50ºF water under normal
conditions. For colder water, adjust control clockwise. For warmer water, turn
counterclockwise. Remove front chiller panel for access to temperature control.
After adjustment allow unit to cycle off before checking outlet water temperature.
TROUBLESHOOTING
PROBLEM
REPAIR CHECKLIST
1.
Insufficient bubbler flow.
1a.
Check that inlet screwdriver stop valve is in wide-
open position.
b.
Verify minimum 30 psi flowing supply pressure.
c.
Clean strainer. See 5874 Series Valve Manual.
d.
Adjust valve to increase flow. Use front adjust
screw or see 5874 Series Valve Manual.
2.
Water too warm or cold.
a.
Adjust chiller temperature control, clockwise for
colder water.
For more information about Haws products, see our website: www.hawsco.com
© 2020 Haws®Corporation –All Rights Reserved
HAWS® and other trademarks usedin these materials are the exclusive property of Haws Corporation.

1
1
2
3
4
5
STRAINER ASSEMBLY
BACK PANEL
HEAD
BUTTON, PUSH, FLANGED, ASSY
BUTTON, PUSH, FLANGED, WITH VALVE
6
8
9
10 SPANNER WRENCH
CHILLER
MOUNTING FRAME
BOTTOM PLATE (LONG)
13
12
11 GRILLE
TRAP
7BOTTOM PLATE (SHORT)
2
5
3
4
67
11
10
8
9
12
APPROVED
DRAWN
PART NUMBER
SCALE: SHEET OF
REVISION
DRAWING TYPE: SIZE: A
BYECN NO.
PAGE
DATE
DATE
ECN:
REVISED PER
CHKD
Haws Corporation - All Rights Reserved
HAWS and other trademarks used in these materials are the exclusive property of Haws Corporation.
CR
MODEL(S)
1455 KLEPPE LANE
SPARKS, NEVADA 89431
(775) 359-4712 FAX (775) 359-7424
E-MAIL: [email protected]
WEBSITE: WWW.HAWSCO.COM
ITEM DESCRIPTION
THIS DOCUMENT IS TRUE AND CORRECT AT TIME OF PUBLICATION. CONTINUED PRODUCT IMPROVEMENTS
MAKE SPECIFICATIONS AND MEASUREMENTS SUBJECT TO CHANGE WITHOUT NOTICE.
WHEN ORDERING PARTS PLEASE SPECIFY MODEL NUMBER.
PART NO.
F.VASQUEZ
09-04-98
22
0002080262
H1119.8
.
1:4
11
FV
04/02/20
.
DP
6 OF 7
PARTS BREAKDOWN
5527
2020
FV
6462
0004023580
5703M
PBA6
5874PBF
0006983506
HCR8-300
MTGFR.LG
PBM1109
0002626651
0005982900
PBM1105
3REF
VALVE REPAIR KIT VRK5874
ROTATED 90° INTO VIEW
DETAIL A
REMOVE INSERT
WITH 5/16 HEX SOCKET
(NOT SUPPLIED)
2
NOTES:
15874PBF (ITEM 5) INCLUDES VRK5874 CARTRIDGE ASSEMBLY
(ITEM 13) AND PBA6 FLANGED PUSH BUTTON (ITEM 4).
2ENSURE TUBE IS DISCONNECTED FROM PUSH BUTTON VALVE
BODY PRIOR TO REMOVAL. APPLY ONE DROP OF LOCTITE
222MS TO NOZZLE THREADS PRIOR TO FASTENING BACK ONTO
BUBBLER HEAD. RE-ATTACH TUBE TO VALVE.
PARTS BREAKDOWN
13
1
1
1
**
** REQUIRED - SOLD SEPARATELY

54mm
2-1/8"
WALL FACE STUD
FLANGE
FRAME
FINISHED WALL FACE.
FRAME BUTTS AGAINST
STALLED SO THAT LIP OF
FRAME MUST BE IN-
IMPORTANT: MOUNTING
33"
838mm
38-5/8"
981mm
1"
25mm
FLOOR LINE
102mm
4"
127mm
5" ALT SIDE
MIN. FOR
ROUGH-IN
MOUNTING
FRAME
WIDTH
SUPPLY STOP AND
3/8" O.D TUBING
30-3/8"
772mm
SUPPLY
36-3/4"
933mm
WASTE
ELECTRICAL ACCESS
3-3/16"
81mm
38-3/4"
984mm
WASTE (BY OTHERS)
8"8"
32"
813mm
203mm 203mm
12-1/4"
18"
457mm
311mm
1/2"
13mm
1-1/4" IPS
TRAP (SUPPLIED)
CHILLER SUPPORT TRAY
(BY OTHERS)
686mm
27"
6"
152mm
791mm
WASTE
31-1/8"
12"
305mm
1. HOLD ROUGH-IN DIMENSIONS ± 1/8" (3.2mm)
2. WHEN INSTALLING THIS UNIT, LOCAL, STATE OR FEDERAL CODES SHOULD BE
ADHERED TO. FOR INSTALLATION HEIGHTS OTHER THAN SHOWN. DIMENSIONS
MARKED (*) MUST BE ADJUSTED ACCORDINGLY.
3 ALIGN HOLES IN CHILLER SUPPORT TRAY WITH HOLES IN FRAME
AND FASTEN WITH #10 SHEET METAL SCREWS.
4 REFER TO 5874 SERIES OPERATION AND MAINTENANCE MANUAL FOR
PUSH BUTTON AND VALVE INSTALLATION/MAINTENANCE INSTRUCTIONS.
5 REFER TO MTGFR.LG INSTALLATION DRAWING FOR ROUGH-IN DIMENSIONS.
6 INSERT 5/16"-18 PANEL INSERTS FROM OPPOSITE SIDE AT LOCATONS
SHOWN BY DARKENED HOLES. HOLE COMBINATIONS SHOWN ARE FOR USE
WITH LOW FOUNTIAN ON THE RIGHT AND THE HI FOUNTAIN ON THE LEFT.
USE OPPOSITE HOLES FOR HI ON RIGHT AND LOW ON LEFT.
7 HOLE COMBINATION SHOWN BELOW IS FOR USE WITH LOW
FOUNTAIN ON THE RIGHT AND HIGH FOUNTAIN ON THE LEFT.
USE OPPOSITE HOLES FOR HIGH ON RIGHT AND LOW ON LEFT.
8 TO CHANGE FOUNTAIN MTG. SCREW LOCATIONS: FIRST REMOVE
SCREWS AND THEN SQUEEZE CLIPS ON NUT RETAINER TO POP
OUT. SNAP INTO NEW POSITIONS AND RE-ASSEMBLE SCREWS.
9. IMPORTANT: A L.H. LOW (OPTIONAL) CONFIGURATION WILL REQUIRE
A DIFFERENT BACK PANEL AND THE WASTE AND SUPPLY
DIMENSIONS SHOWN (*) MUST BE REVERSED.
NOTES:
4
BOWL MOUNTING PATTERN DETAIL
5
5
SCREW
8
6
87
305mm
12"
37-5/8"
956mm
HCR8
CHILLER
3-15/16"
100mm
791mm
31-1/8"
5
INLINE STRAINER,
1/4" OD TUBE X
3/8" OD TUBE
INLET (SUPPLIED)
& FITTING
INSULATION, TEE
3/8" OD TUBING,
(SUPPLIED)
3
*
*
**
*
*
ROUGH-IN
ROUGH-IN
CLEARANCE
**
APPROVED:
DRAWN:
PART NUMBER
SCALE: SHEET OF
REVISION
DRAWING TYPE: SIZE: A
BY:ECN NO.
DATE:
DATE:
ECN:
REVISED PER
CHK'D.:
Haws Corporation - All Rights Reserved. HAWS and other trademarks used in these materials are the exclusive property of Haws Corporation.
CR
MODEL(S)
1455 KLEPPE LANE
SPARKS, NEVADA 89431
(775) 359-4712 FAX (775) 359-7424
E-MAIL: [email protected]
WEBSITE: WWW.HAWSCO.COM
THIS DOCUMENT IS TRUE AND CORRECT AT TIME OF PUBLICATION. CONTINUED PRODUCT IMPROVEMENTS
MAKE SPECIFICATIONS AND MEASUREMENTS SUBJECT TO CHANGE WITHOUT NOTICE.
F.VASQUEZ
09-01-98
22
0002080262.D
H1119.8
1:19
11
FV
04/02/20
.
DP
INSTALLATION
5527
2020
FV
MTGFR.LG
MOUNTING FRAME
REQUIRED - SOLD SEPARATELY
7 OF 7
Table of contents
Other Haws Water Dispenser manuals
Popular Water Dispenser manuals by other brands

clage
clage ZIP HYDROTAP G4 BC 100/75 Operating and installation instructions

PUR
PUR PPT711W owner's manual

Halsey Taylor
Halsey Taylor GBVAKC C owner's manual

gledhill
gledhill PulsaCoil PCS 120 Design, installation & servicing instructions

WaterGroup
WaterGroup WG185ACF75 owner's manual

Whirlpool
Whirlpool HD1000XSW8 Installation Instructions and Use & Care Guide